Armchair Bob
Member
I see that 197017 made it's debut on the Ffestiniog branch on Thursday and was on MIA on Friday. That makes 15 units now used in service.
It's been in service since last Sunday 1203 Chester to Warrington BQ.I see that 197017 made it's debut on the Ffestiniog branch on Thursday and was on MIA on Friday. That makes 15 units now used in service.
As I read the TfW statement, only some of the 175s were withdrawn for inspection.The 175s now appear to be re entering standard service saw two in Pembrokeshire in under an hour
Yes and no, at least per the original plans (there are some question marks regarding the units which were planned to have first class). On the original plans, the front and rear coaches are identical for 2-car and 3-car class 197s* but the middle coach isn't just seats and tables.Having been on a 2 carriage 197 im wondering how the 3 car 197s will be layed out. Will it be like the 2 and 3 car 175s where the front and back carriage of a 3 car will be identical to the 2 car trains and the middle carriage will mostly just be seats and tables?
Just another six bay tables in the middle coach, one of which is aligned for maximum pillar-block with a window pillar in the centre of the bay. First class was to be about half of the coach with no toilet was to be a first class section with 2+1 seating. Strange that it was at the opposite end from the catering carriage but that's how it was. Not sure if the plans for the first class section remain valid following the suggestion that it will now be an upgrade-on-the-day 'business zone' type thing but here are the original seat plans:Also on the subject of tables, i counted 10 sets of tables on the 2 car. 6 sets in one carriage and 4 sets in the carriage with the catering area and toilet. In a 3 car will there be more tables in the middle carriage or just another 6 sets? It will be interesting to see how much is taken up with the first class section too. I assume the carriage with the toilet and the catering area will have first class at the end of that carriage which pretty much wipes out an entire carriage on a 3 car set for first class/catering and the toilet and disabled seating area.

Are you able to say where you got that diagram?Just another six bay tables in the middle coach, one of which is aligned for maximum pillar-block with a window pillar in the centre of the bay. First class was to be about half of the coach with no toilet was to be a first class section with 2+1 seating. ...
It's a diagram that was in the public domain around the letting of the original TfW franchise, copies have been posted here previously. I can't recall exactly what document it came from, though.Are you able to say where you got that diagram?
All of the luggage racks are either next to external doors or one seperated from them by open spaces like the bike area. If you put the rack by the cab people would have to maneuver their luggage down the aisle. There's also the risk that luggage in that area would block access to the drivers cab. It's not a good place to put the rack.The window alignment in 1st makes me laugh, particularly as if you partly reversed it (luggage rack next to cab, then single seat, then bay) it would be close to fully aligned. Plus you'd get one more seat in as you'd not need the single seats to be 1+1, they could be 2+1.
All of the luggage racks are either next to external doors or one seperated from them by open spaces like the bike area. If you put the rack by the cab people would have to maneuver their luggage down the aisle.
There's also the risk that luggage in that area would block access to the drivers cab.
It's not a good place to put the rack.
TrueComparative upside: makes it less likely to be nicked.
Blocking a cab is more of a risk than blocking a vestibule. Is there any train in service today with the luggage rack directly adjacent to the cab door?Most InterCity type trains have luggage storage at the ends of the vehicle where it could technically block access to the vestibule. I don't think I've ever seen it do so.
I'm aware of this, I've used Northerns units - however.....Totally disagree.
But if you must, it'd also be possible to reverse the layout entirely, making a table for three, a table for two and a row of 2+1 airline seats, all fully window aligned. And before you say that'd block the door, it wouldn't, because that's exactly (in 2+2 form) what the Northern 195 end sections are laid out as.
.....maybe there's a perfectly rational design reason behind it. The cab door is a different design to that used on the Northern units - it may well be that it precludes the offset seating pattern that Northern use. Also, Northerns seats are presumably narrower than the 1st class seats TfW are using.It just shows a lack of thought, which I can understand for Standard but is really not acceptable for a premium class of service.
Thanks for posting these. It would make more sense to have first class at the very end of the carriage, the other side of the doors by the catering area.Yes and no, at least per the original plans (there are some question marks regarding the units which were planned to have first class). On the original plans, the front and rear coaches are identical for 2-car and 3-car class 197s* but the middle coach isn't just seats and tables.
* except the ones with first class
Just another six bay tables in the middle coach, one of which is aligned for maximum pillar-block with a window pillar in the centre of the bay. First class was to be about half of the coach with no toilet was to be a first class section with 2+1 seating. Strange that it was at the opposite end from the catering carriage but that's how it was. Not sure if the plans for the first class section remain valid following the suggestion that it will now be an upgrade-on-the-day 'business zone' type thing but here are the original seat plans:
View attachment 130248
I am rather struck with the fact that there is as much luggage rack provision within the first class area occupying half a coach as there is for the other 2 1/2 coaches of non-1st class. Do first class passengers have 4 to 5 times more luggage ?.The window alignment in 1st makes me laugh, particularly as if you partly reversed it (luggage rack next to cab, then single seat, then bay) it would be close to fully aligned. Plus you'd get one more seat in as you'd not need the single seats to be 1+1, they could be 2+1.
