It has occurred to me that the south WCML will from Dec move to an almost all 8 car timetable. 8.350 (160m) seems very much a sweet spot at most times of day, and they appear to be using peak extras rather than 12 car trains to add capacity where needed.
Should the 730 order therefore be modified to 7 car units? (168m)? Or maybe 8 car (192m)? As things stand the options will be 5 car (120m, insufficient for most trains) or 10 car (240m, excessive for most trains)?
What they have on order seems incongruous unless they are going to use a 5 and a 3 (with the WMR units) to make 8?
Should the 730 order therefore be modified to 7 car units? (168m)? Or maybe 8 car (192m)? As things stand the options will be 5 car (120m, insufficient for most trains) or 10 car (240m, excessive for most trains)?
What they have on order seems incongruous unless they are going to use a 5 and a 3 (with the WMR units) to make 8?