• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Historic double track heritage railways

Status
Not open for further replies.

L+Y

Member
Joined
4 Jul 2011
Messages
502
Today the GCR makes much play of its status as the UK's (world's?) only double track heritage railway.

Which got me to wondering- how many of the UK's current preserved railways were once double tracked? A handful, or many of them? I know what's now the ELR certainly was originally double tracked throughout.

And were any lines, again aside from the GC, taken over from BR with a double track formation still down?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,531
Location
Northampton
Many would have been, although some may have been singled prior to closure. The Bluebell railway was Double track from Horsted Keynes to East Grinstead, although the line was lifted before they got the trackbed. The Sheffield Park-Horsted Keynes section was only ever single track but had been built for double track.
The Spa Valley Railway had originally been double track as well, although again track had been lifted before the heritage operation started.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,992
Location
Up the creek
The top end of the Paignton & Dartmouth and North Yorkshire Moors, and the Gloucestershire- Warwickshire. The last bit of the West Somerset, although that was latterly two single lines.
 

Magdalia

Established Member
Joined
1 Jan 2022
Messages
7,387
Location
The Fens
Today the GCR makes much play of its status as the UK's (world's?) only double track heritage railway.

Which got me to wondering- how many of the UK's current preserved railways were once double tracked? A handful, or many of them? I know what's now the ELR certainly was originally double tracked throughout.

And were any lines, again aside from the GC, taken over from BR with a double track formation still down?
Nene Valley Railway and Mid Norfolk Railway were both double track in BR days, I think the former up to closure to passengers in 1966, the latter singled in 1965. The Nene Valley Railway was possibly singled after closure to passengers but while still open for freight, I haven't found any pictures to confirm one way or the other.
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,919
Location
Devon
The Churnet Valley Railway as well maybe?
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,919
Location
Devon
Much of the infrastructure of the Severn Valley was constructed to allow for possible future expansion to double track and the Railway has a webpage illustrating that:

https://www.svrwiki.com/Double_track

Likewise the Mid Hants although it stayed single.
I guess parts of the Cambrian Railways Trust would be another, along with the GCRN and the Midland Railway Centre?
 

kje7812

Member
Joined
1 May 2018
Messages
652
Location
Kidderminster
The top end of the Paignton & Dartmouth and North Yorkshire Moors, and the Gloucestershire- Warwickshire. The last bit of the West Somerset, although that was latterly two single lines.
To exact, Minehead to Dunster and Bishop's Lydeard to Norton Fitzwarren
Much of the infrastructure of the Severn Valley was constructed to allow for possible future expansion to double track and the Railway has a webpage illustrating that:

https://www.svrwiki.com/Double_track
In addition, Bewdley was a junction station with the Severn Valley line roughly north-south (the original SVR was Hartlebury to Shrewsbury via Stourport), with the Kidderminster loop line to the east and the line to Tenbury Wells to the west. The Tenbury and Severn Valley lines ran in parallel for roughly 3/4 mile between Bewdley station and the divergence point (the 'Tenbury wall'). Bewdley itself remains doubletrack with north and south boxes and absolute block in use on the up and down mains (Platform 1 and 2 respectively).
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
To exact, Minehead to Dunster and Bishop's Lydeard to Norton Fitzwarren

Does anyone remember if the double track to Dunster was still there in the... say, late 70s? I can vaguely remember what might be a long siding, but also might be the second track.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,992
Location
Up the creek
Does anyone remember if the double track to Dunster was still there in the... say, late 70s? I can vaguely remember what might be a long siding, but also might be the second track.

The double-track from Dunster to Minehead remained in place and seemingly in use until BR closed the line in January 1971. Norton Fitzwarren-Bishops Lydeard was singled nearly a year earlier.

Source: Cooke’s diagrams, which don’t cover the preservation era.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,601
Location
Dunham/Bowdon
The Churnet Valley Railway as well maybe?
Yes. The Rudyard Lake Steam Railway is also built on the former Macclesfield-Uttoxeter line, which was originally planned as a main route between Manchester and Derby (and then London). It was therefore built as a double track line throughout, but became a backwater. The Knotty (the informal name for the North Staffordshire Railway) did try to promote its use for tourism to Rudyard Lake, but it closed as a through route pre-Beeching.

Peak Rail uses part of the former Midland double track mainline from London to Manchester.
 
Last edited:

61653 HTAFC

Veteran Member
Joined
18 Dec 2012
Messages
19,352
Location
Yorkshire
A slight variation on the theme, Shepley to Clayton West was built wide enough for double track as it was planned to extend to Barnsley via Kexborough and Darton. However this extension never happened and only a single standard gauge track was ever laid.

After closure in 1983 it reopened in the early 1990s as a narrow-gauge line. Plenty of room for double track if the owners wanted to build it, but it is single with several loops and will remain so.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,278
The double-track from Dunster to Minehead remained in place and seemingly in use until BR closed the line in January 1971. Norton Fitzwarren-Bishops Lydeard was singled nearly a year earlier.
It was done like this to close the signalbox at Minehead, part of the late-1960s 'efficiencies', which cannot have recouped their engineering costs before the line closed. A signalbox needed to be retained at the level crossing at Dunster, so the double track installed in the 1930s on the last leg to Minehead was made two single lines from there, leading to either side of the island platform, each with a loco run-round line controlled by a ground frame, which all allowed two trains at the terminus, some summer Saturday trains to the end being Hymek-hauled.

