Especially as from December there will be other stations that are too short for a 4 car MKIV set that will be served, and not just the current twice a day Abergavenny calls. Nantwich, Whitchurch, Wem and Leominster are all too short in at least one if not both directions and all are booked to be served.
Of note, is that from December Wem, Whitchurch and Nantwich are losing a LOT of Class 1 services and will primarily be served by Class 2 local services.

Wem: currently has 16 Class 1 services to be reduced to 13 from Dec
Whitchurch: currently has 23 Class 1 services to be reduced to 14 from Dec
Nantwich: currently has 24 Class 1 services to be reduced to 20 in Dec

Not sure how many of the remaining services stopping at these stations will be loco-hauled but it does somewhat reduce the potential for issues to arise.

I do wonder if it’s to claw some time back for the loss in running south of Shrewsbury with loco-hauled services running at less than MU speeds.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Of note, is that from December Wem, Whitchurch and Nantwich are losing a LOT of Class 1 services and will primarily be served by Class 2 local services.

Wem: currently has 16 Class 1 services to be reduced to 13 from Dec
Whitchurch: currently has 23 Class 1 services to be reduced to 14 from Dec
Nantwich: currently has 24 Class 1 services to be reduced to 20 in Dec

Not sure how many of the remaining services stopping at these stations will be loco-hauled but it does somewhat reduce the potential for issues to arise.

I do wonder if it’s to claw some time back for the loss in running south of Shrewsbury with loco-hauled services running at less than MU speeds.
I think you may right about fitting around loco timings - there's very little difference in timings between a non stop loco limited to 70mph and a 90mph DMU stopping at the 3 major stations. The last I heard TfW were still trying to persuade Network Rail to allow running at MU speeds; it would be nice if that could be done as part of the big recast coming.

That said, whilst the stations are getting fewer calls, they are better spread out. At the moment, Nantwich often gets a 1 hour 45 minutes wait for a train, followed another 15 minutes later.

== Doublepost prevention - post automatically merged: ==

Also what's with the two guards currently needed?
Abergavenny down platform isn't long enough for the current 4 cars + DVT set. On the two services each day in this direction booked to call 2 guards are booked to be on board, with one used to manually lock out the rear door just for Abergavenny. If for whatever reason only one guard is available, a Not to Call order has to be issued and the service skips Abergavenny.
 

Envoy

Established Member
Joined
29 Aug 2014
Messages
3,155
Abergavenny down platform isn't long enough for the current 4 cars + DVT set. On the two services each day in this direction booked to call 2 guards are booked to be on board, with one used to manually lock out the rear door just for Abergavenny. If for whatever reason only one guard is available, a Not to Call order has to be issued and the service skips Abergavenny.
Why can’t it just have 1 guard who can lock the rear door when approaching Abergavenny?
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Why can’t it just have 1 guard who can lock the rear door when approaching Abergavenny?
Manually locking out end doors and leaving them unattended whilst the guard dispatches from the other end is frowned upon. It's never been an officially permitted method of working at TfW.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
Manually locking out end doors and leaving them unattended whilst the guard dispatches from the other end is frowned upon. It's never been an officially permitted method of working at TfW.
I’m guessing the official reasoning is like at Northern. If there was a fire blocking the route forwards and the escape route backwards is locked out it could be rather problematic at the inquest.

Many people don’t think of that.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,893
Location
South Wales
Especially as from December there will be other stations that are too short for a 4 car MKIV set that will be served, and not just the current twice a day Abergavenny calls. Nantwich, Whitchurch, Wem and Leominster are all too short in at least one if not both directions and all are booked to be served.
Pyle also being served
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Pyle also being served
Pyle is down as an unadvertised stop on RTT, and only on the northbound service. I know there are some pretty strict rules around trains longer than 4 cars calling at Swanline stops so it wouldn't surprise me if it doesn't actually happen.

== Doublepost prevention - post automatically merged: ==

I’m guessing the official reasoning is like at Northern. If there was a fire blocking the route forwards and the escape route backwards is locked out it could be rather problematic at the inquest.

