West Coast freight paths vs passenger paths. How can things be improved?

Status
Not open for further replies.

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
I believe the issue is lack of capacity on the 2-track sections of the WCML between Crewe and Weaver Junction, rather than further north.
Will that theoretically get solved with the Liverpool leg of NPR, which I assume will also be the route of HS2 trains to Liverpool?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Can anyone say how well the intermodal trains from Daventry to Mossend perform over Shap and Beattock, hauled by Class 88s (4MW=5400HP under the wires)? These are far more powerful than Class 66s.
Taking a couple of examples from the current timetable, this intermodal is pathed for a diesel locomotive, trailing load 1000 tonnes, and is allowed 43 minutes from Lancaster to Shap Summit:
Whereas this intermodal is pathed (from Crewe onwards) for an electric locomotive, trailing load 1250 tonnes, and is allowed 39 minutes from Lancaster to Shap Summit:
So only 4 minutes quicker, although the electric has a slightly heavier load.

It is loaded aggregates trains that are really slow uphill, but there are very few of those on Shap. Most of the aggregates trains are to/from the Shap quarries, so are empty when returning uphill.

== Doublepost prevention - post automatically merged: ==

Automerged:
Will that theoretically get solved with the Liverpool leg of NPR, which I assume will also be the route of HS2 trains to Liverpool?
I guess so, although realistically I imagine NPR Liverpool to Manchester will be completed years later than HS2 Crewe to Manchester.
 
Last edited:

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
Taking a couple of examples from the current timetable, this intermodal is pathed for a diesel locomotive, trailing load 1000 tonnes, and is allowed 43 minutes from Lancaster to Shap Summit:
Whereas this intermodal is pathed (from Crewe onwards) for an electric locomotive, trailing load 1250 tonnes, and is allowed 39 minutes from Lancaster to Shap Summit:
So only 4 minutes quicker, although the electric has a slightly heavier load.

It is loaded aggregates trains that are really slow uphill, but there are very few of those on Shap. Most of the aggregates trains are to/from the Shap quarries, so are empty when returning uphill.

== Doublepost prevention - post automatically merged: ==

Automerged:

I guess so, although realistically I imagine NPR Liverpool to Manchester will be completed years later than HS2 Crewe to Manchester.
4 minutes is a path based upon the headway.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,334
Location
Nottingham
Taking a couple of examples from the current timetable
Thank you. That's very helpful
39 minutes from Lancaster to Shap Summit
Which, to my surprise, is only ten minutes longer than the 29 minutes allowed for the Glasgow Pendolino (with a stop at Oxenholme).

4 minutes is a path based upon the headway.
Indeed. It's a pity that the Daventry-Mossend Tesco trains seem to be pathed as diesels, despite being hauled by Class 88s (or so I understand). If the timetable hasn't been adjusted to time these paths as electric, then either the problem of freight congestion is less severe than we thought, or NR is not taking it seriously.

 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
4 minutes is a path based upon the headway.
Indeed. And a bit of wiring to Liverpool docks end would enable that Seaforth train to be electrically hauled all the way, saving those 4 minutes. An illustration of how modest investment in freight infrastructure can release capacity for passenger services.

I doubt if a 88 on diesel would have the oomph to haul a loaded train up the gradient from the docks.

It's a pity that the Daventry-Mossend Tesco trains seem to be pathed as diesels, despite being hauled by Class 88s (or so I understand). If the timetable hasn't been adjusted to time these paths as electric, then either the problem of freight congestion is less severe than we thought, or NR is not taking it seriously.
That Tesco train has a timing of 39 minutes from Lancaster to Shap, the same as the electrically hauled Southampton train I linked.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,287
Location
Bolton
I believe the issue is lack of capacity on the 2-track sections of the WCML between Crewe and Weaver Junction, rather than further north. The service pattern is the same as has always been proposed for Phase 2a, and, without the Golborne Link, the Phase 2b Crewe to Manchester Bill does nothing to increase WCML capacity north of Crewe.
Indeed. Plus diverting 1tph that would have run via the bypass lines onto the through lines at Crewe would likely also lead to unmanageable conflict at Crewe Basford Hall Jn, Winwick Jn, and Golborne Jn. Even with the Golborne Link, Wigan North Jn and Euxton Jn as they are would also risk becoming unmanageable. Very unlikely that the HS2 service will be stopping at Warrington Bank Quay also.
 

