Dear Mr Sunak,
If the current fiscal crisis it is vitally important to reduce government spending, whilst still providing the investment in transport infrastructure that the county desperately needs. This proposal offers:
The MML already has overhead line electrification (OHLE) from London to Kettering. This is currently being extended to Wigston, just south of Leicester. A further 80 miles of route are still to be electrified. The most problematic sections are: listed station buildings close above the tracks atSheffield Leicester and Nottingham: the Derwent Valley, a World Heritage Site; and future changes to track layout necessary south of East Midlands Parkway (where HS2 will join the MML), and south of Leicester station, where additional capacity is required.
The class 810 trains on order for this route (part of the Hitachi AT-300 family) are bimodes, using both OHLE and four diesel engines in each five-car unit. Apart from diversionary routes and depot use, these engines will become redundant when and if the line is fully electrified.
Hitachi are currently developing a battery version of their class800 802 train, closely related to the 810, for possible use on the GWR route from London to Penzance, as shown in the Hitachi graphic:

PROPOSAL
1. Further MML electrification should be funded only for two sections: firstly Sheffield-Chesterfield; and then Derby-East Midlands Parkway. These would save electrifyng two thirds of the remaining route miles but would still utilise the Grid Supply points already planned at Ratcliffe-on-Soar and at Chesterfield. This avoids all the problematic areas listed above.
2. Ask Hitachi to quote for supplying battery versions of the 810 trains, instead of diesel, starting with the second half of the fleet.
3. When the BEMUs are delivered, swap over two of the new battery units with two of the diesels in the first half of the fleet to create a uniform fleet of tri-mode 810s with two diesel engines and two battery packs in each.
4. Wire platforms 6 and 7 of Nottingham station, to allow batteries to be recharged there, fed by either a static frequency converter (SFC) from the local supply, or a 25kV cable laid along the side of the track from Kegworth.
ANALYSIS
We assume that an 810 tri-mode would have 90km battery range and 10-15 min recharging time, the same as the Hitachi AT200 Regional Battery Train, as shown in this Hitachi graphic:

A 55-mile range would be enough to comfortably bridge the 25-mile gaps between Wigston and EMD; and between Derby and Chesterfield.
The proposed wiring would also allow the use of BEMUs on many other routes in the region, including Liverpool-Nottingham (biggest gap 30 miles); Leeds-Nottingham (34 miles); Crewe-Newark (34 miles); Matlock-Nottingham (17 miles x2); and many local services around Sheffield. All with no further wiring needed.
And if it turns out that the battery conversion of the 810s is too expensive or not practical, they can always use the diesel engines as delivered instead, while a future administration could authorise the remaining OHLE on the MML when public finances improve.
Yours sincerely,
A bright new graduate entrant in the Department for Transport.
If the current fiscal crisis it is vitally important to reduce government spending, whilst still providing the investment in transport infrastructure that the county desperately needs. This proposal offers:
- A saving of half the capital cost of the fully electrifying the Midland Mainline (MML), i.e. a saving of around £500M.
- Allow electrification to be delivered in half the time
- Immediate investment in a Northern Powerhouse city, with its Red Wall constituencies
- Avoids electrifying known high cost or problematic locations.
The MML already has overhead line electrification (OHLE) from London to Kettering. This is currently being extended to Wigston, just south of Leicester. A further 80 miles of route are still to be electrified. The most problematic sections are: listed station buildings close above the tracks at
The class 810 trains on order for this route (part of the Hitachi AT-300 family) are bimodes, using both OHLE and four diesel engines in each five-car unit. Apart from diversionary routes and depot use, these engines will become redundant when and if the line is fully electrified.
Hitachi are currently developing a battery version of their class

PROPOSAL
1. Further MML electrification should be funded only for two sections: firstly Sheffield-Chesterfield; and then Derby-East Midlands Parkway. These would save electrifyng two thirds of the remaining route miles but would still utilise the Grid Supply points already planned at Ratcliffe-on-Soar and at Chesterfield. This avoids all the problematic areas listed above.
2. Ask Hitachi to quote for supplying battery versions of the 810 trains, instead of diesel, starting with the second half of the fleet.
3. When the BEMUs are delivered, swap over two of the new battery units with two of the diesels in the first half of the fleet to create a uniform fleet of tri-mode 810s with two diesel engines and two battery packs in each.
4. Wire platforms 6 and 7 of Nottingham station, to allow batteries to be recharged there, fed by either a static frequency converter (SFC) from the local supply, or a 25kV cable laid along the side of the track from Kegworth.
ANALYSIS
We assume that an 810 tri-mode would have 90km battery range and 10-15 min recharging time, the same as the Hitachi AT200 Regional Battery Train, as shown in this Hitachi graphic:

A 55-mile range would be enough to comfortably bridge the 25-mile gaps between Wigston and EMD; and between Derby and Chesterfield.
The proposed wiring would also allow the use of BEMUs on many other routes in the region, including Liverpool-Nottingham (biggest gap 30 miles); Leeds-Nottingham (34 miles); Crewe-Newark (34 miles); Matlock-Nottingham (17 miles x2); and many local services around Sheffield. All with no further wiring needed.
And if it turns out that the battery conversion of the 810s is too expensive or not practical, they can always use the diesel engines as delivered instead, while a future administration could authorise the remaining OHLE on the MML when public finances improve.
Yours sincerely,
A bright new graduate entrant in the Department for Transport.
Last edited: