231010 on duty today
1 diagrammed daily.How many 231s are in service now, and how many are diagrammed daily?
Do you have one of the leaflets?
I'm no expert in the standards but it's not fake to say "your new trains are here" or whatever when they're only on 1 line, they're running, and more will be with time.
Thanks!1 diagrammed daily.
3 have entered service.
As @SuperLuke2334 saysHow many 231s are in service now, and how many are diagrammed daily?
Need the Rhymney line to be wired first"Modern Railways" reports that the 756s will enter service in the first quarter of 2025 (two years time), despite the first one already being at Canton depot. Is that a typo?
why can't they run as battery+DMUs for a bit charging wherever they can while the line is electrified?Need the Rhymney line to be wired first
It’s a wonder that TfW don’t fall foul of the Advertising Standards Authority being as they are distributing leaflets about the new trains when only one is in service.
why can't they run as battery+DMUs for a bit charging wherever they can while the line is electrified?
Dont forget they only got the 1 engine and don't think the batteries have enough rangewhy can't they run as battery+DMUs for a bit charging wherever they can while the line is electrified?
Well, they have been operational four working days in a row!
Ironically, that’s a 398 in the picture.
Dont forget they only got the 1 engine and don't think the batteries have enough range
Wikipedia Class 756
- On AC power:
- 2,600 kW (3,500 hp)
- On battery power:
- 1,300 kW (1,700 hp)
- On diesel power:
- 480 kW (640 hp)
that diesel really is small, I assume it's only for recovery/depot movement/assisting battery usage then?Wikipedia Class 231
Power output 1,500 kW (2,000 hp) at wheel
Only one engine but wasn't there a suggestion that once the planned wiring is complete the batteries might be able to get them to Bridgend and back (via Barry) without using the diesel at all? If so, perhaps they could manage the Cardiff-Cheltenham using the OHLE as far as Severn Tunnel Junction? Not likely to happen of course unless the crew conversion course between 231s and 756s is really quick and simple. Also, there may be one 756 delivered, but are more due anytime soon or are they focusing on the 398s (and wiring the relevant valleys) first?Dont forget they only got the 1 engine and don't think the batteries have enough range
Wikipedia Class 756
- On AC power:
- 2,600 kW (3,500 hp)
- On battery power:
- 1,300 kW (1,700 hp)
- On diesel power:
- 480 kW (640 hp)
Wikipedia Class 231
Power output 1,500 kW (2,000 hp) at wheel
I think there is space for four diesel engines which the 231 have. But for a 756 only one endine is fitted with the other three slots containing batteries.that diesel really is small, I assume it's only for recovery/depot movement/assisting battery usage then?
Seems an awful waste - is there nothing else they could be used for until the line is ready? (Even if they have to be subleased to another operator)I think there is space for four diesel engines which the 231 have. But for a 756 only one endine is fitted with the other three slots containing batteries.
Now I would think that, since enough electrification is a long way of, it would make sense for the 756s to have more engines and less batteries. Then replace some of the engines with batteries as electrification makes possible. OK a bit more expense on engines which could be spare parts in the future but the batteries when actually needed will be newer.
I imagine delivery of the 756s will coincide with the Rhymney valley electrification being completed as far as possible. TfW won't want to start paying leasing charges if they can't use them.Seems an awful waste - is there nothing else they could be used for until the line is ready? (Even if they have to be subleased to another operator)
I imagine delivery of the 756s will coincide with the Rhymney valley electrification being completed as far as possible. TfW won't want to start paying leasing charges if they can't use them.
Have they been built in any numbers yet? Stadler strike me as possibly pretty flexible on build dates.I have no idea how these trains are being financed, but can they really just have them put in storage and not have to pay anything until they decide they want to use the trains?
I don't know whether they've even been built yet? No doubt the relevant dates and what happens if any party fails to adhere to them will be in the contracts between TfW, Stadler and the Rosco.I have no idea how these trains are being financed, but can they really just have them put in storage and not have to pay anything until they decide they want to use the trains?





The 398s are being built in Valencia so wouldn't affect the FLIRT builds.It would make sense for stadler to have build one 756 to allow testing to start, and then have focused on getting the 231s/398s/other orders out, and for them to build the rest of the 756s last, shortly before electrification is complete. Though I don't have any evidence that this happened
Is the 231 out today? TfW are running a normal service.
Yes. Today’s unit is 231001, RealTimeTrains linkIs the 231 out today? TfW are running a normal service.