• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

TfW class 398 Stadler Citylink tram trains

Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The_Train

Established Member
Joined
2 Jun 2018
Messages
5,247
There are 6 at Old Dalby I believe.
Anybody know the other 4 as I only have 001 and 006 at Old Dalby. A sensible bet would be that 002-005 are the missing 4 but anyone know for sure please?
 

trainlogger

Member
Joined
30 May 2015
Messages
38
Location
Portishead
398006 was in the shed at Taffs Wells depot on Thursday, taking the total there up to three. Not sure when it arrived- maybe Tuesday or Wednesday?
 

Attachments

  • 0794F7AF-3EA7-4049-AD47-02271C6ED799.jpeg
    0794F7AF-3EA7-4049-AD47-02271C6ED799.jpeg
    420.6 KB · Views: 306
  • EAE7486A-245A-4D37-84C1-BE2EF85B1DEA.jpeg
    EAE7486A-245A-4D37-84C1-BE2EF85B1DEA.jpeg
    599.7 KB · Views: 305

tomuk

Established Member
Joined
15 May 2010
Messages
2,009
398006 was in the shed at Taffs Wells depot on Thursday, taking the total there up to three. Not sure when it arrived- maybe Tuesday or Wednesday?
Why would you want to put multimillion pound rolling stock in the middle of a building site?
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,843
Why would you want to put multimillion pound rolling stock in the middle of a building site?
If they got bashed it would probably improve the looks. Those things are hideous - they fell out of the ugly tree and hit every branch on the way down.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,142
If they got bashed it would probably improve the looks. Those things are hideous - they fell out of the ugly tree and hit every branch on the way down.
I agree. Surely, the flat area low down would cause a derailment if it hit something like a log? The front of IET’s (Class 800’s) looks built to deflect obstructions.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,176
Location
Huyton
I agree. Surely, the flat area low down would cause a derailment if it hit something like a log? The front of IET’s (Class 800’s) looks built to deflect obstructions.

There's probably nothing much behind that panel other than the auto coupler.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
There's probably nothing much behind that panel other than the auto coupler.
The flat-fronted 150s, Pacers and first generation DMUs have been happily travelling up and down the Valleys for over six decades. The pointed noses on high-speed trains are probably more to do with aerodynamics which are more more significant at 125mph than 55mph.
 

janahan

Member
Joined
13 Feb 2014
Messages
135
I agree. Surely, the flat area low down would cause a derailment if it hit something like a log? The front of IET’s (Class 800’s) looks built to deflect obstructions.

As these are "Tram-Trains" and probably have some requirements about how they are shaped. Note the sheffield supertram Tram Train is very similar, though clever use of the paint job there does hide the angles better.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,176
Location
Huyton
The flat-fronted 150s, Pacers and first generation DMUs have been happily travelling up and down the Valleys for over six decades. The pointed noses on high-speed trains are probably more to do with aerodynamics which are more more significant at 125mph than 55mph.

The point wasn’t about the flat front though, it was about the front fenders being so low.
 

physics34

Established Member
Joined
1 Dec 2013
Messages
4,089
If they got bashed it would probably improve the looks. Those things are hideous - they fell out of the ugly tree and hit every branch on the way down.
There certainly isnt much emphasis put into looks these days.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,176
Location
Huyton
The 399s in South Yorkshire seemed to have done alright so far

Precisely.

Trams have to have such low skirts, the point I was making is there’s likely very little behind the fender, so should the vehicle run over a log or whatever it’ll be fine. The front fender on our M5000s is just fibreglass, it’s not structural in any way.
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,999
Location
UK
My apologies as I’m sure this has probably been covered at length already, but how are these to be worked - I presume some form of DOO/DCO?
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
My apologies as I’m sure this has probably been covered at length already, but how are these to be worked - I presume some form of DOO/DCO?
There will be guards on all services. No DOO at TfW. How involved they'll be in dispatch is still up for agreement.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,868
Location
Cambridge
There will be guards on all services. No DOO at TfW. How involved they'll be in dispatch is still up for agreement.
That surprises me. Seems like a waste of money to have guards on tram trains.
Edit: I’ve remembered these trams will serve some of the notoriously dodgy Valleys, never mind :lol:
 
Last edited:

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,533
Location
"Marston Vale mafia"
That surprises me. Seems like a waste of money to have guards on tram trains.

Pop up to Blackpool or Sheffield and ask the locals what they think of their "clippies", perhaps? The tramways without a staff presence seem to be the ones with serious antisocial behaviour issues.

I can't see them doing the doors, that said, but perhaps a Merseyrail like "dual dispatch" setup might happen? Stadler already have the technology developed for Merseyrail, which involves a guard (or whatever you call them) tapping a proximity card to confirm "ready to close up and go". It's kind of like a variation on Southern OBS but with more safety training.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,868
Location
Cambridge
Pop up to Blackpool or Sheffield and ask the locals what they think of their "clippies", perhaps? The tramways without a staff presence seem to be the ones with serious antisocial behaviour issues.

I can't see them doing the doors, that said, but perhaps a Merseyrail like "dual dispatch" setup might happen? Stadler already have the technology developed for Merseyrail, which involves a guard (or whatever you call them) tapping a proximity card to confirm "ready to close up and go". It's kind of like a variation on Southern OBS but with more safety training.
Actually yes, what am I saying? These trams will go through the Valleys for goodness sake. Realising that has changed my mind immediately :lol:
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
I can't see them doing the doors, that said, but perhaps a Merseyrail like "dual dispatch" setup might happen? Stadler already have the technology developed for Merseyrail, which involves a guard (or whatever you call them) tapping a proximity card to confirm "ready to close up and go". It's kind of like a variation on Southern OBS but with more safety training.
It's not set in stone yet, but I believe the proposals are for something fairly similar to the Merseyrail agreement alright.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
There will be guards on all services. No DOO at TfW. How involved they'll be in dispatch is still up for agreement.
Again! Trains ordered and specced without agreement on how they will be operated. Will there be a farce of the build being late and then still no services run as the unions refuse the method of working?
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
Again! Trains ordered and specced without agreement on how they will be operated. Will there be a farce of the build being late and then still no services run as the unions refuse the method of working?
Think tfw already got a agreement with the unions
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,999
Location
UK
I suppose the nuclear option would have been to have declared that the Valleys has become an LRT system or whatever and done away with the whole traditional traincrew set up, and staffed them with tram drivers. I’m pleased and surprised in equal measure that they didn’t!
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
I suppose the nuclear option would have been to have declared that the Valleys has become an LRT system or whatever and done away with the whole traditional traincrew set up, and staffed them with tram drivers. I’m pleased and surprised in equal measure that they didn’t!
Remember we have a left-wing Labour Government which announced in the earliest stages of the project that there would continue to be guards.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Again! Trains ordered and specced without agreement on how they will be operated. Will there be a farce of the build being late and then still no services run as the unions refuse the method of working?
RMT have already agreed the proposed method of working, they've been involved since early on in the project. The changes for ASLEF are party of a much bigger set of changes to the contract but I believe that part is also already agreed in principle. In any case, I believe the units are capable of being worked in the conventional manner anyway (as the 231s already are on the Rhymney line) it's just hoped that the new method of work will decrease dwell time at stations.

So the answer to your question is no.
 

Top