D365
Veteran Member
- Joined
- 29 Jun 2012
- Messages
- 13,201
It’s hard to speculate without knowing the technical specifications of the vehicles 
Nope, the plan there appears to be a withdrawl of LHCS full stop due to pollution controls wanted by Westminster Council
Alot of comments dismissing Chiltern wanting them. Yet you can now see the recently installed bio diesel fueling equipment at Stourbridge, Installed just for 68s, to satisfy said council and allow continued operation of lhcs. Therfore I imagine Chiltern would gladly take them to replace the ageing mk3s if they had the option. Esp as crews already sign lhcs and 68s.Nope, the plan there appears to be a withdrawl of LHCS full stop due to pollution controls wanted by Westminster Council.
Unfortunately biodiesel has got nothing at all to do with pollution control...Alot of comments dismissing Chiltern wanting them. Yet you can now see the recently installed bio diesel fueling equipment at Stourbridge, Installed just for 68s, to satisfy said council and allow continued operation of lhcs. Therfore I imagine Chiltern would gladly take them to replace the ageing mk3s if they had the option. Esp as crews already sign lhcs and 68s.
I am not sure what lessons that might have been learnt from the unnecessary Nightstar Rolling Stock could be applied to the TPE post Covid situation.But as a country we should have learned by the mistakes of ordering the Nightstar Rolling Stock to not be making such mistakes again.
.....................
I always thought five coaches was a bit short. But does seven coaches fit at the stations served ?. Will seven coaches still be within the 68s capabilities ? - I imagine so which therefore prompts the question do the running costs of the 68 make more sense if the attached train it bigger ?.As a driver of both sets of traction we have been told that the plan is most likely that all 185 traction will be retained and a fair bit of time and money is being spent on 68/Mk5's to finally address the numerous issues they have with a view to seeing the fleet reduced to six or seven rakes with 7 coaches on each. Training courses are starting as we speak for various depots so I don't see the 68/Mk5 going anywhere soon.
I think that, because of things like power operated doors and central locking, there is nowadays too much "intelligence" required down the length of the train to just get away with dumb stand alone coaches. Call it "progress" !.Now that could be quite useful, though I bet TPE are wishing they'd bought truly independent LHCS instead of unpowered single-ended multiple units to make that a bit easier!![]()
Are they?, they split up into 3(?) units at Edinburgh, and AFAIK there is no DVT, I get the feeling the TPE Mk5s are far less flexible than the CS ones.
That is correct the seated coach is the "brain" - I think a guards compartment also. Thus an extra "brain" coach has to be added-to the Fort William portion at Edinburgh on the Northbound and gets removed on the South bound. The rest of the Fort William portion gets added to the Aberdeen portions "brain" making up 8 or less coaches.I may be wrong here, but I think the seated coach is the 'brain', and all consist must therefore include at least one of those
No need to convert any first class coaches to second. Each 5-car set has three standard class intermediate non-driving coaches, so to form six 7-car sets six of the remaining seven sets would simply donate two of these each.There are going to be quite a fer driving-trailer coaches spare and I assume some first cless coaches will need altering to second class. Converting to six or seven x 7car sets means 24 or 17 coaches respectively spare overall. That would leave enough for 2 or 1 extra set.

Unfortunately biodiesel has got nothing at all to do with pollution control...
All Diesels create NOx in the cylinders, which might - or might not - be taken out by catalytic converters. Ever noticed a sharp smell when you are behind or overtaken by a diesel car? or in Standedge tunnel? It sets my asthma off.
Biodiesel just pretends to be green as it is made from crops grown with sunlight - and fossil-fuel powered tractors, and energy-intensive nitrate fertlisers.
No need to convert any first class coaches to second. Each 5-car set has three standard class non-driving coaches, so to form six 7-car sets six of the remaining seven sets would simply donate two of these each.
Forming seven sets would be a bit more awkward, because one of the non-driving standard class coaches has the PRM toilet. With only six donor sets, at least one of the resultant 7-car sets would have to have two PRM toilets, and at least one would have to have only one PRM toilet but more seats (unless one coach was reconfigured to enable a standardised formation).