At the other end at the same time the line was singled in one section all the way from Silk Mill signalbox on the main line (another level crossing then, and thus had to be retained), using the old Up Relief to Norton, one of the double tracks to Lydeard, and on to Williton. Facing crossovers, normally a WR anathema, were installed at Silk Mill to enable down Minehead trains to cross over to the newly singled line. Various other passing loops were taken out as well. All the works were done to the Western Region "rationalisation" approach of the era, which was to rip up every unwanted track and demolish every unused building down to ground level, and spread vast quantities of fresh ballast over the liberated ground.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,992
Location
Up the creek
It was done like this to close the signalbox at Minehead, part of the late-1960s 'efficiencies', which cannot have recouped their engineering costs before the line closed. A signalbox needed to be retained at the level crossing at Dunster, so the double track installed in the 1930s on the last leg to Minehead was made two single lines from there, leading to either side of the island platform, each with a loco run-round line controlled by a ground frame, which all allowed two trains at the terminus, some summer Saturday trains to the end being Hymek-hauled.

At the other end at the same time the line was singled in one section all the way from Silk Mill signalbox on the main line (another level crossing then, and thus had to be retained), using the old Up Relief to Norton, one of the double tracks to Lydeard, and on to Williton. Facing crossovers, normally a WR anathema, were installed at Silk Mill to enable down Minehead trains to cross over to the newly singled line. Various other passing loops were taken out as well. All the works were done to the Western Region "rationalisation" approach of the era, which was to rip up every unwanted track and demolish every unused building down to ground level, and spread vast quantities of fresh ballast over the liberated ground.

The box at Minehead closed and the double line to Dunster became two singles on 27-03-1966, so they got five summer seasons out of it. The singling between Norton Fitzwarren and Bishops Lydeard coincided with the closure of Norton box.
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,919
Location
Devon
There’s a lost heritage ex double line railway near me - The Dartmoor Railway. Also I believe the Avon Valley Railway was originally a double line route.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,661
Location
Nottingham
There’s a lost heritage ex double line railway near me - The Dartmoor Railway. Also I believe the Avon Valley Railway was originally a double line route.
Yes, this was the Midland route into Bath. Part of the Bristol and Bath Cycle Path occupies the line of the second track.
 

Taunton

Veteran Member
Joined
1 Aug 2013
Messages
12,278
How about part 2 of my query - were there any?
You will have to decide yourself whether the two-track section Dunster to Minehead, which I think was left as was when the line was sold, qualifies as double track, on account of the signalling arrangements described above - which I think were wholly removed after closure, but the two tracks remained.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,955
Location
Airedale
How about part 2 of my query - were there any?
What was the status of Paignton to Goodrington Sands mentioned upthread? Had it already become 2 single lines (1 passenger, 1 to sidings)?
Photo on Cornwall Railways site shows the line through the halt single in summer 73, so the work was probably done at takeover. GS box remained open for some years after but only on the BR side.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
12,992
Location
Up the creek
What was the status of Paignton to Goodrington Sands mentioned upthread? Had it already become 2 single lines (1 passenger, 1 to sidings)?
Photo on Cornwall Railways site shows the line through the halt single in summer 73, so the work was probably done at takeover. GS box remained open for some years after but only on the BR side.

Paignton station to Goodrington Sands was double from 1928 until 1972. Following the sale to the Dart Valley Railway, the date of which I do not know, the section was modified to two single lines in early November 1972. Goodrington box closed at the start of the work.

Source: Cooke’s diagrams.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,828
A slight variation on the theme, Shepley to Clayton West was built wide enough for double track as it was planned to extend to Barnsley via Kexborough and Darton. However this extension never happened and only a single standard gauge track was ever laid.

After closure in 1983 it reopened in the early 1990s as a narrow-gauge line. Plenty of room for double track if the owners wanted to build it, but it is single with several loops and will remain so.

There's a surprising number that were built to allow double track, even the likes of the KWVR and the LNWR Birstall branch. The Leeds & Selby went part way to a quadruple track railway. Land was acquired for a 4 track line, but where only double was needed any iron bridges over the line were usually constructed to 4 track standard, even when the cutting the railway was in was only cut for two tracks.
 

Western 52

Established Member
Joined
19 Jun 2020
Messages
1,672
Location
Burry Port
Not sure if you want to count the Manx Electric Railway here? Double line all the way. Plus Snaefell of course.
 

steamybrian

Established Member
Joined
26 Nov 2010
Messages
2,001
Location
Kent
The Spa Valley Railway had originally been double track as well, although again track had been lifted before the heritage operation started.
The Spa Valley Railway are the only heritage railway to buy double track in situ.
Because the track was in poor condition the decision was taken to use the best bits from both lines to make one good single line. Sections of the second track survive as sidings of the passing loop at Groombridge.

Do you include the Romney, Hythe and Dymchurch Railway is double from Hythe to New Romney. It was double to Dungeness but was singled when it was reopened after WW2
 
Last edited:

341o2

Established Member
Joined
17 Oct 2011
Messages
2,014
Dartmoor line. The section between Okehampton and Crediton was singled in 1971
note this was mentioned #17
 
Last edited:
Status
Not open for further replies.

Top