• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

CAF class 197 Civity for TfW: News and updates on introduction.

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
Just seen the 'Happy Valley' 197 pass through Briton Ferry.

Any news on when we can expect the next new diagrams for the Class 197s? I see they are back on Liverpool and Conwy Valley now which was probably the next step but we were told April for more and we are already a third of the way through April so it cant be much longer before we hear news?
It was rumoured Crewe Chester would have one from today, however it hasn't yet happened.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Topological

Established Member
Joined
20 Feb 2023
Messages
4,319
Location
Swansea
How far are TfW from being able to split Holyhead to Cardiff diagrams into two parts and use 197s for Holyhead-Chester?

That may be a means to get some other lines their services back.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,197
How far are TfW from being able to split Holyhead to Cardiff diagrams into two parts and use 197s for Holyhead-Chester?

That may be a means to get some other lines their services back.
They're cleared all the way on that route so crew permitting there's no need to split.
Crewe-Manchester or via Styal isn't yet signed off for passenger service, it should have been a couple of weeks back when the signal.issues were ongoing and hasn't yet happened. Once that's all done its planned for certain Cardiff-Manchester/Holyhead runs to start at the timetable change.
 

Bob Price

Established Member
Joined
8 Aug 2019
Messages
1,243
A 197 is on 1D43 sitting at Crewe right now heading to Llandudno at 10:05. Just passed the cameras and it is 018.
 
Last edited:

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,835
Location
Nowhere Heath
Fantastic news that, bring them on down here! How many more 197s would be required to end the use of 153s on the Chester shuttles?
 

Techniquest

Veteran Member
Joined
19 Jun 2005
Messages
21,835
Location
Nowhere Heath
The Chester - Crewe shuttle is worked by 1 unit up and down for most of the day, so 1x197.

Thanks, as soon as I posted I figured it would surely be likely to be just the one train. Looks like it won't be long until I get myself up north for a Cheshire Day Ranger!
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Don't get too excited, the 197 was just on a diagram that visits Crewe in the morning. The regular Crewe - Chester shuttle is a 175 today.
 

Jez

Established Member
Joined
22 Jan 2011
Messages
2,333
Location
Neath
Was the reason a 175 was allocated because it needed to stay close to Chester Depot? Cant think why else a 175 would be used on such a short route when we have to suffer 150s and 153s on much longer distance routes!

== Doublepost prevention - post automatically merged: ==

EDIT should say im referring to the the Crewe to Chester shuttle.
 
Last edited:

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,934
Location
Mold, Clwyd
I noticed from RTT that 197 012 was working the early Wrexham-Chester-Liverpool today.
Has this Wrexham-Chester been going on for a while?
 

Jez

Established Member
Joined
22 Jan 2011
Messages
2,333
Location
Neath
Looking at the timetable changes in May, it looks like the current weekday journey between Holyhead-Llanelli and Llanelli to Chester is no longer worked as a through train from Holyhead to Llanelli, it starts at Cardiff Central and still goes to Llanelli. So there will be 2 diagrams for Swanline (much like before Covid but without interworking with HOWL) and with them both ending in Chester in the evening it would make sense if they were either 197s or 175s (or diagram of each perhaps) otherwise there isnt much point in ending 153s or 150s in Chester given most routes up there should be 197s by then, aside from the 158s that interwork with the Cambrian.

Im really hoping for 197s (or at least 1 197 diagram) if enough train crew at Cardiff can be trained in time. If not will just be happy to see a proper Swanline stopper returning.

What im thinking could happen is if some Holyhead to Cardiff are switched to 197s in May, some will end in Cardiff at night and do Swanline before returning to Chester at the end of the next day. This is just me speculating, no inside knowledge.
 
Last edited:

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,197
Correct. It's good to see them out on that route now.
Believe one was on it yesterday too. It should now happen (crew knowledge permitting) more and more frequently on the shuttle now they're cleared. Helps keep a lot of depots 197 competent on that route.
 

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
Believe one was on it yesterday too. It should now happen (crew knowledge permitting) more and more frequently on the shuttle now they're cleared. Helps keep a lot of depots 197 competent on that route.
Yesterday was the first full day of it, although I heard they could have started as early as last Monday crew permitting. Hopefully we'll see them slowly expand to the Manchester services now.
 

317 forever

Established Member
Joined
21 Aug 2010
Messages
3,286
Location
North West
197s full fleet may timetable change hopefully,as due to 175 issue's and space at Chester was told that Donnington is the holding location until sufficient space allows more units to be at Chester,1st 3 car set should be out soon for mileage accumulation
I could have a short break in North Wales in September if all the Manchester - Llandudno trains are 197s by then.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,197
Yesterday was the first full day of it, although I heard they could have started as early as last Monday crew permitting. Hopefully we'll see them slowly expand to the Manchester services now.
Unlikely as I understand it. Manchester isn't cleared for passenger runs yet. I believe the latest plan for Manchester-West Wales will be a more en-masse change after the summer.
 

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
Unlikely as I understand it. Manchester isn't cleared for passenger runs yet. I believe the latest plan for Manchester-West Wales will be a more en-masse change after the summer.
Sounds like a plan! Cardiff - Holyhead and the like services sooner I'd imagine then.

== Doublepost prevention - post automatically merged: ==

Oh thanks. The roll-out of 197s has been quicker than I'd noticed.

I may even have a daytrip to the area in July now.
Since the beginning of 175s being mass out of service, they've managed to cover them all most of the time with 197s and sometimes the odd sprinter, but that is rare now.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,197
Sounds like a plan! Cardiff - Holyhead and the like services sooner I'd imagine then.

== Doublepost prevention - post automatically merged: ==
A few in the timetable change as well as a couple of Cardiff-Chester via Crewes
 

Top