I like it although it's strange that they extended HS2 all the way to Northern Ireland...
I don't think it would be more likely than a Stranraer to Bangor tunnel (Very unlikely with the Sea Depth between the UK and Ireland)If there ever were to be a tunnel between the UK and Ireland it would be from Holyhead to just north of Dublin.
It would probably be constructed with tubes suspended in the ocean.I don't think it would be more likely than a Stranraer to Bangor tunnel (Very unlikely with the Sea Depth between the UK and Ireland)
Maybe a split-route. Liverpool-Manchester common route then Manchester-Bradford-Leeds and Manchester-Sheffield-Doncaster with a Doncaster-Goole-Hull and a Leeds-Selby-Goole-Hull reconnection. A link from Doncaster to Selby as well before it continues North from Selby-York-Middlesborugh-Sunderland-Newcastle-Edinburgh route.Not too dissimilar to my idea from 2019 except without that Birmingham - Norwich high speed line:
My idea for a UK wide high speed rail network
The map above shows my idea for a UK-wide high speed rail network. HS2 will be built to the same route as currently planned but the eastern phase 2 branch will now be a separate project called HSMidland which will also have a branch to Doncaster. The Northern Powerhouse rail project will be...www.railforums.co.uk
I also agree with a South Coast HSL except this should go via Brighton. Manchester - Sheffield is good for a high speed flow but this may be better utilised by sending trains up to Leeds and then back down the Eastern HSL.
You probably only need one Anglo-Scottish high speed line north of the M62, so it’s either a choice of going up the West Coast or East Coast. If you go with the former, you’d still want an East Coast HSL as far as Newcastle, whereas if you only build the latter, you wouldn’t need another HSL paralleling the WCML north of Warrington. The East Coast route would also be much easier to build due to the flatter terrain.Maybe a split-route. Liverpool-Manchester common route then Manchester-Bradford-Leeds and Manchester-Sheffield-Doncaster with a Doncaster-Goole-Hull and a Leeds-Selby-Goole-Hull reconnection. A link from Doncaster to Selby as well before it continues North from Selby-York-Middlesborugh-Sunderland-Newcastle-Edinburgh route.
Unfortunately the Geography of the West Coast would mean big tunnels but a Liverpool/Manchester-Preston-Carlisle-Glasgow route could be done
No. Brighton services need to stop at East Croydon as well, and that's only 35 miles from Brighton so you would spend such a small amount of time at High speed it's not worth the costs.I also agree with a South Coast HSL except this should go via Brighton if being built to HS1 speeds.
I can see the sense of this. I'd personally terminate the eastern HSL just south of Newcastle and use the existing route onwards to Edinburgh, with a full HSL on the western side, as the benefit is greatest on that route - it's shorter, closer to Glasgow and the freight gets hammered on the classic line over the hills so separating express and slow traffic on that side is more important than on the Eastern side.You probably only need one Anglo-Scottish high speed line north of the M62, so it’s either a choice of going up the West Coast or East Coast. If you go with the former, you’d still want an East Coast HSL as far as Newcastle, whereas if you only build the latter, you wouldn’t need another HSL paralleling the WCML north of Warrington. The East Coast route also be much easier to build due to the flatter terrain.
![]()