Acceptance by Rock Rail SW is one thing; this doesn't necessarily mean that SWR have accepted the same units as well.
16 units so far have been bought by the leasing company, ie taken into stock. That means those units are OK.I'm sure they're not refusing them for no reason, yet we fail to receive regular updates on exactly why they're not being accepted. Are doors still opening? Are the shoes not picking up electricity? Are drivers having a sulk about how comfy the cab seat is?
Yes, hopefully the TOC will accept those 16 and driver training will now hastily take place.16 units so far have been bought by the leasing company, ie taken into stock. That means those units are OK.
16 units is enough to operate the Windsor and Reading services plus three spares, so that seems a good start to me.
It was mentioned on FB last week by someone seemingly in the know that 701017 (one of the units taken into stock) had SWR staff on board on its run around the Hounslow loopYes, hopefully the TOC will accept those 16 and driver training will now hastily take place.
Plenty of the test runs have had SWR staff onboard, doesn't necessarily indicate any progress.It was mentioned on FB last week by someone seemingly in the know that 701017 (one of the units taken into stock) had SWR staff on board on its run around the Hounslow loop
Of all the many issues highlighted by GB drivers doing the testing, I’ve not heard about drivers sulking about how comfy the cab seat is. I can assure you a cab seat in a 455 or 458 isn’t good by any means, yet they’re out in service.I'm sure they're not refusing them for no reason, yet we fail to receive regular updates on exactly why they're not being accepted. Are doors still opening? Are the shoes not picking up electricity? Are drivers having a sulk about how comfy the cab seat is?
It clearly wasn't a test run as that's one of the units taken into stock having completed its fault free running.Plenty of the test runs have had SWR staff onboard, doesn't necessarily indicate any progress.
Have the units been accepted by SWR, though? Could it be a test run for SWR as part of their acceptance?It clearly wasn't a test run as that's one of the units taken into stock having completed its fault free running.
Could be testing if it is testing compatibility with a new route. Fingers crossed it is driver training instead.It clearly wasn't a test run as that's one of the units taken into stock having completed its fault free running.
They were route tested everywhere ages ago.Could be testing if it is testing compatibility with a new route. Fingers crossed it is driver training instead.
Fingers crossed that kind of testing does not expire with time !.They were route tested everywhere ages ago.
Given that Rock Rail SW have bought them they will be eager to get rental from SWR. If they weren't sure that SWR would start paying up I would be surprised if they decided to buy the units from the manufacturer.Acceptance by Rock Rail SW is one thing; this doesn't necessarily mean that SWR have accepted the same units as well.
I thought that was the case with all Aventras pending design and fitment of new capacitor casings.The units still remain switched off with removable lamps attached in the sidings and depots when they're not going between Eastleigh/Derby etc. or out on test. I don't think anyone knows quite what, but there's definitely more than industrial relations issues going on here.
Can not comment on your specifics (genuinely do not know), but over a decade ago, it came as a bit of a surprise (bit of a shock) to some in the operations side to learn that even back then, there were certain areas of the network that couldn't cope with the electrical traction draw required for the plan as was in place at the time. Certain parts of the PDL and also the old race ground on the main line. Reading between the lines the Desiro fleet were a far more hungry eater of the juice than any 400 unit, except possibly the Reps? But got the impression this was kept very quiet at certain senior levels, whilst other initiatives required the operations side to increase formations to meet an ever increasing demand (at that time), say no more.The units still remain switched off with removable lamps attached in the sidings and depots when they're not going between Eastleigh/Derby etc. or out on test. I don't think anyone knows quite what, but there's definitely more than industrial relations issues going on here.
No paths have appeared on RTT but its about time.. maybe a Christmas miracleI’ve heard that driver training on 701s May commence next week, has anyone else heard similar?
I'd be stunned if that's trueI’ve heard that driver training on 701s May commence next week, has anyone else heard similar?
Why's that?I'd be stunned if that's true
I'd be stunned if that's true
Multiple days affected by industrial action would be one reason.Why's that?
Good point!!!!Multiple days affected by industrial action would be one reason.
Would be completely out of the blue and wouldn't fit with other recent events at all. Quite a few drivers have/are being trained up on 707s recently to avoid depots being short for example, which isn't the kind of thing you'd do if 701 introduction was around the corner.Why's that?
If training starts next week I hardly think introduction is just around the corner. It would surely be Spring at the earliest and then a few months on from that before there were sufficient 701s diagrammed to displace the final 707s. And that doesn't take into account the need to take the 458s out of service for conversion.Would be completely out of the blue and wouldn't fit with other recent events at all. Quite a few drivers have/are being trained up on 707s recently to avoid depots being short for example, which isn't the kind of thing you'd do if 701 introduction was around the corner.
The 720s passed testing fairly well but were Years late. The 701's differences definitely look to have caused further delay.It’s been noted that other Aventra type stock has actually entered service on a few networks, from what I can tell, relatively trouble-free.
It's been documented that one of the major issues was very poor quality control and rushed production during the first year of Covid in an attempt to catch up with what was already late delivery.The 720s passed testing fairly well but were Years late. The 701's differences definitely look to have caused further delay.