Quite! Sometimes seems that if it doesn't, it won't ever happen.Will any of these benefit London?
They don’t usually decide to reopen any route on its possible diversionary use. It has to stand on its own.The Waverley Line should be reopened. It will benefit the Towns and Vlliages along the route and allow for new connections. Also can function as a diversion route when needed.
There are plans / aspirations / professional crayons to reopen part of the route to passengers as it is/was being used for freight as far as the glass works (roughly where Monk Bretton Station was). Cudworth would be the larger market though, but running htrough to Wath and Swinton would be difficult; the idea is to run through to Barnsley somehow (you'd have to make a new connection at Stairfoot to reach Interchange, I think); and the northern end would be better connected via the former round to Sandal and Agbrigg, then on to Westgate and Leeds rather than Normanton.Sheffield via the original Midland route to Leeds?
The Waverley Line should be reopened. It will benefit the Towns and Vlliages along the route and allow for new connections. Also can function as a diversion route when needed.
Newcastleton...Which towns would those be?
If a new railway between two cities is ever going to run with income exceeding operating costs, then there needs to be enough traffic between those places already to fill a six-lane motorway. And you really need a four-track railway so that fast trains don't get held up by any stoppers.If any one of these three lost Beeching-era main lines were to be restored, in full, which would have the best chance of achieving even a modicum of commercial success?
I agree, but that didn't really answer my question.Quite! Sometimes seems that if it doesn't, it won't ever happen.
In hindsight bits of the GCML would have been somewhat useful, for example I still maintain that Nottingham Victoria is a far superior location for a railway station than the existing Nottingham (Midland) station.
So, you close Trent to Derby Midland and close Derby Midland itself, and serve Derby with the GN route into Friagate? I'm not sure how suitable for high-speed that was, but we'll give it a go.Using that station rather than the Midland one would have required retention of some portion of the GCML associated system, and required a handful of chords to be added, other bits of the MML system would have closed in exchange.
Probably would have today's Midland Main Line run through Notitngham instead of Derby, which is probably reduced to using the Friargate station.
I'd probably like to see them use the old Okehampton to Bere Alston alignment to Tavistock but then switch to the other side of the valley for the old Tavistock South to Plym Bridge and add a Westbound chord.Okehampton-Bere Alston. The pros and cons of this have been done to death on the forum over the years. I’m very much in favour although I expect most of it will probably be single.
As for restoring a mainline then Wilton to Pinhoe re-doubling throughout.
None of them. Extending from Galashiels to St Boswells and Hawick might just be worthwhile.
The Waverley Line should be reopened. It will benefit the Towns and Vlliages along the route and allow for new connections. Also can function as a diversion route when needed.
I thought the cables were moved in the last 10 years into the newer bore? Woodhead isn't going to reopen anytime soon.Woodhead has a lot going for it - line largely still in tact, some of it still in use, and would provide a faster journey between Manchester and Sheffield, along with increased capacity and the easing congestion on the Hope Valley route.
The tunnel itself looks to be in good condition and could take trains - the electric cables don't go through the large modern bore, but rather one of the original bores.
I thought the cables were moved in the last 10 years into the newer bore? Woodhead isn't going to reopen anytime soon.
1. The Cables are now in the double track bore, 2. There's very little room for additional trains into Manchester from Guide Bridge. 3. The route into Sheffield was hardly a 'main line', 4. You either have to reopen Stocksbridge-Pensitone and refurb the line into Victoria or squeeze the life out of the Barnsley route for a path into Midland. For a fraction of the cost you could do a hell of a lot of improvement to the Hope Valley and southern Sheffield approach.I had a look at the western end about 20 years ago so this would have been before wires were moved from the older tunnel.
It's unlikely that any of the above are going to happen soon, but the theme is about the most sensible reopening, I'd say Woodhead is up there. Also as mentioned above it would provide a better service and new connections (either direct or with a change) for places like Penistone, Stocksbridge and Barnsley.

Stratford to Honeybourne didnt even make the restoring your railway cutSince 'other' is an option in the poll, that surely has to be the vote of choice, since that covers any of dozens of lines that probably stand more chance of commercial success than the specific ones listed in the poll
Off the top of my head, lines closed in the Beeching cuts that do not currently have any re-opening plans and which may stand some chance of commercial success if re-opened could include:
Of the ones listed in the poll, I'd have thought the Great Central London extension stands the most chance of success because it does link several significantly sized towns (Aylesbury - Rugby - Leicester, and also would provide Milton Keynes - Rugby - Leicester - Nottingham connections).
- Hadfield - Stocksbridge - Sheffield Victoria (if extended to provide a tram /rail connection at Nunnery Square)
- York - Hull
- Stratford-on-Avon - Broadway - Cheltenham
(In all this, I'm thinking about the chances of the routes once opened - I'm ignoring the difficulties and cost of reopening them in the first place).