If there were a sincere, valid objection to 3rd rail then there would be a program, even if slow, of replacement, rather than a bottom-covering objection to small extensions and a mis-application of electrical safety rules (which previously exempted railways).
However I agree with a PW charge-hand friend (and his wife) that DC is less than desirable and suggest that, even if there is completion of the DC network (North Downs, Uckfield, etc), a start is made on replacement.
The two top projects for me would be AC from Pirbright Junction to Weymouth, as this is a fast route that also carries freight and is demanding of a DC system. My second would be Merseyrail's tiny 76 route miles. This tends to isolate suburban Liverpool/Merseyside at present, a state of affairs inimical to a trading region. The tunnel problem would be solved either by the new battery stock or by use of the ROCS system, which might just fit in the 4.7m dia tunnels.
Some chance!
WAO