Periodically the Brighton Main line is closed for Engineering works. When this happens the usual diversion takes place from Three Bridges to Horsham, Arun Valley to Littlehampton, reverse and Coastway to Brighton. I know it is the "long way round" but when it happens, delighted passengers from Horsham southwards take advantage of the through service to Brighton.

Question for the timetable and route experts: how feasible would it be for the Victoria - Dorking - Horsham services to regularly continue to Brighton via this route?

I recall at the time of several franchise renewals proposals for an Arundel chord were made but they are soon quietly forgotten on grounds of no capacity or funding.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,602
Location
Northampton
Question for the timetable and route experts: how feasible would it be for the Victoria - Dorking - Horsham services to regularly continue to Brighton via this route?

I recall at the time of several franchise renewals proposals for an Arundel chord were made but they are soon quietly forgotten on grounds of no capacity or funding.
You've answered your own question, unfortunately. There's no capacity if the full service is running through Worthing. Also it would require many more units and Drivers, and pose a major performance risk.
 

PGAT

Established Member
Joined
13 Apr 2022
Messages
2,132
Location
Selhurst
Going via Dorking would leave out all the East Croydon and Gatwick passengers who make up the bulk of people travelling to Brighton
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,294
Location
Bolton
The journey time from Horsham to Brighton via Littlehampton is very poor. It's always going to be quicker to change trains at Three Bridges - except of course during the engineering works which prompt the temporary diversion.

The typical journey time via the A23 of 45 - 55 minutes is also substantially faster.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
If only the Steyning Line had stayed open!

Here here !

== Doublepost prevention - post automatically merged: ==

Solves precisely 0 of the actual problems - Stock, Crew and Capacity at the Brighton/Hove end.

It would solve the underlying problems of not having a diversionary route and lack of access to parts of Sussex, but you're correct - it wouldn't solve the superficial problems caused by the way the railway's managed.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,602
Location
Northampton
It would solve the underlying problems of not having a diversionary route and lack of access to parts of Sussex, but you're correct - it wouldn't solve the superficial problems caused by the way the railway's managed.
The OP is specifically asking about extensions in normal service. The whole premise of the thread is that there IS a diversionary route for West Sussex.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,374
Location
Yorks
The OP is specifically asking about extensions in normal service. The whole premise of the thread is that there IS a diversionary route for West Sussex.

@SussexSeagull pointed out that the Steyning line would have been very useful as a diversion, which is 100% correct.
 

SussexSeagull

Member
Joined
13 Aug 2021
Messages
208
Location
Worthing
If there were still direct Horsham to Brighton trains there wouldn't be a question of having to extend other services to do the same.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,602
Location
Northampton
If there were still direct Horsham to Brighton trains there wouldn't be a question of having to extend other services to do the same.
This is true, but would direct services have survived? Capacity at Horsham and between Brighton and Shoreham was, pre-covid, under extreme pressure and the dominant flows are Horsham to London and Brighton along the coast. I could easily have seen the Steyning line being closed in the early 80s even if it had survived beyond Beeching.

But 'what if the steyning line had survived' would be a different thread.
 

grove

Member
Joined
22 Aug 2014
Messages
83
The OP is specifically asking about extensions in normal service. The whole premise of the thread is that there IS a diversionary route for West Sussex.
Absolutely, this was for regular, normal operation. Aside from the Steyning route, which I too see as a sad loss, my thoughts were that the track is there today to run this type of service pattern and maybe the rolling stock, paths and crews are there too if the existing services are 'repurposed'.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,350
If service patterns are a zero sum game then it is hard to see how running Victoria - Sutton - Dorking - Horsham - Littlehampton - Worthing - Brighton trumps the current service the Arun Valley and West Coastway gets.

Brighton to Portsmouth / Southampton and the Arun Valley stopper running via East Croydon and Gatwick Airport seems more useful in the grand scheme of things. There isn't rolling stock or revenue support to run additional services.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,602
Location
Northampton
Absolutely, this was for regular, normal operation. Aside from the Steyning route, which I too see as a sad loss, my thoughts were that the track is there today to run this type of service pattern and maybe the rolling stock, paths and crews are there too if the existing services are 'repurposed'.
Unfortunately, the rolling stock and paths are not there, and so you would need to be cancelling other trains. I struggle to see any Brighton-based trains you could justify removing to give over to Horsham via Littlehampton.
 

SussexSeagull

Member
Joined
13 Aug 2021
Messages
208
Location
Worthing
This is true, but would direct services have survived? Capacity at Horsham and between Brighton and Shoreham was, pre-covid, under extreme pressure and the dominant flows are Horsham to London and Brighton along the coast. I could easily have seen the Steyning line being closed in the early 80s even if it had survived beyond Beeching.

But 'what if the steyning line had survived' would be a different thread.
Fair comment. It was only a throwaway remark.
 

Peregrine 4903

Established Member
Joined
18 Aug 2019
Messages
1,518
Location
London
Yeah the fact you only have 2 Platforms at the Brighton end is the biggest issue, well you have 3 but one is a 4 car only for West Coastway and thatis if its not being used by BML services. Plus squeezing trains through Arundel Junction can be really quite difficult as well.
 