Doubtless the moment has passed for Eurocentral to be planned in a way that isn’t entirely Lorry / motorway network centric. Yet again.
So much of the cost, and therefore decreased margins for Varamis, is the additional handling of goods at one or both ends. Which is why they operate in such a lean manner to and from RDCs and trunk connections between them.
So for the next time, when planning a major business park within (literally) metres of a major railway, is it so much to ask that they be aligned so one face of the building is effectively a platform, to a single electrified line, so that services like Varamis can effectively deliver point to point, like their competitors (the lorries) do extremely and effectively many many times a night. Roll cages on and off, pallet trucks on - none of this seems impossible.
There seems a certain undercurrent of being unsurprised by the potential failure of this operator, and others before it.
When the few hundred metres surrounding Mossend yard includes:
Amazon
DPD
UPS
Lidl
GXO Logistics
Evri
Gist
Warburtons
Morrisons
DX Express
Wincanton
I would assume one or more of the above are Varamis customers (but with a bunch of faff at either end to fill and unload lorries a few hundred metres away)
It seems not impossible that with some government intervention on a rail connection, and a bit of co-ordination between them, that a small EMU might have a bit of traffic to/from the West Midlands nightly ?
Or maybe we just keep waiting for someone to make a big enough battery for a lorry (and roll out tens of thousands of them)
You wonder what will be needed to accelerate the glacial pace of progress on rail freight.