Many people don’t think of that.
Funnily enough the rules around an end door being OOU requiring the entire car to be locked OOU were removed a few years ago.
 

el_lnrd

Member
Joined
17 Dec 2019
Messages
29
Location
Cardiff
In December 2022, according to RTT, Mk4 diagrams seem to be as follow:

1
Cardiff C 1W11 04:35 - 10:15 Manchester Picadilly
Manchester Picadilly 1V37 08:30 -11:53 Cardiff C
Cardiff C 1W19 12:49 - 16:15 Manchester Picadilly
Manchester Picadilly 1V50 16:30 - 20:42 Swansea

2
Swansea 1W13 05:36 - 10:15 Manchester Picadilly
Manchester Picadilly 1V39 10:30 -13:53 Cardiff C
Cardiff C 1W61 14:49 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

3
Manchester Picadilly 1V33 06:27 -09:56 Cardiff C
Cardiff C 1W57 10:52 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

4
Cardiff C 1W55 08:49 - 12:15 Manchester Picadilly
Manchester Picadilly 1V42 12:30 -15:44 Cardiff C
Cardiff C 1W65 18:55- 22:27 Manchester Picadilly

At Landore there is a ex-GC Mk4 sets at least, as well as a red liveried DVT.
 

Clouds

Member
Joined
4 Jun 2021
Messages
6
Location
Nuneaton
In December 2022, according to RTT, Mk4 diagrams seem to be as follow:

1
Cardiff C 1W11 04:35 - 10:15 Manchester Picadilly
Manchester Picadilly 1V37 08:30 -11:53 Cardiff C
Cardiff C 1W19 12:49 - 16:15 Manchester Picadilly
Manchester Picadilly 1V50 16:30 - 20:42 Swansea

2
Swansea 1W13 05:36 - 10:15 Manchester Picadilly
Manchester Picadilly 1V39 10:30 -13:53 Cardiff C
Cardiff C 1W61 14:49 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

3
Manchester Picadilly 1V33 06:27 -09:56 Cardiff C
Cardiff C 1W57 10:52 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

4
Cardiff C 1W55 08:49 - 12:15 Manchester Picadilly
Manchester Picadilly 1V42 12:30 -15:44 Cardiff C
Cardiff C 1W65 18:55- 22:27 Manchester Picadilly

At Landore there is a ex-GC Mk4 sets at least, as well as a red liveried DVT.
So much for the time savings TFW claimed
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
In December 2022, according to RTT, Mk4 diagrams seem to be as follow:

1
Cardiff C 1W11 04:35 - 10:15 Manchester Picadilly
Manchester Picadilly 1V37 08:30 -11:53 Cardiff C
Cardiff C 1W19 12:49 - 16:15 Manchester Picadilly
Manchester Picadilly 1V50 16:30 - 20:42 Swansea

2
Swansea 1W13 05:36 - 10:15 Manchester Picadilly
Manchester Picadilly 1V39 10:30 -13:53 Cardiff C
Cardiff C 1W61 14:49 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

3
Manchester Picadilly 1V33 06:27 -09:56 Cardiff C
Cardiff C 1W57 10:52 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

4
Cardiff C 1W55 08:49 - 12:15 Manchester Picadilly
Manchester Picadilly 1V42 12:30 -15:44 Cardiff C
Cardiff C 1W65 18:55- 22:27 Manchester Picadilly

At Landore there is a ex-GC Mk4 sets at least, as well as a red liveried DVT.
Diagram 4 actually starts at Crewe with 0454 to Cardiff. This causes an imbalance as it requires another set to overnight there. This is likely to be off either ~1650 Cardiff - Manchester or ~2015 Cardiff to Manchester - both of which are missing from RTT entirely, but ECS paths back to Crewe from Manchester do show at around the right time for both services. The 2030 Manchester - Cardiff, which would be expected to be formed with the set off the 1650 from Cardiff, is also shown on the system with no inward working, and is pathed for a DMU.

