I'm completely unfamiliar with Chiltern, never used it. And I think I've been north of Baker Street twice. So please forgive me if these are stupid questions!
My understanding is that LUL has 4 tracks: up/down slow, used exclusively by the Metropolitan all stations, and up/down Fast, used by Metropolitan semi-fasts, fasts, and Chiltern trains - is this correct?
If so, is there any way Chiltern trains could get exclusive use of the Fast lines, transfer those from LU to NR control, and equip with 25kV OHLE? Could the Met survive without Fast trains? (or, could Met Fast services be replaced by having more Chiltern EMUs, covering the stretch from Amersham to whatever station is just before Marylebone? Maybe Chesham would have to be a shuttle again.)
Alternatively, is there any room to build a new set of tracks for Chiltern? Even if a double-decker solution like the Jubilee/DLR solution at Canning Town?
Then there'd be no need for dual-voltage tracks or trains.
Otherwise, I guess OHLE from Amersham onwards seems the sensible option, especially if its electrically fine over 4th rail systems.
My understanding is that LUL has 4 tracks: up/down slow, used exclusively by the Metropolitan all stations, and up/down Fast, used by Metropolitan semi-fasts, fasts, and Chiltern trains - is this correct?
If so, is there any way Chiltern trains could get exclusive use of the Fast lines, transfer those from LU to NR control, and equip with 25kV OHLE? Could the Met survive without Fast trains? (or, could Met Fast services be replaced by having more Chiltern EMUs, covering the stretch from Amersham to whatever station is just before Marylebone? Maybe Chesham would have to be a shuttle again.)
Alternatively, is there any room to build a new set of tracks for Chiltern? Even if a double-decker solution like the Jubilee/DLR solution at Canning Town?
Then there'd be no need for dual-voltage tracks or trains.
Otherwise, I guess OHLE from Amersham onwards seems the sensible option, especially if its electrically fine over 4th rail systems.