Not sure what the bike space and small toilet situation is, but from a passenger perspective there are only three types of coach in a set. The non-cab end coach (First and Wheelchair spaces, with the auto upgrade as mentioned); three standard intermediates; and the driving trailer standard. You're basically suggesting they should have done exactly what they did in fact do. It wouldn't be possible to have fewer than three types of vehicle, because you've to accommodate the driving trailer and the other end car which couples to the loco, then your intermediates.Must admit though that my view was that they should have just built two types of independent coach reformable as desired - driving trailer first with two wheelchair spaces, bike spaces and accessible bog, and a load of standard opens each with a small toilet. Or if that would mean insufficient first class, just three types - driving trailer standard with bike spaces and no bog, standard open with small bog, first open with 2 wheelchair spaces and accessible bog. Wheelchair passengers and companion(s) would receive a free upgrade as they do on some of the 5-car 80x. Would make this all rather easier.
I am a bit lost. So does that mean the three intermediate coaches are all the same in the current 5car sets ?.Not sure what the bike space and small toilet situation is, but from a passenger perspective there are only three types of coach in a set. The non-cab end coach (First and Wheelchair spaces, with the auto upgrade as mentioned); three standard intermediates; and the driving trailer standard. You're basically suggesting they should have done exactly what they did in fact do. It wouldn't be possible to have fewer than three types of vehicle, because you've to accommodate the driving trailer and the other end car which couples to the loco, then your intermediates.
Coach B has the cycle area at one end. Coaches C & D are identical.I am a bit lost. So does that mean the three intermediate coaches are all the same in the current 5car sets ?.
Thanks for that, makes sense. I got warm with information gleaned from a Rail Engineer article hereCoach B has the cycle area at one end. Coaches C & D are identical.
Scroll down the link to see the Nova 3 seating plan.Train Seating Plans | Download Plans | TransPennine Express
Take a look at our seating plans for all our trains. Download seating plans today.www.tpexpress.co.uk
www.railengineer.co.uk
Not sure what the bike space and small toilet situation is, but from a passenger perspective there are only three types of coach in a set. The non-cab end coach (First and Wheelchair spaces, with the auto upgrade as mentioned); three standard intermediates; and the driving trailer standard. You're basically suggesting they should have done exactly what they did in fact do. It wouldn't be possible to have fewer than three types of vehicle, because you've to accommodate the driving trailer and the other end car which couples to the loco, then your intermediates.
An east bound 6 car 185 certainly doesn't fit, back carriage is over the end of the platform, with warnings to 'move forward'. I am not sure what the situation is with a 5 car Mk5 when the engine is at the Scarborough end, but I would imagine the last carriage is out of use.I can't see the Nova3s going to 7 cars as 6 car 185s are a very tight squeeze at Seamer.
It just feels like the cheapest possible solution was found, with no thought given to future use once the original purpose was served/no long existed. If a a proper LHCS solution had been purchased a possible white elephant could have been turned into a really useful flexible solution to allow a response to short term issue/needs, e.g. crowd busters for events, longer services when diversions are in place, whilst still keeping the day to day service going in the standard configuration.As things stand the Mk5s have all of the disadvantages of LHCS and none of the advantages (bearing in mind you can barely hear the engines in an 80x).
A 'proper LHCS solution' of that type hasn't existed on the UK railway since the 1990s. I can't see anyone ever introducing one anywhere in the future.If a a proper LHCS solution had been purchased a possible white elephant could have been turned into a really useful flexible solution to allow a response to short term issue/needs, e.g. crowd busters for events, longer services when diversions are in place, whilst still keeping the day to day service going in the standard configuration.
The intermediates each have one small toilet, but Coach B has a different seating layout to the other two, with a cycle area and 10 fewer seats - see the layouts linked in #161.Do all intermediates have the same seat layout and a small bog each? I don't think they do?
The CS Mk5s have Dellner couplers throughout to facilitate reformation, so I imagine the Mk5a's could be retrofitted with Dellners in place of the bar couplings.But the key is independent coaches, RIC style, so you could form them in any order you liked (including a DTSO in the middle if you felt like). A droppable buckeye could be used to avoid the risk of mid-train screw coupling use. Then they could be reformed ad-hoc, e.g. to run a very long additional for the Grand National.
The CS Mk5s have Dellner couplers throughout to facilitate reformation, so I imagine the Mk5a's could be retrofitted with Dellners in place of the bar couplings.
The intermediates each have one small toilet, but Coach B has a different seating layout to the other two, with a cycle area and 10 fewer seats - see the layouts linked in #161.
If the reliability problems of the mk5 stock can be sorted, then it would make sense to order more of the 68/mk5 sets to replace 185s on the remaining all-diesel routes, as this would be cheaper than more 802s. The noise 'issue' of the 68s sounds like a case of looking for an excuse to criticize LHCS use; they are good reliable locos, less polluting than DMUs older than 10 years.
