There are 6 at Old Dalby I believe.Any idea how many are there?
Or a question to others, how many of the 36 are built and/or in the UK?
There are 6 at Old Dalby I believe.Any idea how many are there?
Or a question to others, how many of the 36 are built and/or in the UK?
Anybody know the other 4 as I only have 001 and 006 at Old Dalby. A sensible bet would be that 002-005 are the missing 4 but anyone know for sure please?There are 6 at Old Dalby I believe.
001-006 are at Old Dalby.Anybody know the other 4 as I only have 001 and 006 at Old Dalby. A sensible bet would be that 002-005 are the missing 4 but anyone know for sure please?
Thank you001-006 are at Old Dalby.

The 2 units that I photographed were the only ones outside at the time. Too far away to get any numbers unfortunately.Any idea how many are there?
Or a question to others, how many of the 36 are built and/or in the UK?
Why would you want to put multimillion pound rolling stock in the middle of a building site?398006 was in the shed at Taffs Wells depot on Thursday, taking the total there up to three. Not sure when it arrived- maybe Tuesday or Wednesday?
If they got bashed it would probably improve the looks. Those things are hideous - they fell out of the ugly tree and hit every branch on the way down.Why would you want to put multimillion pound rolling stock in the middle of a building site?
It headed there Wednesday I believe.398006 was in the shed at Taffs Wells depot on Thursday, taking the total there up to three. Not sure when it arrived- maybe Tuesday or Wednesday?
I agree. Surely, the flat area low down would cause a derailment if it hit something like a log? The front of IET’s (Class 800’s) looks built to deflect obstructions.If they got bashed it would probably improve the looks. Those things are hideous - they fell out of the ugly tree and hit every branch on the way down.
I agree. Surely, the flat area low down would cause a derailment if it hit something like a log? The front of IET’s (Class 800’s) looks built to deflect obstructions.
The flat-fronted 150s, Pacers and first generation DMUs have been happily travelling up and down the Valleys for over six decades. The pointed noses on high-speed trains are probably more to do with aerodynamics which are more more significant at 125mph than 55mph.There's probably nothing much behind that panel other than the auto coupler.
I agree. Surely, the flat area low down would cause a derailment if it hit something like a log? The front of IET’s (Class 800’s) looks built to deflect obstructions.
The flat-fronted 150s, Pacers and first generation DMUs have been happily travelling up and down the Valleys for over six decades. The pointed noses on high-speed trains are probably more to do with aerodynamics which are more more significant at 125mph than 55mph.
The 399s in South Yorkshire seemed to have done alright so farThe point wasn’t about the flat front though, it was about the front fenders being so low.
There certainly isnt much emphasis put into looks these days.If they got bashed it would probably improve the looks. Those things are hideous - they fell out of the ugly tree and hit every branch on the way down.
The 399s in South Yorkshire seemed to have done alright so far
There will be guards on all services. No DOO at TfW. How involved they'll be in dispatch is still up for agreement.My apologies as I’m sure this has probably been covered at length already, but how are these to be worked - I presume some form of DOO/DCO?
That surprises me. Seems like a waste of money to have guards on tram trains.There will be guards on all services. No DOO at TfW. How involved they'll be in dispatch is still up for agreement.
That surprises me. Seems like a waste of money to have guards on tram trains.
Actually yes, what am I saying? These trams will go through the Valleys for goodness sake. Realising that has changed my mind immediatelyPop up to Blackpool or Sheffield and ask the locals what they think of their "clippies", perhaps? The tramways without a staff presence seem to be the ones with serious antisocial behaviour issues.
I can't see them doing the doors, that said, but perhaps a Merseyrail like "dual dispatch" setup might happen? Stadler already have the technology developed for Merseyrail, which involves a guard (or whatever you call them) tapping a proximity card to confirm "ready to close up and go". It's kind of like a variation on Southern OBS but with more safety training.
It's not set in stone yet, but I believe the proposals are for something fairly similar to the Merseyrail agreement alright.I can't see them doing the doors, that said, but perhaps a Merseyrail like "dual dispatch" setup might happen? Stadler already have the technology developed for Merseyrail, which involves a guard (or whatever you call them) tapping a proximity card to confirm "ready to close up and go". It's kind of like a variation on Southern OBS but with more safety training.
Again! Trains ordered and specced without agreement on how they will be operated. Will there be a farce of the build being late and then still no services run as the unions refuse the method of working?There will be guards on all services. No DOO at TfW. How involved they'll be in dispatch is still up for agreement.
Think tfw already got a agreement with the unionsAgain! Trains ordered and specced without agreement on how they will be operated. Will there be a farce of the build being late and then still no services run as the unions refuse the method of working?
Remember we have a left-wing Labour Government which announced in the earliest stages of the project that there would continue to be guards.I suppose the nuclear option would have been to have declared that the Valleys has become an LRT system or whatever and done away with the whole traditional traincrew set up, and staffed them with tram drivers. I’m pleased and surprised in equal measure that they didn’t!
RMT have already agreed the proposed method of working, they've been involved since early on in the project. The changes for ASLEF are party of a much bigger set of changes to the contract but I believe that part is also already agreed in principle. In any case, I believe the units are capable of being worked in the conventional manner anyway (as the 231s already are on the Rhymney line) it's just hoped that the new method of work will decrease dwell time at stations.Again! Trains ordered and specced without agreement on how they will be operated. Will there be a farce of the build being late and then still no services run as the unions refuse the method of working?