Class 701 'Aventra' trains for South Western Railway: progress updates

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,181
Location
West Wiltshire
Mixed messaging on that though with Rock Rail seemingly accepting the units as they've charged them as assets against the loans they have in place to purchase the units - why would they do that with Alstom if their customer doesn't want them? Suspect a lot is being suppressed in the background as Rock Rail is at risk of not being able to service its debts if its has no lease income and will have to declare itself insolvent.
Without the commercial contracts between Rock Rail and train builders, or the Finance agreements or the Leases to SWR, difficult to know the thresholds for conditions to be met, and when regarding transfer and financing.

It is clear from Rock Rails filed Accounts last year that it was getting compensation income, presumably from Bombardier. Alstom would have inherited the contract so presumably had to continue any late penalty or non performance penalty.

What I don't know is if fixes have been done, or if they have taken some trips on mainline to reach fault free mileage and handover. Or even if contracts have same back to back handover requirements. It could be those financed are now being leased by SWR. I would guess there are hefty penalties for cancellation in the early years to provide a guarantee for those buying the trains that they will get a return on their investment.

Of course DfT will not be impressed if SWR is incurring lease costs for 280 class 701 vehicles, whilst also sub-leasing 707s and paying extension leases (and unplanned repairs) on 455s. Personally I think there must be some looming crisis deadlines, even if it is all hidden from public.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Warrior2852

Member
Joined
27 Oct 2018
Messages
318
Have they done away with the Bombardier brand entirely since the Alstom takeover? i.e. would the newer built 701s still say Bombardier in the various places manufacturers put their logo, or will they now say Alstom on newer trains?
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,721
Alstom are phasing out the Bombardier branding from their products.

For example, the TRAXX 3 locomotives which are manufactured in Kassel used to have the word "Bombardier" embossed in their front panel. The latest locos outshopped from that plant no longer have that.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,883
Location
Cambridge
Well, I mean it’s fair enough really isn’t it. It’d be like Co-Op continuing to bring out products with Somerfield branding way back when.
(I’m only 19 and wasn’t born local, so I have no clue how I remember Somerfield)
 

Jturner98

Member
Joined
2 Jan 2021
Messages
320
Location
Kent
I can confirm that the Bombardier brand is very slowly starting to disappear, will it disappear completely from trains? Probably not but Alstom are in a hurry to remove it. Thinking back I still remember some of the early Electrostars still have Adtranz on them. So I think it won’t disappear completely.
 

AlexNL

Established Member
Joined
19 Dec 2014
Messages
1,721
It's unlikely to disappear from trains which are currently in service (especially those where the brand is embossed in some plate work) as nobody's going to pull a train from service to remove a builder's mark, but it shouldn't be there anymore on newly built vehicles.

The RER NG for Paris is a good example: these trains were to be built by Alstom and Bombardier in a consortium. Both names were featured on the artist impressions. Now that the first train is doing its testing, the Bombardier brand has been removed.
 

Peter Sarf

Established Member
Joined
12 Oct 2010
Messages
9,704
Location
Croydon
It's unlikely to disappear from trains which are currently in service (especially those where the brand is embossed in some plate work) as nobody's going to pull a train from service to remove a builder's mark, but it shouldn't be there anymore on newly built vehicles.

The RER NG for Paris is a good example: these trains were to be built by Alstom and Bombardier in a consortium. Both names were featured on the artist impressions. Now that the first train is doing its testing, the Bombardier brand has been removed.
I wonder why Alstom want to be associated with these (701s) trains ?.
 
Last edited:

PG

Established Member
Joined
12 Oct 2010
Messages
3,470
Location
at the end of the high and low roads
Sorry, I mean the 701s.
Well I guess the answer to your question then is likely to be that as the manufacturer Alstom wants its name on them to benefit from supplying the spare parts over the life of the trains. At the rate things are going some items may be required before the train has carried any fare paying passengers!
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,273
Well I guess the answer to your question then is likely to be that as the manufacturer Alstom wants its name on them to benefit from supplying the spare parts over the life of the trains. At the rate things are going some items may be required before the train has carried any fare paying passengers!
They'd still get the income without their name being tarnished by being on the lame trains!
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,181
Location
West Wiltshire
One question that I have (and apologies if it is already answered, but I have missed it), is the ORR authorisation for 5car sets to work in multiple lists 701 501-502 as DV and 701 503-530 as DC anyone know what difference between a DV and a DC unit ?

THE RAILWAYS (INTEROPERABILITY) REGULATIONS 2011, AS AMENDED AUTHORISATION OF CL 701/5 AVENTRA (DC & DV) UPGRADE FOR MULTIPLE UNIT OPERATION
UNIT NUMBERS (INCLUSIVE):
CLASS 701/5 DV 701501-701502
CLASS 701/5 DC 701503-701530

 

XCTurbostar

Established Member
Joined
13 Sep 2014
Messages
2,558

AM9

Veteran Member
Joined
13 May 2014
Messages
16,048
Location
St Albans
701001 is also authorised for DV operation.
Is that just a capability included for testing and driver training, or is it a genuine attempt to create a fleet that might at some point in it's life require an ac/OLE capability for in (passenger) service use?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,297
Is that just a capability included for testing and driver training, or is it a genuine attempt to create a fleet that might at some point in it's life require an ac/OLE capability for in (passenger) service use?
Testing only AIUI, there’s only a couple of each length of unit fitted with pans, and I’d expect the pans to be removed on completion. But it ticks the box for any future possible transfers elsewhere, however unlikely.

A very similar approach was taken with the 707s. I’d also expect any AC testing would not be done by SWR staff, but a freight operator with the relevant route knowledge.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
Is that just a capability included for testing and driver training, or is it a genuine attempt to create a fleet that might at some point in it's life require an ac/OLE capability for in (passenger) service use?
Testing only AIUI, there’s only a couple of each length of unit fitted with pans, and I’d expect the pans to be removed on completion. But it ticks the box for any future possible transfers elsewhere, however unlikely.

A very similar approach was taken with the 707s. I’d also expect any AC testing would not be done by SWR staff, but a freight operator with the relevant route knowledge.
Yeah, this. It's three in total: 701001, 701501, and 701502. I've seen nothing suggesting that SWR want a DV capability for their own use, leading me to suspect - in the absence of any better information - that it's Alstom and/or the ROSCO wanting to verify the capability for future reference.
 

moley

Member
Joined
12 Jun 2011
Messages
409
Is there not a legal requirement that all new third rail classes must be compatible with overhead wires and have test capability tested and verified.

Hence why it was also done on the 707s.

The pans are then removed.
 

stuving

Member
Joined
26 Jan 2017
Messages
737
The first units were taken to the Velim test track for their full-speed dynamic testing, so they needed to run off 25 kV AC for that. There is a video of one there in 2020, with pans up (though not on the test track itself) here.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,048
Location
St Albans
Is there not a legal requirement that all new third rail classes must be compatible with overhead wires and have test capability tested and verified.

Hence why it was also done on the 707s.

The pans are then removed.
I would have thougfh that the RoSCo would need to establish that capability for future leasing bid purposes. Not sure where the high density 23m 701s could be employed under wires, - maybe GA would be a possibility.
 

Goldfish62

Veteran Member
Joined
14 Feb 2010
Messages
13,205
I would have thougfh that the RoSCo would need to establish that capability for future leasing bid purposes. Not sure where the high density 23m 701s could be employed under wires, - maybe GA would be a possibility.
They're 20m coaches, not 23m.
 