Also, the initial plans I saw showed some interworking of Manchester and Holyhead sets at Cardiff during the day, but I'm not sure if that's still the plan.

So much for the time savings TFW claimed
Wait until the full timetable comes into effect - that should see some of the intermediate calls on the Marches dropped and services sped up.
 

xotGD

Established Member
Joined
4 Feb 2017
Messages
7,899
In December 2022, according to RTT, Mk4 diagrams seem to be as follow:

1
Cardiff C 1W11 04:35 - 10:15 Manchester Picadilly
Manchester Picadilly 1V37 08:30 -11:53 Cardiff C
Cardiff C 1W19 12:49 - 16:15 Manchester Picadilly
Manchester Picadilly 1V50 16:30 - 20:42 Swansea

2
Swansea 1W13 05:36 - 10:15 Manchester Picadilly
Manchester Picadilly 1V39 10:30 -13:53 Cardiff C
Cardiff C 1W61 14:49 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

3
Manchester Picadilly 1V33 06:27 -09:56 Cardiff C
Cardiff C 1W57 10:52 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

4
Cardiff C 1W55 08:49 - 12:15 Manchester Picadilly
Manchester Picadilly 1V42 12:30 -15:44 Cardiff C
Cardiff C 1W65 18:55- 22:27 Manchester Picadilly

At Landore there is a ex-GC Mk4 sets at least, as well as a red liveried DVT.
Some of the above are a bit garbled and duplicated.

But basically a 67 every 2 hours.
 

sd0733

Established Member
Joined
7 Nov 2012
Messages
5,198
In December 2022, according to RTT, Mk4 diagrams seem to be as follow:

1
Cardiff C 1W11 04:35 - 10:15 Manchester Picadilly
Manchester Picadilly 1V37 08:30 -11:53 Cardiff C
Cardiff C 1W19 12:49 - 16:15 Manchester Picadilly
Manchester Picadilly 1V50 16:30 - 20:42 Swansea

2
Swansea 1W13 05:36 - 10:15 Manchester Picadilly
Manchester Picadilly 1V39 10:30 -13:53 Cardiff C
Cardiff C 1W61 14:49 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

3
Manchester Picadilly 1V33 06:27 -09:56 Cardiff C
Cardiff C 1W57 10:52 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

4
Cardiff C 1W55 08:49 - 12:15 Manchester Picadilly
Manchester Picadilly 1V42 12:30 -15:44 Cardiff C
Cardiff C 1W65 18:55- 22:27 Manchester Picadilly

At Landore there is a ex-GC Mk4 sets at least, as well as a red liveried DVT.
The sets interwork with Holyhead workings so thats not what the actual diagrams will be even if the workings are.
1 diagram, pretty much the one shown there as diagram 2 wont he starting until around March to allow the current sets to have SDO fitted.
 

Watershed

Veteran Member
Associate Staff
Senior Fares Advisor
Joined
26 Sep 2020
Messages
16,785
Location
UK
In December 2022, according to RTT, Mk4 diagrams seem to be as follow:

1
Cardiff C 1W11 04:35 - 10:15 Manchester Picadilly
Manchester Picadilly 1V37 08:30 -11:53 Cardiff C
Cardiff C 1W19 12:49 - 16:15 Manchester Picadilly
Manchester Picadilly 1V50 16:30 - 20:42 Swansea

2
Swansea 1W13 05:36 - 10:15 Manchester Picadilly
Manchester Picadilly 1V39 10:30 -13:53 Cardiff C
Cardiff C 1W61 14:49 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

3
Manchester Picadilly 1V33 06:27 -09:56 Cardiff C
Cardiff C 1W57 10:52 - 18:15 Manchester Picadilly
Manchester Picadilly 1V62 18:30 - 21:55 Cardiff C

4
Cardiff C 1W55 08:49 - 12:15 Manchester Picadilly
Manchester Picadilly 1V42 12:30 -15:44 Cardiff C
Cardiff C 1W65 18:55- 22:27 Manchester Picadilly

At Landore there is a ex-GC Mk4 sets at least, as well as a red liveried DVT.
Think you've got some of those timings mixed up ;)

But in essence, there's a Mk4 path every second hour except on Sundays - departing 06:30 till 20:30 at the Manchester end, and 04:35 till 18:55 at the Cardiff end. One working at the start and end of day runs to/from Swansea, otherwise they're all to/from Cardiff.

