• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Finsbury Park

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
My only question is the new proposed footbridge and lifts offering step free access to the booking office, I would like to see how they proposed doing this - see the enclosed photo to see where the existing booking office is:

800px-Finsbury_Park_railway_stn_entrance_Station_Place.JPG


Would be nice though if they considered a canopy for users of Hertford North, there's currently only a tiny shelter on Platform 1 so when it rains in the peak, it's a case of having to shelter on the stairs.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
Is that the east side entrance? It's years since I left the station and went outside - but didn't TfL have plans for some major work on the west side of the mainline - maybe there's room to have a lift over there? IIRC TfL had plans on the go to put everyhting behind a proper barrier line as well at one stage.

I'll see if I can find anything on the local planning website in due course...
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Wikipedia states it's the Eastern entrance on Station Place.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
My only question is the new proposed footbridge and lifts offering step free access to the booking office, I would like to see how they proposed doing this - see the enclosed photo to see where the existing booking office is:
TBH, I don't think it's be that hard to install a lift. The little stall and the cashpoint visible in the picture you posted are pretty much directly beneath the disused island platform next to platform 1. A lift there gives you step-free access to that platform, from where you'll be able to access the new footbridge.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
Is that the east side entrance? It's years since I left the station and went outside - but didn't TfL have plans for some major work on the west side of the mainline - maybe there's room to have a lift over there? IIRC TfL had plans on the go to put everyhting behind a proper barrier line as well at one stage.

I'll see if I can find anything on the local planning website in due course...

The picture is of the east side of the station tho Im not sure theres much move for the lift in the current configuration as you enter then turn 90 degrees to get to a passage way to the platforms. It needs better layout and the barriers aren't the best idea ever.
 

barrykas

Established Member
Joined
19 Sep 2006
Messages
1,579
This brochure from December 2007 shows the work as originally proposed.

Briefly:
  • Extension to the Wells Terrace entrance
  • New ticket gates at all access points to the LU side of the station
  • Reinstatement of the (currently disused) passageway beyond the stairs leading to the "mezzanine" passageway that provides access to the NR platforms
  • Extension of said disused passageway to the passageway linking Wells Terrace and Seven Sisters Road
  • New lifts to the tube platforms in the extended passageway
  • Reinstatement of the second staircases in the existing "emergency" stairs between the tube platforms and "mezzanine" passage

Whether that's still the plan, I couldn't say for sure, as it's not on the "Projects and Schemes" page on the TfL site. I had to Google to find said leaflet.

Cheers,

Barry
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
Why was the island platform disused in the first place?

The "New Works Programme, 1935 - 1940" was the major investment programme delivered by the London Passenger Transport Board (LPTB), commonly known as London Transport, which had been created in 1933 to coordinate underground train, tram, trolleybus and bus services in the capital and the surrounding areas. The programme was to develop many aspects of the public transport services run by the LPTB and the suburban rail services of the Great Western Railway (GWR) and London and North Eastern Railway (LNER). The investment was largely backed by government assistance as well as by the issuing of financial bonds and was estimated to cost £42,286,000 in 1936 http://en.wikipedia.org/wiki/New_Works_Programme#cite_note-beyond2-0(approximately £2.13 billion today).http://en.wikipedia.org/wiki/New_Works_Programme#cite_note-inflation-UK-1

http://en.wikipedia.org/wiki/New_Works_Programme
 

pendolino

Member
Joined
22 Nov 2010
Messages
737
Why was the island platform disused in the first place?

The platforms originally served the trains to/from Edgware and Alexandra Palace (not the Alexandra Palace station on the ECML) along a line which was due to be electrified under the Northern Heights scheme, part of the New Works Programme, as ajax103 says.

The work was abandoned at the outbreak of WW2 and never completed; the line closed to passengers in 1954 and was used to shuttle empty tube stock to Drayton Park/Moorgate until 1970 (when this was still part of the tube) but it's now completely closed and you can walk along virtually the entire route to Highgate, then along the branch to Alexandra Palace.

It's a great walk if you like disused railway lines - I walked it a couple of weeks ago and have just finished writing about it.
 

Class377/5

Established Member
Joined
19 Jun 2010
Messages
5,594
The platforms originally served the trains to/from Edgware and Alexandra Palace (not the Alexandra Palace station on the ECML) along a line which was due to be electrified under the Northern Heights scheme, part of the New Works Programme, as ajax103 says.

The work was abandoned at the outbreak of WW2 and never completed; the line closed to passengers in 1954 and was used to shuttle empty tube stock to Drayton Park/Moorgate until 1970 (when this was still part of the tube) but it's now completely closed and you can walk along virtually the entire route to Highgate, then along the branch to Alexandra Palace.

It's a great walk if you like disused railway lines - I walked it a couple of weeks ago and have just finished writing about it.

Terrible waste of a line. My back garden backs on to this. Shame really as it would have produce a valuable link now.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,227
This brochure from December 2007 shows the work as originally proposed.

Briefly:
  • Extension to the Wells Terrace entrance
  • New ticket gates at all access points to the LU side of the station
  • Reinstatement of the (currently disused) passageway beyond the stairs leading to the "mezzanine" passageway that provides access to the NR platforms
  • Extension of said disused passageway to the passageway linking Wells Terrace and Seven Sisters Road
  • New lifts to the tube platforms in the extended passageway
  • Reinstatement of the second staircases in the existing "emergency" stairs between the tube platforms and "mezzanine" passage

Whether that's still the plan, I couldn't say for sure, as it's not on the "Projects and Schemes" page on the TfL site. I had to Google to find said leaflet.

Cheers Barry - turns out the only planning stuff I did find was about that project. I've a feeling responsibility for the site must be part TfL and part NR, and from the NR announcement all their proposals seem to be outside what TfL were proposing. All a bit odd...
 

barrykas

Established Member
Joined
19 Sep 2006
Messages
1,579
Cheers Barry - turns out the only planning stuff I did find was about that project. I've a feeling responsibility for the site must be part TfL and part NR, and from the NR announcement all their proposals seem to be outside what TfL were proposing. All a bit odd...
But not entirely unusual...Though I must admit I misread the original post and thought it was about lifts down to the tube platforms. D'oh! :oops:

Cheers,

Barry
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Why is it that all the entrances can't just be simply barriered? I've heard it's something to do do with a right-of-way issue through the station (to Wells Terrace?) but that can be dealt with by legal means- after all, it would hardly be a bad diversion to go round the outside. It's always mystified me this. Full step-free access though, now that would be a challenge.
 

transmanche

Established Member
Joined
27 Feb 2011
Messages
6,021
Why is it that all the entrances can't just be simply barriered? I've heard it's something to do do with a right-of-way issue through the station (to Wells Terrace?) but that can be dealt with by legal means- after all, it would hardly be a bad diversion to go round the outside. It's always mystified me this. Full step-free access though, now that would be a challenge.
Space. Or rather the lack of.

With the current layout, you'd be hard pressed to fit even three ticket gates at each entrance - and that would lead to dangerous overcrowding.

Hence the expansion plans that barrykas linked to earlier - which would have included reconstructing the Wells Terrace exit to fit six ticket gates. Looking at the plans, it would seem that the proposed new passageway would have its entrance where the stall and cashpoint is located in the photo ajax103 posted earlier.

But this is also the logical place to site the lifts to the NR platforms...
 

Fred26

Member
Joined
5 Mar 2010
Messages
1,107
The station wants demolishing and re-built properly. It can get join the queue though...
 
Status
Not open for further replies.

Top