• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Train delayed due to an error having been made

Status
Not open for further replies.

M60lad

Established Member
Joined
31 May 2011
Messages
1,553
Does anybody know what the above actually means? It seems 09:42 Manchester-Sheffield service last Friday terminated at Chinley for this exact reason according to Real Time Trains:


Whatever it was it delayed services to/from Sheffield in the area for over an hour including 10:18 TPE service from Manchester Piccadilly-Cleethorpes which ended up being delayed and eventually left Stockport 66 late.

Am I right in thinking that it could have something to do with the driver taking the wrong train and not realising and if so how often does this sort of thing happen on the railways?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,843
Am I right in thinking that it could have something to do with the driver taking the wrong train
No.

A freight train (4H89) took a wrong route and services had to be stopped while it was dealt with. There was no error made with 2S78.
 

MrB

Member
Joined
3 Jan 2016
Messages
389
Location
London
OC attribution code meaning - Signaller including mis-routing (not ERTM /ETCS related)
 

rower40

Member
Joined
1 Jan 2008
Messages
577
I use the word "routeing" a lot, but OED says that the spelling "routing" is an acceptable alternative. The latter can also be the present participle of "to rout", whereas the former cannot.
 
Status
Not open for further replies.

Top