How many of those actually run as Mk4s is another matter...
 

GWVillager

Member
Joined
2 May 2022
Messages
871
Location
West Yorkshire
I think you may right about fitting around loco timings - there's very little difference in timings between a non stop loco limited to 70mph and a 90mph DMU stopping at the 3 major stations. The last I heard TfW were still trying to persuade Network Rail to allow running at MU speeds; it would be nice if that could be done as part of the big recast coming.
Why can't they run at MU speeds anyway?
 

whoosh

Established Member
Joined
3 Sep 2008
Messages
1,895
Funnily enough the rules around an end door being OOU requiring the entire car to be locked OOU were removed a few years ago.

Not quite the case.

The rules were changed, but now differentiate a door being locked, and a door being locked but still able to be egressed from, and that in the latter case the entire coach may not have to be locked out of use and can continue normally if authority is given by the TOC's Control.

If it's physically locked and can't be egressed from, then the rule hasnt changed.

The Rule Book now also allows (with Control's authority) a car with an internal door or barrier which has been secured (like separating first class for example) near the next operative door, to continue normally.

There will have been a risk assessment done for these coaches, and a risk assessment for the arrangements at Abergavenny.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Mk4 coaches ran at 125mph on the ECML though, so why below line speed on the Marches route?
The ECML has sufficient braking distances and weight limits for any vehicle capable of 125mph to run at those speeds. On the Marches, only vehicles that are light enough and have good enough brakes to run at MU speeds are allowed to run at those speeds. It's the difference between one of the most important Intercity links in the country, and something that's more of a secondary regional link.
Not quite the case.

The rules were changed, but now differentiate a door being locked, and a door being locked but still able to be egressed from, and that in the latter case the entire coach may not have to be locked out of use and can continue normally if authority is given by the TOC's Control.

If it's physically locked and can't be egressed from, then the rule hasnt changed.

The Rule Book now also allows (with Control's authority) a car with an internal door or barrier which has been secured (like separating first class for example) near the next operative door, to continue normally.

There will have been a risk assessment done for these coaches, and a risk assessment for the arrangements at Abergavenny.
True - although I've always found the bit about control giving authority hilarious. Given a choice are they really likely to say no to keeping the set in service?
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,942
MU speeds are for multiple units; and their superior braking performance.

MU speeds are for multiple units, with their superior braking performance and light weight.

The loco hauled Mark IV sets have only one of these characteristics.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,889
Location
Cambridge
MU speeds are for multiple units, with their superior braking performance and light weight.

The loco hauled Mark IV sets have only one of these characteristics.
Very heavy, clunky things compared to the nifty 175s. A slackened timetable on Manchester services would definitely be a good idea.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Very heavy, clunky things compared to the nifty 175s. A slackened timetable on Manchester services would definitely be a good idea.
On the contrary, where they're not held back by lower speed limits, the 67s will leave a 175 standing. Especially where there's a hill involved - and on the Marches there are lots of them.

They're not good at frequent stops - because of the nature of the brakes precision stopping has to be done carefully, and they're slow to release at well - but it's notable that despite the lower speed limits in parts, the timings for the 67s from December are broadly similar to what the 175s achieve now.
 

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Why can’t it just have 1 guard who can lock the rear door when approaching Abergavenny?
I don’t think there’s a procedure for this. LNER have to lock out an entire carriage (as opposed to just one door) to serve Skipton and Keighley with Mark 4s. I can’t remember what they did at Falkirk Grahamston when Mark 4s briefly worked to Stirling, I think they may have been forced to use local door only in the absence of any other options. Mark 4s aren’t the most flexible stock when it comes to short platforms!

Why can't they run at MU speeds anyway?
Mk4 coaches ran at 125mph on the ECML though, so why below line speed on the Marches route?
Disregarding any potential breaking performance issues with the Mark 4s preventing use of MU speeds, the presence of a 67 in the consist would prevent use of MU speeds - 67s are Route Availability (RA)8, for comparison 185s which are also too heavy for MU speeds are RA5.

Mark 4s can run at HST speeds with 91s on the ECML (or indeed anywhere else with HST differentials), but not with a 67.
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
I don’t think there’s a procedure for this. LNER have to lock out an entire carriage (as opposed to just one door) to serve Skipton and Keighley with Mark 4s. I can’t remember what they did at Falkirk Grahamston when Mark 4s briefly worked to Stirling, I think they may have been forced to use local door only in the absence of any other options. Mark 4s aren’t the most flexible stock when it comes to short platforms!
Local door only at Shipley P1 too.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,938
Location
Mold, Clwyd
MU differentials apply on the Marches route between Nantwich and Craven Arms (90mph rather than 70).
But not Crewe-Manchester (110mph possible Sandbach-Cheadle Hulme) or south of Craven Arms (mostly 90mph to Pontypool).
Shrewsbury-Chester-Holyhead is more complicated, but there are some 90mph stretches as well as some non-MU restrictions.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Disregarding any potential breaking performance issues with the Mark 4s preventing use of MU speeds, the presence of a 67 in the consist would prevent use of MU speeds - 67s are Route Availability (RA)8, for comparison 185s which are also too heavy for MU speeds are RA5.
Although Network Rail were perfectly happy for the 67s to run at MU speeds on the Shrewsbury - Craven Arms section when they were hauling MKIIIs. It's only since the change to MKIVs that they've had to slow down here.
Mark 4s can run at HST speeds with 91s on the ECML (or indeed anywhere else with HST differentials), but not with a 67.
What confuses me is that NR have also said no to running at HST speeds - even though as you say the MKIVs themselves are deemed acceptable for this when hauled by a 91, and a 67 has such good braking characteristics that when running light engine they're not subject to the usual speed limits for such moves.
MU differentials apply on the Marches route between Nantwich and Craven Arms (90mph rather than 70).
But not Crewe-Manchester (110mph possible Sandbach-Cheadle Hulme) or south of Craven Arms (mostly 90mph to Pontypool).
Shrewsbury-Chester-Holyhead is more complicated, but there are some 90mph stretches as well as some non-MU restrictions.
And as I said above, on the sections without MU differentials the 67s will out perform the units. Some of those 90mph sections are unobtainable for a unit, even a 175, but a 67 will do with no problem. My suspicion is they'll trounce the 175s when it comes to accelerating to 100 (and beyond) North of Crewe.

The biggest losses of time for the 67s will be Crewe - Shrewsbury (which is relatively flat and has sustained 90mph running in both directions) and the 40/90MU bridge just north of Craven Arms. If anything could be fixed, those should be the priorities.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
Adding a fifth car to the Mk4 sets will trim the performance somewhat.
True - it'll increase weight by about 13%. I reckon they'll still be quicker than a 175 at that point though, but it'll be interesting to see how exactly it pans out.
But also improve the braking performance?
I'm no expert, but based on my experience driving the sets as they are now the brakes are fine enough as they are. Driving from the DVT I rarely need to go past step 2. It's weight that's going to be the issue I would have thought.
 

GWVillager

Member
Joined
2 May 2022
Messages
871
Location
West Yorkshire
Although Network Rail were perfectly happy for the 67s to run at MU speeds on the Shrewsbury - Craven Arms section when they were hauling MKIIIs. It's only since the change to MKIVs that they've had to slow down here.
Is that weight related as well or more to do with paperwork
 