Yesterday, was a 3car 158, today a 3car 166
Likely to be very busy in Bath area

Some Cardiff - Portsmouth trains unfortunately get reduced to 2car due to GWRs lack of serviceable rolling stock (should be 5car)

It should be a 5 car turbo, but it will almost definitely be short formed to a 3 car, although you have a good chance of it still being a turbo.

Expect it to be pretty packed especially around Bristol and Bath
Thanks both I did Bristol to Weymouth on Glastonbury weekend so can't be that bad. When do they release what's planned for the route?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,892
Location
West Country
Some Cardiff - Portsmouth trains unfortunately get reduced to 2car due to GWRs lack of serviceable rolling stock (should be 5car)
At the station earlier I heard a cancellation announcement with a reason I’ve never heard before: “this is due to a greater number of trains being out of service than normal.”
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,304
Location
Bath
At the station earlier I heard a cancellation announcement with a reason I’ve never heard before: “this is due to a greater number of trains being out of service than normal.”
It's a common reason used by GWR for short forming, that would be the first time I've heard it stretching to cancellations, it's fair to say that's not a good sign about the current situation.

== Doublepost prevention - post automatically merged: ==

Thanks both I did Bristol to Weymouth on Glastonbury weekend so can't be that bad. When do they release what's planned for the route?
In all honesty I wouldn't be so sure about that, they make a concerted effort that weekend. Rush hour sees passengers held back from the local services at Bath most days.

It will be on RTT at some point early the morning of the service most likely.
 
Last edited:

Anonymous10

Established Member
Joined
19 Dec 2019
Messages
2,631
Location
wales
It's a common reason used by GWR for short forming, that would be the first time I've heard it stretching to cancellations, it's fair to say that's not a good sign about the current situation.

== Doublepost prevention - post automatically merged: ==


In all honesty I wouldn't be so sure about that, they make a concerted effort that weekend. Rush hour sees passengers held back from the local services at Bath most days.

It will be on RTT at some point early the morning of the service most likely.
True however it was a 2 carriage train on the only non strike day and the train was the half hourly service from Parkway to temple meads if its as packed it'll be interesting
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,304
Location
Bath
True however it was a 2 carriage train on the only non strike day and the train was the half hourly service from Parkway to temple meads if its as packed it'll be interesting
You're probably just about late enough that it won't, if you were travelling a few hours earlier it might. Photos have been posted upthread, and whenever I have travelled through Bath Spa at that time these trains have had staff packing as many people as they possibly can on and having to tell the rest bad luck.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,151
Location
West Wiltshire
Just heard on the news as part of the £2bn Government levelling up projects there is enhanced trains in South West.

  • A £50 million grant will help create a new direct train service, linking 4 of Cornwall’s largest urban areas: Newquay, St Austell, Truro, and Falmouth/Penryn. This will level up access to jobs, skills, education, and amenities in one of the most economically disadvantaged areas in the UK.

Will stretch the wests train fleet which is already short of serviceable stock

 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,304
Location
Bath
Will stretch the wests train fleet which is already short of serviceable stock
As mentioned upthread recently trains were cancelled due to a lack of stock, it simply isn’t possible to do this without either a frequency decrease elsewhere or new units.

There is also obviously still MetroWest technically happening, which will require even more units and hasn’t been cancelled yet.

There is either some imminent announcement of extra rolling stock from elsewhere in the country, or more likely I fear no communication and this hasn’t been thought through.
 

FGW_DID

Established Member
Joined
23 Jun 2011
Messages
3,035
Location
81D & 81E
As mentioned upthread recently trains were cancelled due to a lack of stock

Lack of serviceable stock, there's a difference. There's never more working diagrams than units in a fleet.

Eg There are 33 diagrams for 33 Class 387 EMU, M-F 27 of those diagrams have workings leaving 6 units available for spares / maintenance requirements.
 

Benjwri

Established Member
Joined
16 Jan 2022
Messages
3,304
Location
Bath
Lack of serviceable stock, there's a difference. There's never more working diagrams than units in a fleet.

Eg There are 33 diagrams for 33 Class 387 EMU, M-F 27 of those diagrams have workings leaving 6 units available for spares / maintenance requirements.
Yes, sorry, was typing on a phone in a rush. My point was the fact there are not enough serviceable units to even run all services, let alone run all diagrams with workings, is a further worrying development in the situation in the west.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,151
Location
West Wiltshire
Seems GWR are getting extra stock from May

Extract of yesterdays Parliamentary debate
Now for the news my hon. Friend has been waiting for: I am happy to confirm that, subject to the provision of the necessary funding by the West of England Combined Authority, services between Bristol and Gloucester will be doubled to two trains per hour from the May 2023 timetable change as part of the wider MetroWest scheme. I thank my hon. Friend for helping make this happen and the West of England Combined Authority, which has worked in partnership with officials in my Department and the operator, Great Western Railway, to make this possible. GWR has identified all the rolling stock that it will need for the extra trains and is confident that it will have all the staff training completed in time to introduce the additional services from May. I hope that that provides the assurance my hon. Friend was looking for, but as always—and in answer to his request—I am happy to meet him to understand any further concerns, and to help him make this happen.
West of England Combined Authority meets 27th Jan to confirm funding


== Doublepost prevention - post automatically merged: ==

As mentioned upthread recently trains were cancelled due to a lack of stock, it simply isn’t possible to do this without either a frequency decrease elsewhere or new units.

There is also obviously still MetroWest technically happening, which will require even more units and hasn’t been cancelled yet.

There is either some imminent announcement of extra rolling stock from elsewhere in the country, or more likely I fear no communication and this hasn’t been thought through.
Confirmed yesterday evening in Parliament, subject to WECA funding ratification 27th Jan.

No idea how much extra stock, or where it is coming from, although if I was speculating, probably some units replaced by class 196, 197, as don't think any are yet surplus in Wales.
 
Last edited:

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,639
Location
Hampshire
Seems GWR are getting extra stock from May

Extract of yesterdays Parliamentary debate

West of England Combined Authority meets 27th Jan to confirm funding


== Doublepost prevention - post automatically merged: ==


Confirmed yesterday evening in Parliament, subject to WECA funding ratification 27th Jan.

No idea how much extra stock, or where it is coming from, although if I was speculating, probably some units replaced by class 196, 197, as don't think any are yet surplus in Wales.

It will be interesting to see from where, as aside from internal cascading I can’t see what else will be coming on to the market by then - 180s from EMR? 150s released by Stadlers from TfW? Unwanted 156s from EMR?
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,892
Location
West Country
No idea how much extra stock, or where it is coming from, although if I was speculating, probably some units replaced by class 196, 197, as don't think any are yet surplus in Wales.
If stock is coming from elsewhere my guess would be it would be something from the sprinter family; preferably something GWR already has to minimise crew training, which would lead to 150s or 158s. I'm not sure what the state is in Wales atm but I believe the first Stadler 231 went into service this week, so we may find some units available as they and the 197s are introduced.

There won't be anything becoming available as a result of the 196 introduction. All the 170s released at WMR are already spoken for at EMT.
 

SuperLuke2334

Established Member
Joined
23 Oct 2021
Messages
1,898
Location
Welsh Marches
If stock is coming from elsewhere my guess would be it would be something from the sprinter family; preferably something GWR already has to minimise crew training, which would lead to 150s or 158s. I'm not sure what the state is in Wales atm but I believe the first Stadler 231 went into service this week, so we may find some units available as they and the 197s are introduced.

There won't be anything becoming available as a result of the 196 introduction. All the 170s released at WMR are already spoken for at EMT.
The 231s are there to replace 769s until the 756s come in. 150s and 158s won't be free for a while, the latter due to the Cambrian. 175s are the most likely in my eyes as they're slowly going off lease now.
 

Dai Corner

Established Member
Joined
20 Jul 2015
Messages
6,990
The 231s are there to replace 769s until the 756s come in. 150s and 158s won't be free for a while, the latter due to the Cambrian. 175s are the most likely in my eyes as they're slowly going off lease now.
I'd use the 175s to replace 150s & 158s and in turn release those for GWR. No additional clearance or training needs.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,151
Location
West Wiltshire
The 231s are there to replace 769s until the 756s come in. 150s and 158s won't be free for a while, the latter due to the Cambrian. 175s are the most likely in my eyes as they're slowly going off lease now.

Could it be 158s from East Midlands, released by 170s, released by new 196s in West Midlands. Perhaps formed 4 car (or 5car) fixed sets releasing the GWR 158s currently operating as single sets. Would avoid any compatibility issues.

The 175s would need more staff training as type is effectively new.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,639
Location
Hampshire
The 231s are there to replace 769s until the 756s come in. 150s and 158s won't be free for a while, the latter due to the Cambrian. 175s are the most likely in my eyes as they're slowly going off lease now.

As we've seen in the past though, nothing stopping say Porterbrook offering TfW in effect a peppercorn lease for the 769s allowing some of the 150s to be released first. That way, 150s go to GWR (a guaranteed home), 769s stay for a little longer (no guaranteed home), and Stadler works it's magic to get it's stock into service as rapidly as the can do. After all the 170s were supposed to be on a long lease and look what's happened to them!
 

Mitchell Hurd

On Moderation
Joined
28 Oct 2017
Messages
1,761
Interesting! Some GWR Oxford to London Paddington fasts diagrams are being run by a 6-car Turbo instead of a 5-car IET!
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,864
Location
Cambridge
Interesting! Some GWR Oxford to London Paddington fasts diagrams are being run by a 6-car Turbo instead of a 5-car IET!