Looking at the recent photos, I'm thinking that maybe there will be two separate steel structures, possibly without concreting anything. The heavy section steel Z-piles seen in post #863 could work in cantilever to form the abutment wall, ballast wall and wing walls. Then a separate bearing shelf (more like a bearing beam in this case) could be fixed across the plates bolted to the heads of the tubular piles - those bolted connections are designed to carry a substantial loading on their own. That beam would support bearings for the truss ends of the decks.
There again most of my speculations have turned out to be wrong so far and they might be again

. This looks like being quite an unconventional design.
Piles can be driven by drop hammer, air hammer, diesel hammer, vibrator or hydraulic ram, depending on ground conditions and the need to avoid effects on nearby buildings or people. The driver in post #863 and some earlier pictures looks like a diesel hammer to me - they're noisy but that's probably not an issue here. I'm unclear what the augers might have been used for, pre-boring doesn't seem to have been necessary in such soft ground. The diesel hammer would have been needed to achieve the required penetration or set in the firmer strata at toe level.