norbitonflyer
Established Member
I use the level crossing at North Sheen maybe twice a month. In the last six months I have seen two emergency vehicles have to wait at the crossing (and a third just get through before the amber light came on)That happens anyway, at locations with far longer 'barrier down' times due to frequency of service or approach speed of trains. The number of occasions where a train occupying the road crossing would coincide with the arrival (and delay to) a 'blues and twos' response can probably be counted using the hairs on Kojaks head.
== Doublepost prevention - post automatically merged: ==
On the principle that half a loaf is better than no bread, would it not be possible to use longer stock and skip stop those stations where there is a problem? It may even be possible to provide a service in one direction only at some of them, with passengers "circulating" where necessaryVery few platforms are a problem. Somewhere on the Forum I listed having researched it in the Sectional Appendix. Woburn Sands definitely is not.