I was dismayed to read that part of the planning to replace the Castle class HSTs on the Penzance - Cardiff route will be switching 158s from the Portsmouth - Cardiff route.
Although many services are diagrammed for 5 coaches (165+166), in practise anything from 2,3,4 and 5 cars are actually provided. I have been on 3 car trains where there is excessive dwell time at stations where passengers attempt to cram into a train that is already full of standing passengers or attempt to fight their way through the crowd to alight. I have also been on trains where passengers have been unable to board and have been left behind.
The service seems prone to cancellations due to issues with rolling stock. Two recent examples:
On 15/12 the 0721 Portsmouth - Cardiff was diverted between Fareham and Southampton via Eastleigh. It was cancelled at Southampton due to a problem with the traction equipment (MD).
The following 0823 Portsmouth - Cardiff was also terminated at Southampton. I understand that unit was then used to drag the failed unit somewhere for attention.
Today (29/12) the 0810 Southampton - Cardiff was cancelled due to a problem with the train (M8). The 1123 Portsmouth - Cardiff was also cancelled. According to the displays at Southampton, this was due to the lack of serviceable trains.
Clearly, this service is struggling. I would be interested to know how many days in 2022 every train scheduled on this route has actually run from end to end of its planned journey.
Switching 158 units away from this route will only lead to an even worse service.
Although many services are diagrammed for 5 coaches (165+166), in practise anything from 2,3,4 and 5 cars are actually provided. I have been on 3 car trains where there is excessive dwell time at stations where passengers attempt to cram into a train that is already full of standing passengers or attempt to fight their way through the crowd to alight. I have also been on trains where passengers have been unable to board and have been left behind.
The service seems prone to cancellations due to issues with rolling stock. Two recent examples:
On 15/12 the 0721 Portsmouth - Cardiff was diverted between Fareham and Southampton via Eastleigh. It was cancelled at Southampton due to a problem with the traction equipment (MD).
The following 0823 Portsmouth - Cardiff was also terminated at Southampton. I understand that unit was then used to drag the failed unit somewhere for attention.
Today (29/12) the 0810 Southampton - Cardiff was cancelled due to a problem with the train (M8). The 1123 Portsmouth - Cardiff was also cancelled. According to the displays at Southampton, this was due to the lack of serviceable trains.
Clearly, this service is struggling. I would be interested to know how many days in 2022 every train scheduled on this route has actually run from end to end of its planned journey.
Switching 158 units away from this route will only lead to an even worse service.