GRALISTAIR

Established Member
Joined
11 Apr 2012
Messages
10,510
Location
Preston Lancs
Whereas this intermodal is pathed (from Crewe onwards) for an electric locomotive, trailing load 1250 tonnes, and is allowed 39 minutes from Lancaster to Shap Summit:

So only 4 minutes quicker, although the electric has a slightly heavier load.
25% heavier. That’s quite a difference.

You beat me to it. 250 tonnes is more than slightly IMHO.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
Indeed so - previous post amended. Diesel hauled intermodals of 1200+ tonnes all seem to be looped at Tebay.
and as has been hinted at upthread, are a real curse.

I travel to see family in Edinburgh several times a year. I've lost count of the number of times we have been delayed, both north- and south-bound, by long freights which the locos just can't cope with. Last time northbound it was over an hour's delay which left us to eventually overtake a container train which was only put inside at Penrith. I don't know why it wasn't looped at Tebay - unless it was too long for the other loops.

There is a lot of merit in someone's suggestion that there should be a minimum power-to train weight ratio over Shap (and Beattock) although I can't imagine there isn't (- isn't this what a timing load is?) and probably a 2-loco requirement too.

If passenger rail is to work it has to be reliable, and my experiences are of just the opposite... It's a real embarrassment when I try to get family and friends to use trains and they turn out to be so bad!

Also tragic that rail freight which I wholeheartedly support is undermining rail passenger services.
 

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,271
In the May 23 timetable, one southbound Avanti daily skips Lancaster:
Conveniently, this would also be the best service for an end of working day connection from the Windermere branch.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,554
Location
"Marston Vale mafia"
No. A 45 minute wait at Oxenholme for the next service to Lancaster (the 1612 Edinburgh to Manchester Airport).

Why's it essential that this one calls at Motherwell thus mucking up the Takt (in so much that there is one)? Does ScotRail not run a service around that time that it substitutes for?

It's quite common that the non-through Windermere service doesn't make a good connection, though, I've been caught out by that before.
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
Why's it essential that this one calls at Motherwell thus mucking up the Takt (in so much that there is one)? Does ScotRail not run a service around that time that it substitutes for?
It is pick up only at Motherwell, so presumably to provide a direct evening service to Wolves/Brum. Most of the Avanti calls at Motherwell are on the Trent Valley services.
 

Agent_Squash

Established Member
Joined
22 Jul 2016
Messages
1,271
It is pick up only at Motherwell, so presumably to provide a direct evening service to Wolves/Brum. Most of the Avanti calls at Motherwell are on the Trent Valley services.

It doesn’t quite make sense though to disrupt what could be quite a lucrative flow for a once a day service.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,374
Location
belfast
Indeed. And a bit of wiring to Liverpool docks end would enable that Seaforth train to be electrically hauled all the way, saving those 4 minutes. An illustration of how modest investment in freight infrastructure can release capacity for passenger services.
This does seem the easiest solution to the problem identified here; More electrification at key places so more freight can run electric the whole way. Bonus points if it allows more passenger services to switch to EMUs or bimodes to switch to electric too.
and of course the class 93 and 99 locomotives that are coming soon will also contribute to reducing this problem
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
This does seem the easiest solution to the problem identified here; More electrification at key places so more freight can run electric the whole way. Bonus points if it allows more passenger services to switch to EMUs or bimodes to switch to electric too.
and of course the class 93 and 99 locomotives that are coming soon will also contribute to reducing this problem
Assuming the power available can accommodate it, that isn't certain. There are only a limited amount of hamsters in the wheels.
 

