From https://www.railforums.co.uk/threads/gwr-class-165-166-turbo-diagrams.157030/page-50#post-5821733
If the 158s are disbanded back to their original identities for this purpose. the current combined LTV/West diesel fleet is:
* 20 2-car 150s 150202/07/16/19/21/32/33/34/38/39/43/44/46-49/61/63/65/66 (40 vehicles)
* 19 2-car 158s 158745-51/60-62/64-69/71/76/78 (38 vehicles)
* 1 3-car 158 158798 (3 vehicles)
(currently formed as 10 2-car 158745/47/49/50/60/62/65-67/69 and 7 3-car units 158798/950/51/56-59)
* 16 3-car 165s 165101-14/16/17 (48 vehicles)
* 20 2-car 165s 165118-37 (40 vehicles)
* 21 3-car 166s 166201-21 (63 vehicles)
* 14 4-car HST sets GW01-GW11 / GW14-GW16 (although it seems that 15 can be formed with one of GW12/GW13 operating as an additional 3-car set)
That is 113 'units'. We can assume that the 769s basically displace HSTs through the cascade, it they ever enter service, and that modern rolling stock should have slightly better utilisation in any case.
On the basis of 3- or 4- car units, I think we are looking at a total very much below 100, especially if there is some slack in the 80x fleet that can be utilised.
However, I think there will need to be some 2-car units and there are some very specific constraints (eg platform length at Bourne End for Marlow, platform length at Looe, making up 5-car trains on selected Cardiff to Portsmouth services, shorter Cornish branch trains in the winter, the curve at Calstock etc).
There seems to be an assumption that the trains need to be suitable for longer-distance services but it is a mix of metro, local and regional services being provided so it could well be more than one fleet specification (although the constraints above should be noted), whether one body type and different internal configuration or multiple body types and configurations.
Despite the suggestion of a new Hitachi fleet, I suspect that the idea of a 100% new fleet for these services is fantasy.
Of course it could. All it needs to do is define the issue and then put in place a plan. It doesn't need to deliver it.I guess a 6 year award couldn’t leave the problem until at least 2028.
I'm not sure how you get to anything like 135 units, particularly if they are 3- and 4-car units.When GWR publishes the draft west rolling stock policy and DfT approves (!), it ought to be possible to go ahead anytime since the operating contracts are cost-plus. I’m sure there will be many obstacles though!
My guess will be a mix of circa 135 3 and 4-car Hitachi AT200 all 25kv ac / 750v dc plus interchangeable diesel / battery pack. HMG want to keep Newton Aycliffe busy, and DfT will be all over the efficiencies of an all Hitachi GWR…. SWR West of England could follow suit taking the order to c 170.
If the 158s are disbanded back to their original identities for this purpose. the current combined LTV/West diesel fleet is:
* 20 2-car 150s 150202/07/16/19/21/32/33/34/38/39/43/44/46-49/61/63/65/66 (40 vehicles)
* 19 2-car 158s 158745-51/60-62/64-69/71/76/78 (38 vehicles)
* 1 3-car 158 158798 (3 vehicles)
(currently formed as 10 2-car 158745/47/49/50/60/62/65-67/69 and 7 3-car units 158798/950/51/56-59)
* 16 3-car 165s 165101-14/16/17 (48 vehicles)
* 20 2-car 165s 165118-37 (40 vehicles)
* 21 3-car 166s 166201-21 (63 vehicles)
* 14 4-car HST sets GW01-GW11 / GW14-GW16 (although it seems that 15 can be formed with one of GW12/GW13 operating as an additional 3-car set)
That is 113 'units'. We can assume that the 769s basically displace HSTs through the cascade, it they ever enter service, and that modern rolling stock should have slightly better utilisation in any case.
On the basis of 3- or 4- car units, I think we are looking at a total very much below 100, especially if there is some slack in the 80x fleet that can be utilised.
However, I think there will need to be some 2-car units and there are some very specific constraints (eg platform length at Bourne End for Marlow, platform length at Looe, making up 5-car trains on selected Cardiff to Portsmouth services, shorter Cornish branch trains in the winter, the curve at Calstock etc).
There seems to be an assumption that the trains need to be suitable for longer-distance services but it is a mix of metro, local and regional services being provided so it could well be more than one fleet specification (although the constraints above should be noted), whether one body type and different internal configuration or multiple body types and configurations.
Despite the suggestion of a new Hitachi fleet, I suspect that the idea of a 100% new fleet for these services is fantasy.
