Interesting link within that article to a Railway Ramblers page about the site
www.railwayramblers.org.uk
Page / Article on link is probably what the Gaurdian sourced story from and includes more detail about the case and the historic nature of the bridge in railway terms - extract:
Certainly the issue does seem to be misuse of powers and desire not to use the proper processes for this sort of thing.
Yes, for me
Jan 2023 – Rare Norfolk bridge lost to “destructive forces”
HRE Group Press release: National Highways has “failed to fulfil its statutory obligations”, according to campaigners, after it infilled a historic bridge using permitted development rights that have now expired.
Page / Article on link is probably what the Gaurdian sourced story from and includes more detail about the case and the historic nature of the bridge in railway terms - extract:
Congham bridge, five miles east of King’s Lynn, is one of 3,100 legacy structures comprising the Historical Railways Estate, managed by the state-owned roads company on the Department for Transport’s behalf. One of only three surviving examples of its kind, the structure spanned the dismantled Midland & Great Northern Joint Railway which has featured in proposals to develop a cycle network across Norfolk.
On 14 October 2019, consultants acting for National Highways told the Borough Council of King’s Lynn & West Norfolk that Congham bridge represented “an ongoing and increasing risk to public safety” and was proposed for infilling under permitted development rights that apply only to temporary works in emergency situations. Costing £127K, the five-week project got underway on 22 March 2021, 17 months after the notification letter was sent.
The line passing beneath the bridge opened in 1879, but the original structure was completely replaced in 1926 – one of six similar projects to benefit from an innovative system of reinforced concrete components and blockwork, developed by pioneering railway engineer William Marriott.
Bridge specialist Alan Hayward – co-founder of Cass Hayward, a firm of consulting engineers – said: “Marriott was the engineer, locomotive superintendent and eventually general manager of the Midland & Great Northern Joint Railway. There was probably no other engineer to combine such multiple roles, except for the renowned Robert Stephenson.
“His achievements included the design of locomotives, station architecture and bridges, as well as the early development of precast reinforced concrete. A concrete works was established within the company’s workshops at Melton Constable, predating the facilities of railways such as the Southern and Great Western.
“The Congham bridge used precast jack arches, precast casings to the main beams, precast wall units, copings, bedstones and bricks. It was impressive and more elaborate than the other five he rebuilt, featuring elegant curved wing walls. The infilling leaves only two of its type to survive, both under National Highways’ custodianship.”
Certainly the issue does seem to be misuse of powers and desire not to use the proper processes for this sort of thing.
Yes, for me
Last edited: