Yes it has, was out a few days after arriving.Do we know if 001 has been out on test yet? I've not seen any reports of it.
Thanks for that, good to know testing is well underway.Yes it has, was out a few days after arriving.
Interesting!! Are they all going there?398003 now also at Old Dalby.
Visit to Transport for Wales New Train Mock-Ups 29/09/2022 16:00:00 - 29/09/2022 17:30:00 When: 29 September 2022 16:00 - 17:30
Where: Amey Taff’s Well Rail Depot, Moy Road Industrial Estate, Taff’s Well, Rhondda Cynon Taf, CF15 7QR
Speaker: Jamie Warner
We are pleased to be able to offer CILT members the opportunity to visit the Transport for Wales mock ups of the new trains that will be introduced across Wales over the next few years. The mock ups show what new trains will look like, including the passenger facilities that will be available. The mock ups include:
• Class 231 and 756 Stadler Flirt, to be used for South East Wales Metro services, and which are already on test within the region
• Class 398 tram-train, which will be the main fleet for Core Valley Lines services from Merthyr, Aberdare and Treherbert to Cardiff.
The visit will provide the chance to learn more about these trains and also see what the passenger experience will be like.
The mock-ups are fully accessible and joining instructions will be provided nearer the time. Please note that spaces are limited on the visit and you are encouraged to book as soon as possible to ensure you have a place.
Booking for Members - FREE
Click 'Book now' online to book, if you have any difficulties email us at regions@ciltuk.org.uk quoting event code: WR0400
Booking for Non-Members - £5.00 inc. VAT
Email regions@ciltuk.org.uk with a completed booking form
Do you have the link to said PDF?Stadler's published a datasheet (PDF) for the units. unsure how much of the information in there is actually new, but it makes for a good overview of their dimensions, capabilities and interior layout.
If you click on where it says 'a datasheet' you should have the link https://www.stadlerrail.com/media/pdf/cttwb0922e.pdfDo you have the link to said PDF?
In January 2019, Stadler was awarded the contract to manufacture and supply 36 CITYLINK tram-trains and 35 FLIRT trains. The
three-car tram-trains will operate on 25 kV AC lines and use battery power, with traction battery systems helping avoid costly
infrastructure investments for the client. Adapted to suit the tram and rail network serving the South Wales Metro, these light
rail vehicles can travel on both rail tracks and tram lines and have a driver’s cab at each end. On the rail network, they can run at
100km/h. Forty metres long and able to carry 252 passengers, the high-floor vehicles feature spacious, bright and air-conditioned
passenger compartments, with six multifunctional areas for bicycles, seats for people with reduced mobility, and two wheelchair
passenger spaces. CITYLINK is a modular, barrier-free light rail vehicle family specially designed to connect the city centre with
its outlying areas. Safe and highly comfortable, these tram-trains promote seamless travel for passengers and mean that they do
not have to change modes.
https://www.stadlerrail.com/media/pdf/cttwb0922e.pdf. my original post did have a link to it, but inside the text; sorry if that wasn't clear.Do you have the link to said PDF?
Thank youhttps://www.stadlerrail.com/media/pdf/cttwb0922e.pdf. my original post did have a link to it, but inside the text; sorry if that wasn't clear.
More standing capacity though, and no need to lower the existing platforms.About the same seating capacity as a 150 but no accessible toilet. 915mm entrance height so any street running sections will require the building of expensive platform structures.
About the same seating capacity as a 150 but no accessible toilet. 915mm entrance height so any street running sections will require the building of expensive platform structures.
And most important of all, a lot quicker than the 150s on the Valleys Network. Much better for the environment too. And whilst that could have been achieved with a conventional EMU, this future proofs the ability to expand the network using cheaper light rail standards.More standing capacity though, and no need to lower the existing platforms.
But it doesn't future proof it you need to build expensive 'stations' on the light rail areas and by retaining guards and drivers you aren't obtaining the savings now.And most important of all, a lot quicker than the 150s on the Valleys Network. Much better for the environment too. And whilst that could have been achieved with a conventional EMU, this future proofs the ability to expand the network using cheaper light rail standards.
I'm confused as to what keeping the guards onboard has anything to do with it? If they'd gone for a heavy rail EMU solution they'd be just as likely to have kept guards on. Unless you want them to go for a low floor pure light rail solution - but then you lose the ability to run between Cardiff Central and Queen Street, and to share the network with freight.But it doesn't future proof it you need to build expensive 'stations' on the light rail areas and by retaining guards and drivers you aren't obtaining the savings now.
Your are right to be confused because the reasoning by WG/TFW for getting them is confused. Trams are meant to be cheaper but they aren't cheaper if you operate them as heavy rail EMUs. Equally in the future expansion you have compromised yourself because of the constraints, high floor, 25kv electrification of the heavy rail compatible trams.I'm confused as to what keeping the guards onboard has anything to do with it? If they'd gone for a heavy rail EMU solution they'd be just as likely to have kept guards on. Unless you want them to go for a low floor pure light rail solution - but then you lose the ability to run between Cardiff Central and Queen Street, and to share the network with freight.
Given the largest light rail network in the country uses high platforms it doesn't seem to have been much of a barrier towards expansion there.
From the Welsh Government's perspective providing jobs is at least as important as providing services for passengers.Your are right to be confused because the reasoning by WG/TFW for getting them is confused. Trams are meant to be cheaper but they aren't cheaper if you operate them as heavy rail EMUs. Equally in the future expansion you have compromised yourself because of the constraints, high floor, 25kv electrification of the heavy rail compatible trams.
As regards Manchester some of these issues are already playing out where the capacity on some branches is constrained by the on street running in the centre.
I don't recall it ever being suggested officially that they bought tram trains for cheapness - but purely to allow street running in future. But maybe I missed something there?Your are right to be confused because the reasoning by WG/TFW for getting them is confused. Trams are meant to be cheaper but they aren't cheaper if you operate them as heavy rail EMUs. Equally in the future expansion you have compromised yourself because of the constraints, high floor, 25kv electrification of the heavy rail compatible trams.
As all the present stations are at conventional rail height it is a lot cheaper to potentially build a handful of high platforms in the bay area (none are currently planned) than to convert all the existing platforms to low floor.