My proposal to split up the CrossCountry Network

Status
Not open for further replies.

Manutd1999

Member
Joined
21 Feb 2021
Messages
549
Location
UK
If that is too ambitious, you could try to find 2-3 minutes so that the SW service arrives at ~xx56. This would allow it to depart to either Manchester (xx01) or Edinburgh (xx03), alternating with the south-coast service. This wouldn't be enough to meet the minimum connection at New Street, but would allow the destinations to swap each hour, giving a 1p2h direct service to each branch.
Why would you want to swap the destinations over though?

My suggestion was a potential way of reducing the XC operation whilst still keeping the same connections, albeit 1p2h instead of 1ph for some flows.

That in turn allows other parts of the network to be re-assessed and/or moved to other operators For example, the 2nd hourly Birmingham-Manchester could be moved to a high-capacity EMU
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
That 26 will catch up with the 22 at Water Orton as it turns off then have the 30 right behind it unless the 26 runs fast.
Have the 26 run fast but that then causes problems for the 18 as it'll cause problems for it so path it at 09 using up the peak Leicester path. Have the 30 as a semifast and same with the 49. I know it creates a 40/20 frequency but it's the only way that 5tph could be accommodated. You'll have fasts at 03 (Tamworth only) and 26 (Burton only) with semifasts at 30 and 49 with a slow at 09
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,682
Have the 26 run fast but that then causes problems for the 18 as it'll cause problems for it so path it at 09 using up the peak Leicester path. Have the 30 as a semifast and same with the 49. I know it creates a 40/20 frequency but it's the only way that 5tph could be accommodated. You'll have fasts at 03 (Tamworth only) and 26 (Burton only) with semifasts at 30 and 49 with a slow at 09
That still does not solve finding slots at Kingsbury for trains in and out of Birch Coppice and for trains you inevitably have to hide via Whitacre though to get up to Burton. Burton would have a very lop sided service as well by the looks of it.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
but it's the only way that 5tph could be accommodated
That provision is overkill from Birmingham to Derby, but 5 tph will need to be accommodated as far as Water Orton. IMO, all that is needed on the Birmingham-Derby line is:
  • 1 tph non-stop, originating in SW England (Plymouth/beyond) running fast via Doncaster to Edinburgh
  • 1 tph semi-fast, originating in Bournemouth, calling at Tamworth and Burton, and proceeding to Leeds to terminate there
  • 1 tph stopping at all extant stations between Birmingham and Derby (bar Pear Tree), originating in Cardiff, and terminating at Nottingham
That would be the sum total of the XC services. Liverpool and Manchester would have emu connections at New Street, run by the LMR franchise.

EMR would run 2 tph from Birmingham to Leicester/beyond, with the service that doesn't run to East Anglia calling at Water Orton.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
There appear to be many proposals to terminate services at Leeds. Can I ask you all where you are magicking this newly found capacity at Leeds up from please? The services would not be able to turn around to accommodate the current paths so you are either decimating capacity by clogging up a platform for 1hr3min each hour or you are putting in capacity decimating shunt moves twice per train.

You are also crucially losing an hourly direct service between West Yorkshire and Scotland. What is your solution to all this without fantasies of magic extra platforms or sidings that ain’t happening.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
There appear to be many proposals to terminate services at Leeds. Can I ask you all where you are magicking this newly found capacity at Leeds up from please? The services would not be able to turn around to accommodate the current paths so you are either decimating capacity by clogging up a platform for 1hr3min each hour or you are putting in capacity decimating shunt moves twice per train.

You are also crucially losing an hourly direct service between West Yorkshire and Scotland. What is your solution to all this without fantasies of magic extra platforms or sidings that ain’t happening.
I accept that the timetable would need to be rejigged - existing paths may not be appropriate. The XC train could terminate in one of the northern bay platforms that are accessible from the ex-GN route, providing a 30 minute turn-around time is considered adequate. Local Leeds-Bradford services via Shipley could be withdrawn to free up platform capacity if required. If using the through platforms or there is a need for a longer overlay, the train could go to Neville Hill Depot. There are plenty of other trains from Leeds to York for good connections there, plus 1 tph from Leeds to Newcastle. It is better to route the 1 tph fast train from Birmingham to NE England via Doncaster or Pontefract to save 20-25 minutes journey time for what is already a lengthy journey. There would still be 1 tph from Birmingham to Leeds and 2 tph from Birmingham to the West Riding.
 
