Peter Sarf
Established Member
Moderator note: Split from https://www.railforums.co.uk/threads/mml-electrification-progress-updates.110445
Yes basically its all sources suggest etc etc.
My only hope is that if MML electrification gets paused that the teams now created can move straight on to HS2 work. Then back to MML after. But that would be far to sensible !.
Mods feel free to start a new thread please if this is getting too speculative.
"MML wiring at risk". does anyone have a subscription to this magazine? can we get some more info on this?
My bold - its on page 9 opposite page 8 in my Modern Railways (April 2023).It's an item on p. 13, facing the report of HS2 rescheduling on p. 12. It repeats a lot of stuff we've heard before, including the board meeting in #5987, and says sources have suggested MML electrification may be sacrificed to divert money to HS2. "Asked about the Government's commitment to the MML scheme, the DfT ... did not offer any specific commitment to the scheme. It said the Rail Network Enhancement Pipeline would be published 'in due course'."
There's also a feature on pp. 64-5, based on a presentation to the Chartered Institution of Railway Operators (date not stated). It says the Wigston limit of the current works was influenced by the spare capacity of the Braybrooke feeder. The target is to have most construction finished for April 2024 for entry into service in 2025, aligning with the introduction of the Aurora fleet.
There's a good deal about the OLE changes south of Bedford.
"Delivering new trains to operate on new or upgraded infrastructure requires Network Rail and EMR to work in partnership. One example of this is the identification of sites for automatic power changeover for the Auroras between electric and diesel modes, including at Wigston, Corby and a location dubbed London Gateway (in the Elstree area)." This seems to contradict #6045.
Yes basically its all sources suggest etc etc.
My only hope is that if MML electrification gets paused that the teams now created can move straight on to HS2 work. Then back to MML after. But that would be far to sensible !.
Mods feel free to start a new thread please if this is getting too speculative.
Last edited by a moderator: