One thing that comes up quite a bit is the slowness of either route from London to Dorking, as the services are forced to call at most or all stations due to pathing constraints over double track.
I wonder whether there could, in the future, be scope for electrifying Reigate-Guildford and running through services from Victoria or London Bridge to Guildford via Redhill and Dorking?
A look at today's times reveals that Victoria to Dorking via Redhill on a theoretical through train could be done in as little as 45 mins, versus 57 for the existing slow direct service. 17 mins VIC-East Croydon, 1 min stop (=18), 15 mins to Redhill calling at Purley (=33) and then 12 to Reigate and Dorking Deepdene (=45). If London Bridge was the origin (with a Norwood Junction stop) this could be cut further to 43. Indeed, the fastest possible journey from London to Dorking today seems to be from London Bridge with one change at Redhill.
The service could be an extension of one train per hour from London to Reigate, with the Coulsdon and Merstham stops removed and transferred e.g. to slower Thameslinks, i.e. not the Brightons.
Such a service could also provide the local station service, e.g. 1tp2h calling at Betchworth and the other at Gomshall and Chilworth, with all calling at Shalford. So the Betchworth stoppers would be a couple of mins slower but even still, the London-Dorking journey would still be faster than the existing one and perhaps with EMUs the times would be faster in any case.
It would also provide 1tph through service from Guildford to East Croydon, not sure how significant a flow that is.
Meanwhile the Guildford-Reading section could be electrified, and gain a half-hourly stopping shuttle service (half-hourly due to the high population density in this area) and worked by the "South Western" operator as it's clearly in its patch. Would also permit inter-working with Guildford-Aldershot if that was the most efficient way of doing it.
The Reading-Gatwick would meanwhile remain as an hourly service, run by third-rail EMUs (either South Western or Southern ones, depending on who operates it).
I wonder whether there could, in the future, be scope for electrifying Reigate-Guildford and running through services from Victoria or London Bridge to Guildford via Redhill and Dorking?
A look at today's times reveals that Victoria to Dorking via Redhill on a theoretical through train could be done in as little as 45 mins, versus 57 for the existing slow direct service. 17 mins VIC-East Croydon, 1 min stop (=18), 15 mins to Redhill calling at Purley (=33) and then 12 to Reigate and Dorking Deepdene (=45). If London Bridge was the origin (with a Norwood Junction stop) this could be cut further to 43. Indeed, the fastest possible journey from London to Dorking today seems to be from London Bridge with one change at Redhill.
The service could be an extension of one train per hour from London to Reigate, with the Coulsdon and Merstham stops removed and transferred e.g. to slower Thameslinks, i.e. not the Brightons.
Such a service could also provide the local station service, e.g. 1tp2h calling at Betchworth and the other at Gomshall and Chilworth, with all calling at Shalford. So the Betchworth stoppers would be a couple of mins slower but even still, the London-Dorking journey would still be faster than the existing one and perhaps with EMUs the times would be faster in any case.
It would also provide 1tph through service from Guildford to East Croydon, not sure how significant a flow that is.
Meanwhile the Guildford-Reading section could be electrified, and gain a half-hourly stopping shuttle service (half-hourly due to the high population density in this area) and worked by the "South Western" operator as it's clearly in its patch. Would also permit inter-working with Guildford-Aldershot if that was the most efficient way of doing it.
The Reading-Gatwick would meanwhile remain as an hourly service, run by third-rail EMUs (either South Western or Southern ones, depending on who operates it).