Last edited:

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
I accept that the timetable would need to be rejigged - existing paths may not be appropriate. The XC train could terminate in one of the northern bay platforms that are accessible from the ex-GN route, providing a 30 minute turn-around time is considered adequate.
So you’re looking at a complete re-write of the timetable which as it includes Cross Country probably involves the whole network. I’m wondering where this capacity is in the bays too. Are we knocking local services out?
If using the through platforms or there is a need for a longer overlay, the train could go to Neville Hill Depot.
So might as well continue through to Edinburgh as you’re destroying east Leeds capacity with the associated hourly cross over moves more than simply running a through train ever would.
There are plenty of other trains from Leeds to York for good connections there, plus 1 tph from Leeds to Newcastle. It is better to route the 1 tph fast train from Birmingham to NE England via Doncaster or Pontefract to save 20-25 minutes journey time for what is already a lengthy journey. There would still be 1 tph from Birmingham to Leeds.
Ah yes, the fabled pain people suffer from a slightly extended journey time via West Yorkshire to connect over 1 million people with a direct train to Scotland. The only people I ever hear complain about this slightly extended journey time via Leeds is people on this forum. The general public who use Cross Country simply catch a train that suits their arrival time and couldn’t give a toss about a slightly extended journey via Leeds. It’s time people got real instead of making up problems that simply don’t exist to all except a few enthusiasts.
 

RobShipway

Established Member
Joined
20 Sep 2009
Messages
3,337
So you’re looking at a complete re-write of the timetable which as it includes Cross Country probably involves the whole network. I’m wondering where this capacity is in the bays too. Are we knocking local services out?

So might as well continue through to Edinburgh as you’re destroying east Leeds capacity with the associated hourly cross over moves more than simply running a through train ever would.

Ah yes, the fabled pain people suffer from a slightly extended journey time via West Yorkshire to connect over 1 million people with a direct train to Scotland. The only people I ever hear complain about this slightly extended journey time via Leeds is people on this forum. The general public who use Cross Country simply catch a train that suits their arrival time and couldn’t give a toss about a slightly extended journey via Leeds. It’s time people got real instead of making up problems that simply don’t exist to all except a few enthusiasts.
I would add that the general public also look at what suits their departure time too. I don't believe that the general public are looking at the fact that if they change from their XC train at Leeds that they would be able to get a faster service to York, than staying on the XC service. All the general public care about is getting from A to B with ease, not in the time that it takes them.
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
549
Location
UK
all that is needed on the Birmingham-Derby line is:
  • 1 tph non-stop, originating in SW England (Plymouth/beyond) running fast via Doncaster to Edinburgh
  • 1 tph semi-fast, originating in Bournemouth, calling at Tamworth and Burton, and proceeding to Leeds to terminate there
  • 1 tph stopping at all extant stations between Birmingham and Derby (bar Pear Tree), originating in Cardiff, and terminating at Nottingham

2ph is a very poor level of service for a town the size of Burton. I would say 4ph between Birmingham and Derby is a reasonable compromise:

1ph non-stop to Derby, continuing to Doncaster and Newcastle
1ph semi-fast to Leeds and onwards, calling Tamworth and Burton
1ph semi-fast to Nottingham (from Cardiff), calling Tamworth and Burton
1ph stopper to Nottingham (starting at New Street), calling Wilnecote, Tamworth, Burton, Willington


There appear to be many proposals to terminate services at Leeds. Can I ask you all where you are magicking this newly found capacity at Leeds up from please? The services would not be able to turn around to accommodate the current paths so you are either decimating capacity by clogging up a platform for 1hr3min each hour or you are putting in capacity decimating shunt moves twice per train.

Terminating at York may be more realistic, allowing the current paths to stay untouched with a turnaround of 15-20 minutes at York. TPE (assuming they get their act together....) would provide a service from Leeds to Edinburgh.

