Never, is the most likely answer, based on the comments above.Guys, anyone know when will the GWR Class 769s be in service
Never, is the most likely answer, based on the comments above.Guys, anyone know when will the GWR Class 769s be in service
Never. See the last few pages of posts, and the thread titleGuys, anyone know when will the GWR Class 769s be in service

They probably need to order new bi-modes, e.g. Bi-Mode AventraNever. See the last few pages of posts, and the thread title
Edit- what JonathanH said.
Not until 2028, once they have considered the requirements for complete replacement of the 150/158/165/166 fleet. There is publicly announced project which GWR are working on to determine this.They probably need to order new bi-modes, e.g. Bi-Mode Aventra
They probably need to order new bi-modes, e.g. Bi-Mode Aventra
I would suggest they need to order in 2023 or 2024 as new trains often take 3-5 years, if need a fleet from 2028.Not until 2028, once they have considered the requirements for complete replacement of the 150/158/165/166 fleet. There is publicly announced project which GWR are working on to determine this.
Yes, potentially, but equally they aren't going to be ordered tomorrow and given the need to replace 150, 158, 165 and 166 with one basic platform, it isn't necessarily off the shelf either. Neither does it need to be done as a knee jerk reaction to the 769 project being cancelled.Waiting until 2028 to order them is daft
"Operation Churchward" looks at future rolling stock requirements
Although no formal notice has yet been published, GWR is looking at its medium and longer-term rolling stock requirements for local and regional trains, given that much of its DMU fleet is now more than 30 years old. According to Managing Director Mark Hopwood, speaking at an RCTS members weekend in Reading in late October, "Operation Churchward" sees replacement potentially in the shape of one standard design of unit with a common type of driving cab, probably with different local and longer distance interiors. Capable of running on AC, DC and diesel, with a view to conversion of the latter to battery in due course, the design would be ideal for the Thames Valley and Devon and Cornwall branches and potentially as replacement for everything not IET or Class 387 operated. Further details will be made available in due course.
Sounds good. I would say something like the Class 196/197 would be the best possible option. A mix of 2/3/4 & maybe 5 cars for Portsmouth - Cardiff? Although I do wonder if the leases are cheap enough GWR might look at replacing the 387s as well?Not until 2028, once they have considered the requirements for complete replacement of the 150/158/165/166 fleet. There is publicly announced project which GWR are working on to determine this.
Thats because we keep starting from scratch rather than adopting designs already approved and issuing follow on ordersI would suggest they need to order in 2023 or 2024 as new trains often take 3-5 years, if need a fleet from 2028.
So would they have made a profit from these units or did issues and delays eat up any profit?The fact they had never entered service so far is down to the Union not signing off the cab mods to allow driver training to start. Once driver training had been commenced there would have been the 6 units at Reading (the current 3 + the 3 at Oxford) with 3 in service daily. The three weekly runs were purely to keep the driver managers / trainers competency up. The units were working (mostly)!
I believe this had actually been signed off and driver training was due to commence but the IA put paid to that.
see above for the “test run”. As the runs are only for competency retention, they probably won’t, I’m sure the Driver Managers have better things to do but you never know! Hopefully the 769s will depart for Long Marston (or elsewhere) sooner rather than later and not take up valuable siding space.
The order has not been cancelled, it was fulfilled - GWR ordered 19 and received 19. The lease is not being renewed when it expires next year.
If CAF is the best possible option then we're in trouble. A large fleet of level-boarding FLIRTs is the best answer, like Greater Anglia have.I would say something like the Class 196/197 would be the best possible option.
Are you asking about Porterbrook?So would they have made a profit from these units or did issues and delays eat up any profit?
YesAre you asking about Porterbrook?
I suggest that further discussion should really be here https://www.railforums.co.uk/thread...ure-local-regional-fleet.236368/#post-5822075Sounds good. I would say something like the Class 196/197 would be the best possible option. A mix of 2/3/4 & maybe 5 cars for Portsmouth - Cardiff? Although I do wonder if the leases are cheap enough GWR might look at replacing the 387s as well?
They can order Quadruple-mode Aventra(OHLE+3rd rail+Diesel+Battery) and immediately cancel the 769s order just like ÖBB and STA when they cancel the Talent 3 order and instead order Siemens Desiro/Alstom CoradiaNot until 2028, once they have considered the requirements for complete replacement of the 150/158/165/166 fleet. There is publicly announced project which GWR are working on to determine this.
They can order Quadruple-mode Aventra(OHLE+3rd rail+Diesel+Battery) and immediately cancel the 769s order just like ÖBB and STA when they cancel the Talent 3 order and instead order Siemens Desiro/Alstom CoradiaNot until 2028, once they have considered the requirements for complete replacement of the 150/158/165/166 fleet. There is publicly announced project which GWR are working on to determine this.
This is pretty different to the Talent 3 which had major problems with the contract ended, Porterbrook and GWR/DfT's contract for the 769s ends in April 2023, the lease has run its course without being cancelled or extended.They can order Quadruple-mode Aventra(OHLE+3rd rail+Diesel+Battery) and immediately cancel the 769s order just like ÖBB and STA when they cancel the Talent 3 order and instead order Siemens Desiro/Alstom Coradia
== Doublepost prevention - post automatically merged: ==
They can order Quadruple-mode Aventra(OHLE+3rd rail+Diesel+Battery) and immediately cancel the 769s order just like ÖBB and STA when they cancel the Talent 3 order and instead order Siemens Desiro/Alstom Coradia
I heavily doubt quadruple mode would be possible just in the space required underneath to fit everything in, nor would it be useful for North Downs which could be done end to end by a battery unit. Fitting either GWR 387s or 379s with batteries (379s has been done before) would be a better solution.
As I said in a previous post GWR have ruled out fitting batteries to the 387s, Bedwyn Passenger Group raised this idea to get Bedwyn - Paddington directs back. Quote : " 1. There are too many issues with adding batteries to the 387 fleet to enable them to serve Bedwyn. Therefore we should forget this option. " https://pennypost.org.uk/2021/05/me...roup-about-changes-to-rail-services-may-2021/Fitting either GWR 387s or 379s with batteries (379s has been done before) would be a better solution.
Thanks for this, I saw in a previous post but couldn't find any further information on it.As I said in a previous post GWR have ruled out fitting batteries to the 387s, Bedwyn Passenger Group raised this idea to get Bedwyn - Paddington directs back. Quote : " 1. There are too many issues with adding batteries to the 387 fleet to enable them to serve Bedwyn. Therefore we should forget this option. " https://pennypost.org.uk/2021/05/me...roup-about-changes-to-rail-services-may-2021/
Plenty of engineering consultants (TOC and Rosco) will have trousered money on the project, most of it coming from the DfT in one form or another.I wouldn’t have a clue on the financial aspects, probably the only people who have profited (or will do) are the lawyers!
Thanks a lot mateReading TCD: 935, 938, 943
Oxford UCS: 930, 949, 959
All the rest are in store at Long Marston.
Edit: 927 is showing as back at Long Marston.

These days - probably yes. Timings become slacker and slacker to account for anything and everything. The spiral of decline tightens and steepens.Does a driver’s “pee break” halfway through a 90 minute commuter service really constitute a reason for not tightening the timetable![]()
When you have been backwards and forwards on a short commuter run with the same unit for 5 hours with minimum turn around time, then any chance for a comfort break is most usefulThese days - probably yes. Timings become slacker and slacker to account for anything and everything. The spiral of decline tightens and steepens.
Doesn’t sound too unreasonable to me. Some on here would have you not leave the cab for 10 hours. I do sympathise.When you have been backwards and forwards on a short commuter run with the same unit for 5 hours with minimum turn around time, then any chance for a comfort break is most useful
Any time a driver needs it ( at a station of course ) .Genuine question, when are you allowed to leave the cab for an emergency loo break?
Just wondering if you were allowed to leave a train in service full of passengers that’s all, no other reason.Any time a driver needs it ( at a station of course ) .
Delay ?
So what .
Not all trains have toilets and when they do they aren't necessarily working!Doesn’t sound too unreasonable to me. Some on here would have you not leave the cab for 10 hours. I do sympathise.
On the other hand, you do drag at least one toilet around with you all day so don’t have far to walk
Genuine question, when are you allowed to leave the cab for an emergency loo break?
I don’t think GWR were responsible for the decision to cancel it, it seems more the Government who ultimately made the decision not to renew the lease.It’s a real shame that a project can be cancelled like this when so much money has already gone into it, they would’ve been far “greener” than the 165s on the Gatwick trains but GWR decided to cancel this even though money had been spent.