Well, NR/DfT had better get on with it. ROG ordered 30 4MW class 93s in Jan 2021, and GBRf ordered 30 6MW class 99s in April 2022. The economics of these locomotives means that they will be used primarily on routes that have long runs under the wires, currently hauled by diesel class 66s. Which means a lot of them will use WCML. So there will be a step change in electric usage from 2023 onwards, growing rapidly thereafter given the cost advantage of 93s and 99s over 66s. Have these developments been built into electrification reinforcement planning?
Don't forget an 11-car 390 is rated at just under 6MW, and a pair of power-limited 90's (or 86s) is around 5.6 MW, so we've been in the 6 MW per train era on the WCML for while.
Getting back to the title of the thread, the answer is surely 'anything is possible if want to throw enough money at it.
Examples are the Lötschberg, Gotthard and other base tunnels.
Another good example is the line over Rogers Pass in Canada which has been rebuilt & realigned twice with long tunnels - in 1916 with the 8km Connaught Tunnel, lowering the summit and reducing operating costs considerably, then again in 1988 with the 14.7km Mount Macdonald Tunnel which double-tracked the pass and reduced the westbound ruling gradient from 2.2% to 1%, eliminating the need for pusher (banking) locos.