There are real (non enthusiast) advantages to this:

- Separating the Birmingham-Leeds, Birmingham-Newcastle and Leeds-Newcastle/Edinburgh passenger flows
- Saving some diagrams for XC
- Less diesel running on the ECML and 1ph less overall north of York
 
Last edited:

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
Terminating at York may be more realistic, allowing the current paths to stay untouched with a turnaround of 15-20 minutes at York. TPE (assuming they get their act together....) would provide a service from Leeds to Edinburgh.

There are real (non enthusiast) advantages to this:

- Separating the Birmingham-Leeds, Birmingham-Newcastle and Leeds-Newcastle/Edinburgh passenger flows
- Saving some diagrams for XC
- Less diesel running on the ECML and 1ph less overall north of York
Which is a far better solution than the previous response which effectively translated as ‘stuff Leeds and West Yorkshire’. Not sure if it would be do-able turning a voyager at York, especially when 8 or 9 cars each hour but far more do-able than turning at Leeds, slashing capacity and most likely requiring a cut in some local services, re-writing entire timetables across the country and getting rid of the direct service to/from Scotland.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,682
That provision is overkill from Birmingham to Derby, but 5 tph will need to be accommodated as far as Water Orton. IMO, all that is needed on the Birmingham-Derby line is:
  • 1 tph non-stop, originating in SW England (Plymouth/beyond) running fast via Doncaster to Edinburgh
  • 1 tph semi-fast, originating in Bournemouth, calling at Tamworth and Burton, and proceeding to Leeds to terminate there
  • 1 tph stopping at all extant stations between Birmingham and Derby (bar Pear Tree), originating in Cardiff, and terminating at Nottingham
That would be the sum total of the XC services. Liverpool and Manchester would have emu connections at New Street, run by the LMR franchise.

EMR would run 2 tph from Birmingham to Leicester/beyond, with the service that doesn't run to East Anglia calling at Water Orton.
So Nottingham gets 1tph that is slower than today? unless you are assuming HS2, then that flies in the face of the proposals to try and speed that flow up. Not going to happen.
2ph is a very poor level of service for a town the size of Burton. I would say 4ph between Birmingham and Derby is a reasonable compromise:

1ph non-stop to Derby, continuing to Doncaster and Newcastle
1ph semi-fast to Leeds and onwards, calling Tamworth and Burton
1ph semi-fast to Nottingham (from Cardiff), calling Tamworth and Burton
1ph stopper to Nottingham (starting at New Street), calling Wilnecote, Tamworth, Burton, Willington
Which is pretty much what the service was/is.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
That still does not solve finding slots at Kingsbury for trains in and out of Birch Coppice and for trains you inevitably have to hide via Whitacre though to get up to Burton. Burton would have a very lop sided service as well by the looks of it.
Burton would get 4tph, with a somewhat lopsided service as the 03 would not call but everything else would call at Burton. Regarding freight, there's space to cram a couple trains between the semifasts as the freights are only a couple mins slower and they don't have to run through New Street station.

== Doublepost prevention - post automatically merged: ==

That would've been done in the first place if it was that simple or possible. The 3-cars have weights in the place of the other two engines. We often have 4 spare at Norwich and another at Ipswich. Some are still being used for testing by Stadler & other sub contractors.

== Doublepost prevention - post automatically merged: ==

Don't forget 4 will be used on the main line from May to allow the Stansted Express to ramp up peak frequency and a unit at a time is away for engine replacement at Clacton depot.
If there are 5 spare and a few are being tested by Stadler, if they get returned, that means that Stansted-Birmingham can be run by 755s. The easiest way to deliver cost savings is to increase fleet utilisation. Using 170s may reduce training costs, but if EMR can get 170s from XC, they will need to be used on whatever Norwich-Liverpool becomes. The amount of unelectrified route is also higher on Norwich-Nottingham/Derby than Stansted-Birmingham. Regarding maintenance, if a lot of lighter maintenance and refuelling can be done at Cambridge, that eliminates that problem and there's another 755 each hour running out of Stansted, so while you are losing flexibility at the Birmingham end, you're gaining it at the Cambridge/Stansted end. Getting them off the mainline will be key however to allowing them to reach full utilisation.

