no, they were designed as non-tilting
I guess it would have been too difficult to build inside a tapered tilting body profile
It seems strange that a consist of mixed tilting ability would be suitable for higher speeds.
The primary reasons for APT-P having tilting power cars were related to controlling track forces at high speeds, which is obviously very sensible, but the fact that Class 91s 1) wouldn't run as fast as APT-P, and 2) wouldn't encounter such large cant deficiencies as APT-P, made it less necessary.
The secondary reason is for reduction of aerodynamic drag, but again this is effect is lessened at lower speeds and by the fact that mismatch in profiles between an un-tilted 91 and a tilted Mk 4 rake was nowhere near as large as with APT-P.
The APT-P power cars did tilt: There's a diagram out there somewhere that I can't find right now that shows the mechanism used to keep the pan head level, mechanically linked to the bogies.
I'm sure I have somewhere a diagram illustrating that mechanism alone, but this one is nearly as good:

You can see the orange-coloured linkages between the bogies and the pantograph base, and the struts to fixed points inside the vehicle body.
The existing mark 4s weren't intended to be retrofitted with tilt (as I once believed - like some others on this thread I'm unaware of any ECML to WCML cascade plan as mentioned on page 1 of this thread), any tilting mark 4s would have been new build. In either case, the class 91s would not have been tilt fitted.
I don't have my old magazines to hand but IIRC space was allocated within the body for the addition of tilting equipment, rams and such like, in the event of retro-fitting or to be used if a follow-on build were to be 'tiltable' (if that's a word?!). Don't forget that the transformer was under the floor so quite a lot of space was available.
I'm not sure I've ever seen a definitive answer to this, to tell you the truth. I certainly can't recall anything suggesting a solid plan to retrofit either the coaches or locos, though - everything I can remember reading points to passive provision in the design at the most, in expectation of an order for tilt-enabled Mk 4s for the WCML at some point in the '90s. I have a bunch of technical papers from the Class 91 development stashed away that I've been meaning to look over again so I'll come back with any updates if I find them (but don't hold your breath!)
I wonder if it was just that tilting/140mph/narrow coach bodies in the theoretical calculations gave an advantage over what they had at that moment, 125mph, and this was part of the justification. Knowing it was beyond physics for multiple parts of the equation (bogies, signalling, etc) would be lost on the paymasters in Whitehall, but a rebuttal was needed to "125mph electrification is no faster than what you have got at the moment so why spend the money?". So hey ho, the passengers will have to sit all squashed up for the next generation, but we will have got our electrification.
I'm not sure of the point you're trying to convey here, other than complaining yet again about being "squashed".
If what you're seriously trying to suggest is that one 140mph push pull design didn't take any influence from the only two other 140mph push pull designs then you clearly lack understanding of how product design is done. All good manufacturers in all industries look at what's been done before, look at what comparable products got right and got wrong and design accordingly. So granted they may not have specifically designed the Railjets to resemble the 225s, I wasn't trying to suggest otherwise, but to suggest that Siemens didn't as much as study the 225s (and the X2000s for that matter) when working on the Railjets and take some inspiration from them is mad.
Mate, in the nicest possible way, you really are over-reaching with this. There's nothing special at all about push-pull configurations; after all, in overall theory, there's zero revolutionar change in IC225's configuration compared to a 47 with some Mk 2s and a DBSO at one end. Everything after that has simply been "change traction source and add speed". Even the 91s themselves were pretty traditional - yes, the body-hung traction motors were unusual, but the traction electronics were old hat compared to what ABB, AEG, and Siemens were doing with the ICE 1 power cars at the same time.
The only direct claim of genuine IC225 influence that I know of is that SIG further developed the BT41 bogie from the Mk 4s into a higher-speed version called the SIG 300 that DB were going to trial for use as the primary ICE trailer bogie in the mid-'90s, but even then I don't know what actually came of it.