The Chancellor George Osborne has given the go-ahead to the long-awaited redoubling of the Great Western railway line between Kemble and Swindon.
Supporters of the multi-million pound project were concerned it would fall victim to government spending cuts.
Doubling the line from single-track to a two-way service will cut a bottleneck on the Cheltenham to London route.
Mr Osbourne said savings in the Department for Transport had made it possible to commit to the scheme.
He added that it would compliment the electrification of the Great Western Line between London and Wales.
Reduced cost
Geoffrey Clifton-Brown, Conservative MP for the Cotswolds, said Network Rail had recently submitted a new feasibility study which demonstrated that the project could be completed for a much reduced cost of £41.7m instead of the original £52m.
"I'm obviously absolutely delighted, having campaigned long and hard for seven or eight years on this issue, to finally get the news that it's going ahead," he said.
"It's wonderful news for the people of Gloucestershire. I think it will make a huge difference to Gloucestershire businesses and rail travellers."
Cheltenham's Liberal Democrat MP Martin Horwood said it was "very welcome news".
"I think the electrification played a crucial part in it, because if you electrify the line through to Bristol and South Wales and make that a faster route, you need some back-up," he said.
"Of course, the current line can't provide that because it's a single track. Redoubled, it will be able to, so I think that electrification plan was a crucial last piece in the jigsaw."
The section between Swindon and Kemble was "singled" in the late-1960s as a cost-saving measure by British Rail, under agreement with the government.
The limitations have led to regular delays and cancellations to passenger services, Network Rail said.
Spokeswoman Mavis Choong said: "The value for money plan for the line between Swindon and Kemble will unlock the potential to bring more trains and better performance for passengers in Gloucestershire, Wiltshire and south Wales.
"We will now move to finalise the design plan with an aim to put the first spade in the ground soon."
Martin Horwood MP said:"I think the electrification played a crucial part in it, because if you electrify the line through to Bristol and South Wales and make that a faster route, you need some back-up," he said.
"Of course, the current line can't provide that because it's a single track. Redoubled, it will be able to, so I think that electrification plan was a crucial last piece in the jigsaw."
Excellent news. Is this likely to be a precursor to an improved frequency and even, if yes, potentially electrification soon after the rest of the line?
I'd hope to see hourly Paddington - Cheltenham eventually.
Indeed, according to SouthWestBusiness.co.uk, Paddington to Cheltenham is planned to be hourly from 2017.
It is hourly now, albeit with a change. I think the future hourly direct service would require sharing a path with something else due to congestion between Reading and Paddington, hence the joinable nature of the IEP.
In terms of the alternate Cheltenham path, I had a quick peek and I can't see that anything leaves Paddington at x48 in the even hour (M-F) and x15 in the odd hour on Saturdays. So presumably, units permitting (!), an hourly Cheltenham could be timetabled in easily.
It might also make decent business sense to run to Cheltenham first, and reverse to Gloucester, if such a thing is possible. The increased journey times might lead to much better revenues and it's a more lucrative market.
The GWML RUS shows a dedicated (ie not splitting/joining) hourly service to Cheltenham - there is an overall uplift from 8 to 13 LDHS services per hour off peak.
Current service frequencies are no real guide to the post electrication and Reading remodelling situation, as discussed in previous threads.
Hi,
Is one of the "hidden" reasons for going ahead with this project to upgrade an alternative route to Wales for electrification?
Let me clarify that: Electrification of the GWML should be relatively simple (thank you Brunel for a nice wide trackbed to work with) but there are going to be a few problems aren't there? The two I can think of are Box tunnel and the Severn Tunnel.
Surely it would be easier to close the tunnel entirely to electrify it? With Box tunnel, there is the diversionary route through Bristol Parkway and for any closures of the Parkway route the opposite diversion is good.
However for the Severn Tunnel surely that is going to need quite a long closure? The only diversion I can think of is the Kemble-Swindon route.
So is this being upgraded with the expectation that the Severn Tunnel will be closed for quite a period for electrification?
Of course this is all my personal speculation. I may be utterly wrong!
Cheers,
Jason
It might also make decent business sense to run to Cheltenham first, and reverse to Gloucester, if such a thing is possible. The increased journey times might lead to much better revenues and it's a more lucrative market.
Though perhaps if the frequency is increased to 1tph, one could bypass Gloster and go on to Worcester as an alternative to the Cotswold line (not checked, but I imagine the timing would be similar), providing a better connection between Gloucestershire and Worcester, and giving Ashchurch a direct London service. (Again, I've no idea whether this would be practicable)
If they can do it for £47m and Ordsall is £85m, what is the remaining £68m (£200m was named for 'regional railways' in the budget) earmarked for?
In terms of the alternate Cheltenham path, I had a quick peek and I can't see that anything leaves Paddington at x48 in the even hour (M-F) and x15 in the odd hour on Saturdays. So presumably, units permitting (!), an hourly Cheltenham could be timetabled in easily.
It might also make decent business sense to run to Cheltenham first, and reverse to Gloucester, if such a thing is possible. The increased journey times might lead to much better revenues and it's a more lucrative market.
I'd place electrification above linespeed increase on this route, as Swindon - Cheltenham would knock diesels of the INTERCITY services and Cheltenham - Severn Tunnel Jn. is a link in the ValleyLines network. It would, of course, also allow electric trains to be diverted around the tunnel without needing a diesel loco.Id expect to see some speed increases on the Gloucester - Severn Tunnel Jn section aswell, 75s up to 90 and the 90 up to 100 possibly.
I hope it's for something sensible like Portishead, but that's probably wishful thinking.If they can do it for £47m and Ordsall is £85m, what is the remaining £68m (£200m was named for 'regional railways' in the budget) earmarked for?
Great news if it goes ahead! I wonder what the impact on service will be - presumably no more trains, but should be more reliable (that single line is always causing delays). Should make scheduling more flexible too.
Hmm?
First timetable the trains poorly, there is only a 15 minute gap between services
What 15 gap? :?
"That single line" is 99% of the time not the cause of delays, its the fact that First timetable the trains poorly, there is only a 15 minute gap between services, and if you have a train from London that is late, which lets face it is a regular occurance it is going to cause a farce. The line should never have been altered in the first place to single track! If they were to redouble it there would be the same ammount of delays, however if something failed it would be easier to recover. I can think of several occasions over the past 3 months the GV has been used as a diversion for Cross Country and FGW services so its a useful line!
£47 million pounds for the bit of track between Swindon and Kemble ! How many miles is that ? The contractors who get this work will be laughing all the way to their (offshore) bank.
20 years ago, the Tisbury loop cost £400,000.
£47 million pounds for the bit of track between Swindon and Kemble ! How many miles is that ? The contractors who get this work will be laughing all the way to their (offshore) bank
Todays £47 million at 1990 prices comes out at £26.5 million.