A few years ago it was announced that TPE would send 22 185s off lease once the mk5 and 802 (Nova 2 and 3) arrived but they reduced it to 15 off lease 185s then none at all. As a result TPE has a surplus of stock, hence there are more 185s than there is work for so there has been plenty of speculation about where the remainder would go. Then it gets repeatedly said they are not fit for any routes other than the TP because of their weight and running costs, that they won't be taken by any other ToCs.Do the 185s need replacing though? they could just keep them...
I agree that currently TPE has more stock than it needs. However, the post I was replying to suggested buying more Mk5As, to replace the 185s, for which I don't see the logic (at all)A few years ago it was announced that TPE would send 22 185s off lease once the mk5 and 802 (Nova 2 and 3) arrived but they reduced it to 15 off lease 185s then none at all. As a result TPE has a surplus of stock, hence there are more 185s than there is work for so there has been plenty of speculation about where the remainder would go. Then it gets repeatedly said they are not fit for any routes other than the TP because of their weight and running costs, that they won't be taken by any other ToCs.
TPE are in a shambles now and don't have enough crew with enough route knowledge to run them without doing a one way trip then returning ECS and leaving passengers in a huff. Any argument about TPE keeping 185s means they continue to sit idle or on the island track at Sheffield or somewhere where they are not ferrying passengers about, so they are being wasted where they are now. TPE have more than enough stock, but until the DfT/Treasury is in a better position and demanding service upgrades the 185s aren't going anywhere due to the costs of faciliating a move elsewhere.
though the required ratio (one seated coach with up to 7 other coaches) is hardly very onerous, so if it is possible to change the Mk 5As to operate like the sleeper stock that would give (a lot) more flexibility.Though even the CS coaches aren't independent RIC style coaches, they require the right ratio of seated coach to sleepers as the seated coach contains some technical gubbins required to make the others work.
Yep.So 4 types then?
though the required ratio (one seated coach with up to 7 other coaches) is hardly very onerous, so if it is possible to change the Mk 5As to operate like the sleeper stock that would give (a lot) more flexibility.
It just feels like the cheapest possible solution was found, with no thought given to future use once the original purpose was served/no long existed. If a a proper LHCS solution had been purchased a possible white elephant could have been turned into a really useful flexible solution to allow a response to short term issue/needs, e.g. crowd busters for events, longer services when diversions are in place, whilst still keeping the day to day service going in the standard configuration.
What TPE really wanted was more 802s. The Mk 5s were never meant to be anything more than a quick and cheap work-around for Hitachi not being able to deliver more 802s in the timeframe desired, with "bi-mode" changed to "we can put a 'leccy loco on the front when the wires go up".I'd order 802s. A single standard fleet would be most useful for TPE and they can use the wires where (increasingly) present.
They don't sound that inflexible from a ROSCO perspective though - most of the differences are in the internal fit out, which if a new customer needed something particularly different could probably be accomplished without too much cost or difficulty. What they aren't though, is flexible on a day-to-day, trip-to-trip basis. A close comparison could be the 222's - where none of the 9-car examples exist any more. To their ROSCO, it's a flexible train - they've been able to reform the fleet to 5 & 7 cars without too much difficulty to meet the needs of their client - but to EMR it's a fixed formation that can't be altered without major works.I'm struggling to believe the formations could be as inflexible as portrayed - that would be a pretty big risk for the ROSCO on a relatively short lease.
Especially since they only really work for TPE. If they get replaced, they are getting scrapped, no where else will take them unless they have serious modification.Do the 185s need replacing though? they could just keep them...
If there is space, couldn't the spare class 185 units be used to obtain parts? Admittedly, it still would be scrapping them, but at least if needed parts would be available to maintain the rest of the fleet.Especially since they only really work for TPE. If they get replaced, they are getting scrapped, no where else will take them unless they have serious modification.
An interesting theoretical, but nothing more. In the real world, they go for scrap, and no amount of foruming will change that, so the question is do people mind if they get scrapped or not?
How do you know this?If the reliability problems of the mk5 stock can be sorted, then it would make sense to order more of the 68/mk5 sets to replace 185s on the remaining all-diesel routes, as this would be cheaper than more 802s.
Don't think you need to be concerned about parts, there are plenty of engineers and maintainers who know what they're doingIf there is space, couldn't the spare class 185 units be used to obtain parts? Admittedly, it still would be scrapping them, but at least if needed parts would be available to maintain the rest of the fleet.