GN is more complex as there is a need for third rail capable stock in DC land, either to Southern, who have lost/are about to lose around 70 units and already operate 387s or to replace Networkers that work outer suburban services on SE. I'm getting the point that it will split the 745 fleet and require minor infrastructure changes at KL so directly using 16 of the 20 surplus 720s could be done. Regarding 110/115 mph running, it could unlock extra paths after ETCS is done as the LNER services that stop at Stevenage could be pathed behind KL services without needing additional space due to being 100mph paths. Maybe even concentrating the 745s on GEML only could work but I do see the 745s utility on SX. However all of this is somewhat off topic so I won't go on any longer.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,682
Burton would get 4tph, with a somewhat lopsided service as the 03 would not call but everything else would call at Burton. Regarding freight, there's space to cram a couple trains between the semifasts as the freights are only a couple mins slower and they don't have to run through New Street station.
New St is irrelevant in this. The issue is that anything that is going in and out of Birch Coppice is doing so at a slow pace over Kingsbury Branch Junction at 10mph. A Kingsbury oil train needs around a 20 minute gap and an Intermodal needs a good 12 minutes.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
2ph is a very poor level of service for a town the size of Burton. I would say 4ph between Birmingham and Derby is a reasonable compromise:

Burton on Trent - pop'n 72k.

Wellingborough - pop'n 56k - 2 tph to London, 2 tph to Corby

Northampton - pop'n 250k - 2 tph to London, 2 tph to Birmingham.

I think 2 tph is probably about right for Burton.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
New St is irrelevant in this. The issue is that anything that is going in and out of Birch Coppice is doing so at a slow pace over Kingsbury Branch Junction at 10mph. A Kingsbury oil train needs around a 20 minute gap and an Intermodal needs a good 12 minutes.
There's a gap between the semifasts so an oil train could just about fit. If you stop the later service at Wilnecote, you effectively get a 21 minute gap, which gives enough breathing space to run it effectively.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,126
Location
West Wiltshire
Just to add to the mix, Deutche Bahn has revived its intention to sell Arriva (started in 2019, but went on hold when Covid hit)


Of course the Cross Country franchise expires October 2023, and was discussed in (now locked) Cross Country Prior Info thread

Not totally sure an organisation being put up for sale means it is eligible to be considered for a management contract
 

Ayman Ilham

Member
Joined
2 Jul 2016
Messages
462
Location
Blackburn (Lancs)
Manchester to Reading via Birmingham and Stoke-on-Trent: Would be transferred to West Midlands Trains and would operate twice an hour. Services would be operated with bimode units, perhaps similar to the class 755 but with more carriages.
In an ideal world (which we're probably the furthest away from at this point) the Class 379 fleet could actually work for this [albeit with the service retained by XC in case WMT aren't in a position to take on more units] in 8-car formation (14 diagrams with 2 spare units; not sure how many diagrams are needed for this service specifically) running on batteries between Coventry and Didcot, if getting all units fitted with batteries and then leasing them (which we know is expensive) remains cheaper than ordering new bi-mode units.
Separating the Birmingham-Leeds, Birmingham-Newcastle and Leeds-Newcastle/Edinburgh passenger flows
However, there is still the issue of Sheffield and Derby (both very sizeable cities) losing their direct train to Scotland, although it may not be a major issue if it's significantly cheaper for them to reach the ECML and then get an LNER service from whatever interchange is easier for them to reach.
 

Manutd1999

Member
Joined
21 Feb 2021
Messages
549
Location
UK
Separating the Birmingham-Leeds, Birmingham-Newcastle and Leeds-Newcastle/Edinburgh passenger flows

there is still the issue of Sheffield and Derby (both very sizeable cities) losing their direct train to Scotland
That depends, it could be possible to extend the 'fast' service via Doncaster to Edinburgh instead.

There exists a series of re-organisations which, if done together, could simplify the different passenger flows significantly:

1) Cut the XC Edinbrugh service back to York
This train would be for the Leeds to Derby/Birmingham flows (potentially a 5-car Voyager would be sufficient)

2) Reinstate the XC fast service to Newcastle via Doncaster and extend to Edinburgh
This train would be for the Birmingham/Sheffield/Derby to Newcastle/Edinburgh flows (double Voyager if possible?)

3) Extend one of the TPE Newcastle service to Edinburgh
This train would be for the Leeds to Newcastle/Edinburgh flows

4) Finally, the existing Avanti Birmingham-Glasgow/Edinburgh WCML service could run to Glasgow every hour
This would simply the Birmingham to Scotland flows (1ph to Edinburgh via ECML + 1ph to Glasgow via WCML)
 

heathrowrail

Member
Joined
18 Nov 2022
Messages
222
Location
Newbury
There have been quite a few threads here about how CrossCountry does not work well at the moment, with frequently overcrowded trains, low frequencies and poor connections.

My proposal to solve some of these issues is for CrossCountry to solely operate services on the southwest to northeast diagonal route, with all other services transferring to other operators. Therefore the CrossCountry network would operate as follows:
  • Plymouth to Newcastle via Leeds: Would remain with Crosscountry and would operate once an hour. Would not call at Worcestershire Parkway, Tamworth, Burton-on-Trent and Chesterfield. It would stop at all other stops that the class 220 and 221 services stop at.
  • Bristol to Leeds: Would remain with Crosscountry and would operate once an hour. This would call at Worcestershire Parkway, Tamworth, Burton-on-Trent, Chesterfield, perhaps University and all the other stops that the class 220 and 221 services stop at.
  • Nottingham to Birmingham: Would remain with CrossCountry and would be unchanged from how it currently operates
  • Nottingham to Cardiff: Would remain with CrossCountry and would be unchanged from how it currently operates
  • Birmingham to Stansted Airport: This would be transferred to East Midlands Railway but would otherwise operate how it does currently.
  • Coventry to Manchester via Birmingham and Stoke-on-Trent: Would be transferred to West Midlands Trains and would operate twice an hour. Services would be operated with four or five carriage EMUs.
  • Birmingham Moor Street to Reading: Would be transferred to Chiltern and would operate once an hour calling at Solihull, Warwick Parkway, Leamington Spa, Banbury, Oxford and Didcot Parkway. Services would be operated with four or five carriage DMUs.
  • Reading to Bournemouth: The existing GWR Reading to Basingstoke service would be extended to Bournemouth and would operate once or twice an hour.
Overall this would improve frequencies over most of the CrossCountry network and provide a service that is better suited to the many short trips common on CrossCountry trains. It would also allow more suitable rolling stock to be used, for example EMUs on the electrified route between Coventry and Manchester. I know some passengers would lose their direct services and would have to change trains, which would be a particular issue if travelling from Manchester to the south coast. However more frequent services between Bristol and Leeds and Coventry and Manchester should means most passengers have shorter connection times.
Sorry but this wouldn't work at all.

A lot of people travel from Birmingham (New Street not Moor Street) to Bournemouth for the day especially during the summer.
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,750
Location
Glasgow
The problem with running the Avanti Euston-Birmingham-Scotland services all to Glasgow instead of Edinburgh would be that WCML stations end up having a poor Edinburgh service. So unless TPE runs all the Glasgow trains to Edinburgh and serves it hourly then I can't see this happening.

Even then, the likes of Warrington, Crewe, Stafford and Wolves will have no direct Edinburgh train
 

cle

Established Member
Joined
17 Nov 2010
Messages
5,637
The problem with running the Avanti Euston-Birmingham-Scotland services all to Glasgow instead of Edinburgh would be that WCML stations end up having a poor Edinburgh service. So unless TPE runs all the Glasgow trains to Edinburgh and serves it hourly then I can't see this happening.

Even then, the likes of Warrington, Crewe, Stafford and Wolves will have no direct Edinburgh train
I think that is fine. Crewe will eventually have HS2 to Edinburgh. The others are edge and easy changes at Preston/wherever.

Birmingham-Glasgow makes sense because XC can do Birmingham-Edinburgh.

Manchester-Edinburgh and Manchester-Glasgow would ideally both be hourly. Or Glasgow is bi-hourly, and split with Liverpool.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
I think that is fine. Crewe will eventually have HS2 to Edinburgh. The others are edge and easy changes at Preston/wherever.
Preston's train to Edinburgh is the Avanti.
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
I want 7 car 80x for XC (1 First, 6 Standard, with option for 1 extra of each), which would be tri-mode(?) with overhead, third rail and Diesel or an alternative.

