Progress on Avanti West Coast's 805/807s Hitachi AT300 sets

Status
Not open for further replies.

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,956
Location
Mold, Clwyd
I think they could be in service quicker than other new trains as it is effectively a version of a train already in service with GWR, LNER and TPE.
And the first two 805s have run under their own power, in normal traffic, between Wolverhampton and Glasgow.
But the railway often finds reasons not to put new trains in service.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

800001

Established Member
Joined
24 Oct 2015
Messages
7,404
And the first two 805s have run under their own power, in normal traffic, between Wolverhampton and Glasgow.
But the railway often finds reasons not to put new trains in service.
But one has gone back to Dalby as it’s got engine issues.
 

The Chimaera

Member
Joined
15 Jun 2018
Messages
96
As yet no AWC staff are trained on the type so I wouldn’t be expecting them in passenger service any time soon.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,404
As yet no AWC staff are trained on the type so I wouldn’t be expecting them in passenger service any time soon.
Because they have not been handed over to Avanti yet, they are still under going testing on behalf on Hitachi, crewed by either GBRF or Freightliner drivers.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,846
Location
Croydon
Todays Regulatory announcement about Avanti West Coast contains following statement


As Financial Regulatory statements are checked for accuracy, (so always better than Press office statements) it appears to be confirmation that trains (multiple) will be replacing voyagers before end of 2023

I could read the statement as saying one more more Voyagers will be replaced by the start of 2023. But, since 2023 has started, I will assume by the end of 2023 but only one or more Voyagers.
It says "from 2023". One set running one service before the end of the year would seem to comply.
You immediately reminded me of TPEs grand effort to fulfil a franchise commitment they had. Was it not one train on one day for one service in the end !. To me TPE and to a lesser extent Avanti are in the same club - Still there for want of a bigger OLR.

== Doublepost prevention - post automatically merged: ==

And the first two 805s have run under their own power, in normal traffic, between Wolverhampton and Glasgow.
But the railway often finds reasons not to put new trains in service.
I would not say normal traffic. I thought it was test runs and not by Avanti drivers.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,956
Location
Mold, Clwyd
I would not say normal traffic. I thought it was test runs and not by Avanti drivers.
Yes, but if they ran normally it means that physical and electrical clearance must have been given for the route (which must mean the whole WCML really).
If they ran under possession it would be less promising.
 

Boodiggy

Member
Joined
8 Nov 2012
Messages
642
Yes, but if they ran normally it means that physical and electrical clearance must have been given for the route (which must mean the whole WCML really).
If they ran under possession it would be less promising.
They did run in traffic. Wouldn’t get a possession between Wolves and Glasgow for a start and it wasn’t a protected path. There were both day and night runs in normal traffic.
And of course the train would be fully cleared. There is a misunderstanding around gauge clearance that a train is sent along in the hope it will not hit anything… the reality is very different.
It seems some people have also been confused that as the new MU speed profile only goes as far north as Weaver the trains wouldn’t go beyond there.
 

Skie

Established Member
Joined
22 Dec 2008
Messages
1,239
And of course the train would be fully cleared. There is a misunderstanding around gauge clearance that a train is sent along in the hope it will not hit anything… the reality is very different.

This has always amused me, do people think they run a polystyrene train around and look at what survives at the end of the run for gauging work? :D
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,143
There is a misunderstanding around gauge clearance that a train is sent along in the hope it will not hit anything… the reality is very different.
Unless it’s a GBRF train.
It seems some people have also been confused that as the new MU speed profile only goes as far north as Weaver the trains wouldn’t go beyond there.
They’ll go as far north as Blackpool in theory.
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,143
I wouldn't be suprised if they occasionally go further north like the voyagers seem to randomly do.
Although 807s on Liverpool services should prevent that by freeing up 390s
From what I understand no traincrew that signs north of Preston will be training them.
I suspect if Crewe depot doesn’t materialise then Preston will end up training them for the Blackpool services. Then we might see them in scotland.
 

YourMum666

Member
Joined
11 Nov 2019
Messages
281
Location
United Kingdom
From what I understand no traincrew that signs north of Preston will be training them.
I suspect if Crewe depot doesn’t materialise then Preston will end up training them for the Blackpool services. Then we might see them in scotland.
at some point, they’ll end up running north of preston but not with EPS
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,143
at some point, they’ll end up running north of preston but not with EPS
How though if the train crew that sign north of Preston won’t be learning them?
They were never intended to run at eps speeds.
 

800001

Established Member
Joined
24 Oct 2015
Messages
7,404
wait but they were being tested north of preston surely there is a chance they might get signed by the guys up at preston
They are being tested there as there will be paths available for this.
The testing trains are crewed by either GBRF or Freightliner drivers.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,298
Location
West Wiltshire
This has always amused me, do people think they run a polystyrene train around and look at what survives at the end of the run for gauging work? :D
There is a photo of this being done on a class 317 on the widened lines to Moorgate, when the line first reopened with slab track and 317s were new, so not a completely daft notion.

But we all know they use laser scanners these days, then let the vegetation grow so a few odd branches still hit the trains.
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,143
wait but they were being tested north of preston surely there is a chance they might get signed by the guys up at preston
That’s GBRF doing the testing.
As it stands only Euston, Wolves, Liverpool, Holyhead and Crewe (if/when it opens) are going to be learning them.
 

Some guy

Member
Joined
6 Feb 2022
Messages
508
Location
Preston
That’s GBRF doing the testing.
As it stands only Euston, Wolves, Liverpool, Holyhead and Crewe (if/when it opens) are going to be learning them.
Train managers at Preston will sign them as Crewe is only getting a drivers depot and that depot isn’t open until December 2024
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
If no drivers further up north will sign them, what will this mean for future diversions on diesel only lines north of Cheshire?
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,143
Train managers at Preston will sign them as Crewe is only getting a drivers depot and that depot isn’t open until December 2024
Sorry I was only referring to drivers.
I’d take that December 2024 with a pinch of salt.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,824
Location
UK
If no drivers further up north will sign them, what will this mean for future diversions on diesel only lines north of Cheshire?
I presume you're alluding to diversions via the G&SW. These will unfortunately be impossible in future. They're already difficult enough as things stand, with only a small Voyager fleet and 2 sets already off-lease - hence why the G&SW services over upcoming weekends and during the 16 day blockade at Carstairs consist largely of Carlisle shuttles.
 

AJDesiro

Member
Joined
10 May 2019
Messages
929
Location
Rugby
I presume you're alluding to diversions via the G&SW. These will unfortunately be impossible in future. They're already difficult enough as things stand, with only a small Voyager fleet and 2 sets already off-lease - hence why the G&SW services over upcoming weekends and during the 16 day blockade at Carstairs consist largely of Carlisle shuttles.
It’ll go the same way as the 57 hauled pendos.
That’s a shame, it’s things like this that make me wonder why they didn’t just order 27 805s (same number of carriages as the whole AWC 80X order), besides any issues such as depot space, as one of the great things about the formerly 20-strong voyager fleet was its diversion capability - a godsend when the Birmingham loop is shut, I’d much rather go via coleshill to Birmingham than a bus!
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,143
That’s a shame, it’s things like this that make me wonder why they didn’t just order 27 805s (same number of carriages as the whole AWC 80X order), besides any issues such as depot space, as one of the great things about the formerly 20-strong voyager fleet was its diversion capability - a godsend when the Birmingham loop is shut, I’d much rather go via coleshill to Birmingham than a bus!
Agreed. Sadly the bean counters decide it costs too much to retain diversionary routes. Putting a bus on is the cheaper option.
 
Status
Not open for further replies.

Top