Jammy Dodger
Member
Moderator note: Split from https://www.railforums.co.uk/thread...now-also-its-busiest-the-economist-uk.248698/
Increasing frequency over increasing train length is probably the easier/cheaper option. In terms of where these services could terminate (think I've mentioned all of them):
East:
- Likely no more capacity at Abbey Wood, 12tph at 2 platforms is already too much, potential extension to Dartford/Gravesend would help with this though
- More terminus services at Gidea Park, followed by pulling off into the CS (would be easier to do with enough staff than the Paddington terminus services due to the decreased frequencies)
- If using an Abbey Wood - type system, Shenfield could handle 10/12tph on it's own fine
- Bay platform at Ilford could be squeezed in if necessary
- Custom House west crossovers mean Custom House could be used if needed, although this would likely impact other service frequencies (almost certainly not happening, ever)
West:
- Old Oak Common will provide terminus capacity of all current 12tph Paddington termini (they will be moving), giving new capacity at Paddington/Westbourne Park CS
- Bring the bay platforms at Hayes and Harlington/West Drayton/Maidenhead (back?) into regular use
- Possibility for a 5th (bay) platform at Iver on the goods line
- Additional capacity at Reading could almost certainly be found - there's a total of 9 accessible platforms there!
- Send more services to Heathrow, possibly whilst taking away a HEX path or two (would also increase space on the fast lines into Paddington)
Increasing frequency over increasing train length is probably the easier/cheaper option. In terms of where these services could terminate (think I've mentioned all of them):
East:
- Likely no more capacity at Abbey Wood, 12tph at 2 platforms is already too much, potential extension to Dartford/Gravesend would help with this though
- More terminus services at Gidea Park, followed by pulling off into the CS (would be easier to do with enough staff than the Paddington terminus services due to the decreased frequencies)
- If using an Abbey Wood - type system, Shenfield could handle 10/12tph on it's own fine
- Bay platform at Ilford could be squeezed in if necessary
- Custom House west crossovers mean Custom House could be used if needed, although this would likely impact other service frequencies (almost certainly not happening, ever)
West:
- Old Oak Common will provide terminus capacity of all current 12tph Paddington termini (they will be moving), giving new capacity at Paddington/Westbourne Park CS
- Bring the bay platforms at Hayes and Harlington/West Drayton/Maidenhead (back?) into regular use
- Possibility for a 5th (bay) platform at Iver on the goods line
- Additional capacity at Reading could almost certainly be found - there's a total of 9 accessible platforms there!
- Send more services to Heathrow, possibly whilst taking away a HEX path or two (would also increase space on the fast lines into Paddington)
Last edited by a moderator:
