Snow1964
Established Member
Government has issued Prior Information notice for Chiltern also covering East West Rail
As it covers number of services which seem to overlap with Chiltern, South Birmingham suburban, and some GWR and XC services, so putting them in separate thread for discussion
As it covers number of services which seem to overlap with Chiltern, South Birmingham suburban, and some GWR and XC services, so putting them in separate thread for discussion
II.1.1 Title
Contract for Chiltern Rail Services. Currently Operated by the Chiltern Railway Company Limited.
II.2.4 Description of the procurement
Contract for provision of commuter and regional rail services on the UK conventional mainline rail system. It is envisaged the services would run between:
(a) London to Kidderminster via Birmingham Moor Street
(b) London to Banbury
(c) London to Oxford via High Wycombe
(d) London and/or Leamington Spa to Stratford-upon-Avon
(e) Leamington Spa to Birmingham Moor Street
(f) London to Aylesbury via both Amersham and High Wycombe
(g) Oxford to Milton Keynes via Bletchley, as the first of 3 connection stages (CS1) of the East West Rail project (EWR)
This is a mixture of leisure, business and commuter travel.
The East West Rail (EWR) Project is set to introduce new rail services between Oxford and Cambridge in 3 distinct phases referred to as connection stages 1 to 3 (CS1 to CS3).
CS1 aims to introduce passenger services between Oxford and Milton Keynes between December 2024 and September 2025.
Last edited: