bussnapperwm

Established Member
Joined
18 May 2014
Messages
1,527
With the London North Western 350/2s being due to be replaced soon, what do people think is next for them?

Personally I think that the middle cars could be ideal for moving into either the 350/1s to make them 5 car units, or moving into the former 450/5s to make them 5 car units. There again, could they have shoes fitted and converted to become extra units for South Western Railway (maybe to become a subclass of the 450?)?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,337
With the London North Western 350/2s being due to be replaced soon, what do people think is next for them?
Storage at Long Marston until they are needed anywhere else.

It needs to accepted that any off lease trains do not have an easy path back to use.

Personally I think that the middle cars could be ideal for moving into either the 350/1s to make them 5 car units, or moving into the former 450/5s to make them 5 car units. There again, could they have shoes fitted and converted to become extra units for South Western Railway (maybe to become a subclass of the 450?)?
As for conversion programmes, every single one seems to have had its issues. The money just isn't there for more conversion programme mistakes.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,275
Well, coming up with a new proposal will be challenging, once we consider previous suggestions during the last 2 years.

Therefore I’d stick with storage as the likeliest option. Probability of any form of conversion will be incredibly low.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,337
Well, coming up with a new proposal will be challenging, once we consider previous suggestions during the last 2 years.

Therefore I’d stick with storage as the likeliest option. Probability of any form of conversion will be incredibly low.
Indeed, unlike the 379s there has never been a credible indication put forward of what the 350/2s would be doing when released by LNR.
 

Brubulus

Member
Joined
13 Oct 2022
Messages
974
Location
Cambridge
Sent to GWR to allow their 387s to be sent to SE. Or converted to 3rd rail and directly sent to SE, conversion is complex so the former is probably the better option.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,337
Sent to GWR to allow their 387s to be sent to SE. Or converted to 3rd rail and directly sent to SE, conversion is complex so the former is probably the better option.
I think the barrier is that 387s are unsuitable for the SE metro work without a substantial rebuild.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
Reformed to 3 car units so that Scotrail can use them as 6 cars to replace 318s and 320s. That would be the least costliest conversion out there. They could also be shortened and replace 323s on Northern but they seem happy with those.

Other than that storage, and after a couple of years, scrap if nobody wants them. If the DafT was sane they would encourage use of these units as opposed to replacements but Transport Scotland might huff at that and demand more bulk funding for shiny new trains.

Leasing costs with the ROSCO Porterbrook would need to be renegotiated, like the 379s procured at around the same time, they are leased at pre 2009 levels.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,333
Location
Nottingham
Other than that storage, and after a couple of years, scrap if nobody wants them.
Much as it pains me to say it, I think they could be used by EMR for services to Leicester, as soon as the wires are extended the four miles past Wigston. It would make much more financial sense than ordering additional 810s to add any capacity on the MML.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,400
Location
"Marston Vale mafia"
Much as it pains me to say it, I think they could be used by EMR for services to Leicester, as soon as the wires are extended the four miles past Wigston. It would make much more financial sense than ordering additional 810s to add any capacity on the MML.

If the 360s are that knackered, use them to replace those (bonus through corridor) and scrap the 360s.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,057
Location
Reston City Centre
Are we in danger of running out of sidings, given the apparent need to store hundreds (thousands?) of midlife EMUs in them?

Will someone have to apply for planning permission to build more sidings to accommodate yet more fleets, because the Government are too tight to fund capacity increases but also too frit to take the tough decisions to be honest about the reduced capacity in the future?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,400
Location
"Marston Vale mafia"
Are we in danger of running out of sidings, given the apparent need to store hundreds (thousands?) of midlife EMUs in them?

Will someone have to apply for planning permission to build more sidings to accommodate yet more fleets, because the Government are too tight to fund capacity increases but also too frit to take the tough decisions to be honest about the reduced capacity in the future?

Shove them on the branch lines you want to close? :D

But in all seriousness it's down to the ROSCOs who own them whether to keep or scrap.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,337
Are we in danger of running out of sidings, given the apparent need to store hundreds (thousands?) of midlife EMUs in them?
Porterbrook are likely to have space at Long Marston for 37 350s once the 769s and other redundant rolling stock goes for scrap.
 

778

Member
Joined
4 May 2020
Messages
700
Location
Hemel Hempstead
With the London North Western 350/2s being due to be replaced soon, what do people think is next for them?

Personally I think that the middle cars could be ideal for moving into either the 350/1s to make them 5 car units, or moving into the former 450/5s to make them 5 car units. There again, could they have shoes fitted and converted to become extra units for South Western Railway (maybe to become a subclass of the 450?)?
Given how long it is taking to get the 730s into service, I don't think they will be gone for quite some time yet. I think it will be at least 2 years until they are replaced, probably even longer than that.
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
It isnt perfect for the work, but they coped on TL... its not like they've got large first class sections (like 379s) or no 3rd rail (like 350/2s)

Thameslink also is a large, outer suburban network which the 387s were ideal for. They were well suited to Bedford - Brighton services, not so good for all stoppers from Luton-Sutton.

The issue is Thameslink as a single network has more than one different service type. Look over at the GN or WCML there has always been different stock on the inner suburban (Moorgate / Watford DC) to the outers. Thameslink uses one unit type to cover everything.
 

Chiltern006

Member
Joined
3 Oct 2018
Messages
809
what if they went to GN, and their 387s went down south. would make GN fully siemens then
 

David Goddard

Established Member
Joined
8 Aug 2011
Messages
1,515
Location
Ely
what if they went to GN, and their 387s went down south. would make GN fully siemens then
Well thats quite credible, and the fleet size fits nicely as well. Single manufacturer stock at depots must help in the long run (even if ony a few parts are similar). However would advocate that the 3+2 is changed to 2+2 (assume that can be done by just removing the outer seats, lets not get bogged down in dft permission to do it etc.
The GN livery would suit these too, as seen on a fine model layout of Kings Lynn that someone I follow on facebook has built, and has used Cl350 models vinyled into FCC and GN liveries.
387s then move South for Brighton Main Line, unless of course by that time the Western wires have been extended and GWR need more for Oxford, Basingstoke and more.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,639
Location
Hampshire
I know I've said it before, but I still feel the best option would be to simply do a deal with LNWR / Siemens / Porterbrook & Angel, refurbish the 350/2s to 350/1 standards, keep the /2s on the WCML and send the 350/1s "back" to SWR. SWR / Porterbrook can then bin off the 458 conversion idea, giving SWR a predominately Siemens / Alstom EMU Fleet and keeping the Portsmouth line users happy in the process. Of course, there has been suggestions that Siemens wouldn't be able to cope regarding the depot space, but surely Bournemouth, a depot which has looked after the 444s for the best part of 20 years, could cope - or perhaps become an Siemens depot too?

Of course, Money, Passenger Numbers, Porterbrook & Angel are the usual stumbling points and why such a plan would be unlikely to come about unfortunately.
 

BurtonM

Member
Joined
3 Feb 2014
Messages
981
Location
Manchester
Finish electrifying to Stalybridge and have them replace 2x150s on Southport-Stalybridge, and 323s on Hadfield :D
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,818
I know I've said it before, but I still feel the best option would be to simply do a deal with LNWR / Siemens / Porterbrook & Angel, refurbish the 350/2s to 350/1 standards, keep the /2s on the WCML and send the 350/1s "back" to SWR. SWR / Porterbrook can then bin off the 458 conversion idea, giving SWR a predominately Siemens / Alstom EMU Fleet and keeping the Portsmouth line users happy in the process. Of course, there has been suggestions that Siemens wouldn't be able to cope regarding the depot space, but surely Bournemouth, a depot which has looked after the 444s for the best part of 20 years, could cope - or perhaps become an Siemens depot too?

Of course, Money, Passenger Numbers, Porterbrook & Angel are the usual stumbling points and why such a plan would be unlikely to come about unfortunately.
SWR don’t need them, though, once the 701s enter service. That’s why the 458 conversion is paused.
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,639
Location
Hampshire
SWR don’t need them, though, once the 701s enter service. That’s why the 458 conversion is paused.
That's why I included passenger numbers in the usual caveats. Of course SWR also has itself to blame for over ordering 701s in the first place - unless, Rock Rail / SWR can cut the order short depending on how far Alstom are in the production line.

I would suggest it's less of a pie in the sky idea than some suggested though, the 350/1s still retaining their duel voltage capacity even if it hasn't been used since the Southern / LM hire finished.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,181
That's why I included passenger numbers in the usual caveats. Of course SWR also has itself to blame for over ordering 701s in the first place - unless, Rock Rail / SWR can cut the order short depending on how far Alstom are in the production line.
My understanding of the situation was that shifting travel patterns post-COVID has resulted in less pronounced peaks.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,818
That's why I included passenger numbers in the usual caveats. Of course SWR also has itself to blame for over ordering 701s in the first place - unless, Rock Rail / SWR can cut the order short depending on how far Alstom are in the production line.
I really don’t understand why Alstom haven’t had partial termination notices for the 701s and 720s. The delivery delays are significant enough that that ought to be a reasonable penalty.
 