Probably not a big issue as I wonder how long does first class have left.
It was meant to be the last 14? units of the /1 subclass, and currently only 113 has been delivered by road to Donnington.Current talk is that it'll be an upgrade-on-the-day "business zone" type arrangement, but given the (lack of) success of that I'm inclined to think there's a fair chance all units will just end up as Standard only anyway. Have any been built with 1st yet?
Surely they will keep 1st Class/Business Class as members of the Welsh Government (on expenses) will not want to travel with the poor people?Current talk is that it'll be an upgrade-on-the-day "business zone" type arrangement, but given the (lack of) success of that I'm inclined to think there's a fair chance all units will just end up as Standard only anyway. Have any been built with 1st yet?
Oh don't be silly - they would be travelling in an executive jetSurely they will keep 1st Class/Business Class as members of the Welsh Government (on expenses) will not want to travel with the poor people?
Surely they will keep 1st Class/Business Class as members of the Welsh Government (on expenses) will not want to travel with the poor people?
Holyhead is now signed off with service starting Monday, however I don't know what prevents them. Possibly enough crew trained to reliably run the service?Earlier posts saying that 197s are not certified for passenger carrying duties to Crewe and Holyhead. Was wondering if people knew what further checks had to be undertaken before this is signed off? To me I’m slightly confused as I would have thought that NR clearance and crew training would be the only two operational barriers to service? Cheers
Presumably the platform-train interface, stopping places, selective door operation, operation at short platforms and things like that.Holyhead is now signed off with service starting Monday, however I don't know what prevents them. Possibly enough crew trained to reliably run the service?
Presumably this will be the first working spends the day between Manchester Holyhead and Llandudno then heads to Crewe in the evening: https://www.realtimetrains.co.uk/service/gb-nr:L07163/2023-03-06/detailedHolyhead is now signed off with service starting Monday, however I don't know what prevents them. Possibly enough crew trained to reliably run the service?
It may work to Chester but as far as I know Crewe isn't signed off for service yet.Presumably this will be the first working spends the day between Manchester Holyhead and Llandudno then heads to Crewe in the evening: https://www.realtimetrains.co.uk/service/gb-nr:L07163/2023-03-06/detailed
EDIT: That working does join to a 175 at Crewe so probably wont be that unless a swap will happen
That specific image I think is a screenshot I took myself of a PDF I received by e-mail. That e-mail was a long while ago and I can't remember for sure who it was from, but it would probably be one of the rail user/lobby groups who in turn had received it from TfW. I think prior to that I had a low-res jpg/png version via one of the other user groups, which was clearly the same layout but too low-res to read the measurements.Are you able to say where you got that diagram?
The "business zone" announcement made me think that they had changed the spec of the planned first class area and it would now be more-similar to standard but I guess that's not confirmed?Current talk is that it'll be an upgrade-on-the-day "business zone" type arrangement, but given the (lack of) success of that I'm inclined to think there's a fair chance all units will just end up as Standard only anyway. Have any been built with 1st yet?
Originally, it was to be 14 units with a lease start date of 31/12/2024. Prior to that date the 14 units were to be delivered either with "Decommissioned First class" (which I think just means with first class declassified) or as a mix of "Decommissioned First class" and "First class ready" units (I assume similar to the standard class interior but with slight differences to allow it to be ripped out easier and replaced with the first class interior). If that plan still stands, it's possible that 197113 just has a "First class ready" interior but we won't know for sure unless somebody gets in look inside it or has some insider knowledge.It was meant to be the last 14? units of the /1 subclass, and currently only 113 has been delivered by road to Donnington.
No worries, cheers.That specific image I think is a screenshot I took myself of a PDF I received by e-mail. That e-mail was a long while ago and I can't remember for sure who it was from, but it would probably be one of the rail user/lobby groups who in turn had received it from TfW. I think prior to that I had a low-res jpg/png version via one of the other user groups, which was clearly the same layout but too low-res to read the measurements.
Whenever I have travelled on anything that involves claiming costs from WG, or any other public or third sector organisation, it has been made very clear that you are expected to get the cheapest possible ticket, ideally an advance.Surely they will keep 1st Class/Business Class as members of the Welsh Government (on expenses) will not want to travel with the poor people?
Page 43/44/45 in this document also shows the layouts of two car, three car and three car with first class