Trainbike46

Established Member
Joined
18 Sep 2021
Messages
4,374
Location
belfast
Assuming the power available can accommodate it, that isn't certain.
If there isn't enough power available in the OHLE, it should be upgraded. But I thought the power supply was sufficiently strong in the northern WCML, isn't it?

And I'm not sure what you mean with:
There are only a limited amount of hamsters in the wheels.
Could you clarify?
 

Peter0124

Established Member
Joined
20 Nov 2016
Messages
2,751
Location
Glasgow
9M55 (11:56 from GLC) also calls at Motherwell. It's fast from Carlisle to Lancaster though.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,700
If there isn't enough power available in the OHLE, it should be upgraded. But I thought the power supply was sufficiently strong in the northern WCML, isn't it?

And I'm not sure what you mean with:

Could you clarify?
You answered it yourself, the power supply is finite. I don't believe its proven that switching all freight to electric is doable.
 

AndrewE

Established Member
Joined
9 Nov 2015
Messages
7,350
66s?

"Tractors" with a power output or tractive effort which collapses above about 15mph... I have been delayed too many times by crawling freights to think they should have any future other than shunting in stone and Freigthliner terminals!
 

Greybeard33

Established Member
Joined
18 Feb 2012
Messages
4,335
Location
Greater Manchester
You answered it yourself, the power supply is finite. I don't believe its proven that switching all freight to electric is doable.
How much would it cost to complete the autotransformer upgrade of the north WCML power supply, which was started a number of years ago then abandoned?
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,287
Location
Bolton
It doesn’t quite make sense though to disrupt what could be quite a lucrative flow for a once a day service.
It's not once a day. Motherwell is the only station apart from Glasgow Central in the whole of the west of Scotland that has fast trains to England. It saves quite substantial time being able to connect at or railhead to Motherwell than going via Glasgow Central, so improving the service between the service between Motherwell and England has long been an important goal. There used to be multiple trains that stopped there instead of Lancaster, and the 1030 Down didn't used to call at Lancaster either. Same on Sundays. Nearly all have been ironed out.
 

Bevan Price

Established Member
Joined
22 Apr 2010
Messages
8,335
Thank you. That's very helpful

Which, to my surprise, is only ten minutes longer than the 29 minutes allowed for the Glasgow Pendolino (with a stop at Oxenholme).


Indeed. It's a pity that the Daventry-Mossend Tesco trains seem to be pathed as diesels, despite being hauled by Class 88s (or so I understand). If the timetable hasn't been adjusted to time these paths as electric, then either the problem of freight congestion is less severe than we thought, or NR is not taking it seriously.

If a Class 88 is not available for those Tesco trains, DRS usually provide a pair of Class 66s or 68s.
 

rapmastaj

Member
Joined
8 Oct 2021
Messages
214
Location
Leeds
The timetable needs sorting out because the poor connections between Lancaster / Oxenholme / Penrith are disastrous for local travel. When I lived in Lancaster an obvious day out was to the Lakes, but given timetables that often required both a long wait in Oxenholme then another long wait for a bus at Windermere, it's no surprise that the vast majority chose to drive instead.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,554
Location
"Marston Vale mafia"
The timetable needs sorting out because the poor connections between Lancaster / Oxenholme / Penrith are disastrous for local travel. When I lived in Lancaster an obvious day out was to the Lakes, but given timetables that often required both a long wait in Oxenholme then another long wait for a bus at Windermere, it's no surprise that the vast majority chose to drive instead.

That Stagecoach can justify a commercial fast 555 up the M6 from Lancaster in summer says that rail is getting it very wrong here. (The normal through 555 via the villages is very slow and is really just two separate bus routes stuck together). Only two quid at the moment too, though that's obviously not long term.
 