In areas like Birmingham I’m a big fan of standardised half hourly pathing, so I’d like to see:

1tph Edinburgh to Plymouth via Doncaster
1tph York to Reading via Leeds
… Simply switching the routes between York and Shef, would gladly take advice on Lds-Bri demand

1tph Nottingham to Cardiff, as current
1tph Nottingham to Hereford, combining NOT-BHM (XC) and BHM-HFD (WMR) services
… 2nd fast tph for Bromsgrove, plus easier Yorks/NE to Worcs connection

1tph Manchester to Bristol TM
1tph Manchester to Bournemouth
… If bimodes were brought in then no need for 350 shuttles, through running important.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Not just that though as it's also the TPE. However the frequency would be poor (and 5 carriages may not be enough) without an increase if Avanti were to stop.
Fair enough but TPE is only 0.5tph (same as Avanti) and half the length so overall capacity would be a third.

If you changed Avanti to Glasgow only then you could make TPE Edinburgh only and force Liverpool to Glasgow to change at Preston.
1tph York to Reading via Leeds
Extend to Southampton?
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,750
Location
Glasgow
Fair enough but TPE is only 0.5tph (same as Avanti) and half the length so overall capacity would be a third.

If you changed Avanti to Glasgow only then you could make TPE Edinburgh only and force Liverpool to Glasgow to change at Preston.

Extend to Southampton?
Im all for it as it simplifies crew aswell. Avanti won't need an Edinburgh base, nor will TPE need a Glasgow base. Plus TPE already operate ECML services out of Edinburgh.

However I think most TPE services in Scotland are crewed by Glasgow, even the ECML ones as I don't think Edinburgh has a crew base.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,864
Location
East Anglia
I want 7 car 80x for XC (1 First, 6 Standard, with option for 1 extra of each), which would be tri-mode(?) with overhead, third rail and Diesel or an alternative.

In areas like Birmingham I’m a big fan of standardised half hourly pathing, so I’d like to see:

1tph Edinburgh to Plymouth via Doncaster
1tph York to Reading via Leeds
… Simply switching the routes between York and Shef, would gladly take advice on Lds-Bri demand

1tph Nottingham to Cardiff, as current
1tph Nottingham to Hereford, combining NOT-BHM (XC) and BHM-HFD (WMR) services
… 2nd fast tph for Bromsgrove, plus easier Yorks/NE to Worcs connection

1tph Manchester to Bristol TM
1tph Manchester to Bournemouth
… If bimodes were brought in then no need for 350 shuttles, through running important.

I’d mostly be in agreement however you cannot omit Leeds from direct Edinburgh services. That’s a large revenue generator on the route that has already lost the planned hourly TPX Liverpool-Edinburgh services.
 

HST43257

Established Member
Joined
10 Apr 2020
Messages
1,650
Location
York
I’d mostly be in agreement however you cannot omit Leeds from direct Edinburgh services. That’s a large revenue generator on the route that has already lost the planned hourly TPX Liverpool-Edinburgh services.
Oh yeah sorry should’ve mentioned, would extend the TPE to EDB. Wakefield are the losers in the situation but I’d rather give Dby/Shf a faster service.

== Doublepost prevention - post automatically merged: ==

Extend to Southampton?
Sure if the demand is there but is not the type of thing that I’d stress over getting done
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,478
Location
Northern England
1tph Nottingham to Cardiff, as current
1tph Nottingham to Hereford, combining NOT-BHM (XC) and BHM-HFD (WMR) services
… 2nd fast tph for Bromsgrove, plus easier Yorks/NE to Worcs connection
WMR have just taken delivery of new stock (196s) for BHM-HFD though, and there's nowhere obvious to redeploy them.

In fantasy land, if you wanted a NOT-HFD service then maybe you could have
  • The current 4-car 196s plus a suitably sized follow-on order go to CrossCountry for their current Turbostar routes plus NOT-HFD, leaving the 2-car ones with WMR to operate Birmingham-Shrewsbury (in pairs) and Leamington-Nuneaton (individually) - I believe there are enough for this to happen
  • The current CrossCountry 170s go to EMR, displacing the 158s
  • The 158s join their classmates at Great Western, supplementing the increasingly stretched Turbo and Sprinter fleets down there
So you'd end up with CrossCountry's Turbostar fleet replaced with 196s; an all-170 regional fleet at EMR as originally planned; and a much-needed capacity increase at GWR (which would hopefully also take some pressure off XC on that section)
 
Status