Metro95
Member
Are there any Heavy rail lines that could be converted to Trams/Light rail or that could use abandoned railway lines like parts of the Croydon Tramlink and parts of the Manchester Metrolink?
There's a recent Network Rail report which recommends Tram Train or other light rail for reopening March to Wisbech.
Wisbech Network Rail report
In Blackpool/Fylde/Wyre:Are there any Heavy rail lines that could be converted to Trams/Light rail or that could use abandoned railway lines like parts of the Croydon Tramlink and parts of the Manchester Metrolink?
To which you could add Cornbrook to Warrington C, equally a topic in these forums.In Greater Manchester:
- Ashburys to Marple Rose Hill via Reddish (with "on street" running from Piccadilly to Ashburys)
- Pendleton to Hindley (with non-heavy rail routes between Wigan and Hindley, and between Pendleton and Central Manchester)
You might, but I wouldn't.To which you could add Cornbrook to Warrington C, equally a topic in these forums.
That isn’t a good enough argument against conversion, because there exists options that would mitigate against those issues.You might, but I wouldn't.
The CLC line from Manchester to Liverpool is a major interurban route and relying on the Chat Moss line alone for through services between these 2 major cities would be unwise. The 3rd main line (ex-LYR) was run down in the 1960s and then closed.
There is no significant capacity for additional trams between Cornbrook and St.Peter's Square.
You might, but I wouldn't.
The CLC line from Manchester to Liverpool is a major interurban route and relying on the Chat Moss line alone for through services between these 2 major cities would be unwise. The 3rd main line (ex-LYR) was run down in the 1960s and then closed.
There is no significant capacity for additional trams between Cornbrook and St.Peter's Square.
Do we really need more than one main line between Manchester and Liverpool?You might, but I wouldn't.
The CLC line from Manchester to Liverpool is a major interurban route and relying on the Chat Moss line alone for through services between these 2 major cities would be unwise. The 3rd main line (ex-LYR) was run down in the 1960s and then closed.
There is no significant capacity for additional trams between Cornbrook and St.Peter's Square.
Fairly certain the Bromley North branch has come up as part of a Tramlink extension (or a DLR extension, or a Bakerloo extension...).
If (and it's a big IF) NPR is eventually built between Manchester and Liverpool via Warrington, I accept that the CLC line would no longer be needed as a fast route between the 2 cities. However, the need for an underground route if more trams fed into Cornbrook from the west from additional lines means that converting the CLC route to Metrolink faces a significant financial hurdle. The economic state of the country means that proposed major infrastructure projects that have not yet started are likely to be put on the back burner for quite some time. There are more suitable routes for Metrolink expansion at somewhat lower cost.That isn’t a good enough argument against conversion, because there exists options that would mitigate against those issues.
As always, this line comes up as an option to be championed or dismissed. However the context needs highlighting each and every time. As you say, there is not enough capacity through St. Peter’s Sq, therefore if converted, the line has to run in to a tunnel. It’s absurd to assume that Warrington CLC services will run down the middle of Mosley Street or Cross Street in Manchester. Secondly there is an assumption on the delivery of NPR, making fast Liverpool-Manchester via Warrington services on the CLC redundant of any particular need. The result would be that the CLC would be the ‘third’ line between the two cities and the capacity issue
Therefore to counter the argument in favour of converting the CLC from Warrington to Manchester to what would be a light rail metro underground line (operated by Metrolink), and implicitly the conversion of Warrington-Liverpool to Merseyrail operation, a better argument against needs to be put forward.
Yes, a big IF for NPR and an even bigger IF for conversion of the CLC from Warrington to Manchester to Metrolink. We have to view that project based on those infrastructure ‘ingredients’ all coming together. It’ll never be a case of converting to Metrolink and having it feed through to the street running lines in Manchester and no alternative for the fast Liverpool-Manchester services.If (and it's a big IF) NPR is eventually built between Manchester and Liverpool via Warrington, I accept that the CLC line would no longer be needed as a fast route between the 2 cities. However, the need for an underground route if more trams fed into Cornbrook from the west from additional lines means that converting the CLC route to Metrolink faces a significant financial hurdle. The economic state of the country means that proposed major infrastructure projects that have not yet started are likely to be put on the back burner for quite some time. There are more suitable routes for Metrolink expansion at somewhat lower cost.
As one of the people who supports both of those things, I really don't think they are at all comparable.On the CLC route, it amuses me no end that there's so many wanting to turn Warrington Central into a Kirkby/Ormskirk type affair... whilst some (not necessarily the same people, but it wouldn't surprise me) want to extend Merseyrail to Wigan and/or Preston. It's a peculiar tendency to want change for the sake of it.
By contrast, Ormskirk and Kirkby are not natural connection points between two intensively operated peri-urban networks. They are where a peri-urban network ends, and essentially nothing exists on the other side of them.
The lines between Kirkby and Wigan and especially between Ormskirk and Preston are so lightly served that it almost seems silly to keep them open - they serve no serious transport purpose.
I'd argue that Wigan is a far more natural "breakpoint" between the Liverpool and Manchester facing railway networks than Kirkby ever could be. Wanting to move the breakpoint there is, in my view, entirely consistant with wanting to split the CLC at Warrington. Right now we have a line that stops at Kirkby and then an effective void between Kirkby and Wigan which serves essentially noone but still consumes railway resources.
A slightly different argument applies to Ormskirk-Preston - the line certainly serves no serious transport purpose now
, and there is no peri-urban network to go to. So we might as well take over the entire line because otherwise we end up with a worthless stub that serves nothing and noone. It actually make provide some journey possibilities that might be useful if it ran through to Liverpool - it provides none now.
I mean in railway terms.I'm sorry, but that's nonsense. There is a bit of a gap of relative nothingness between Burscough and Croston, but Burscough isn't tiny, and Croston is the highest demand point on the Ormskirk-Preston line. You also have the potential and actual connectivity to Manchester from West Lancashire that can (and even with the walk sometimes does) go that way - it's sometimes quicker than via Liverpool or Preston, and if you split tickets (bizarrely also at Ormskirk) then it's cheaper too. That's why I favour running Merseyrail to Burscough Bridge, and the same with the Preston DMU, giving a connectional hub.
Would this be negatively affected by Merseyrail running to Burscough on its way to Preston?There is considerable commuting from Burscough to Liverpool - it's as much as Scouse suburb as Ormskirk - it just mostly goes down the A59 and parks at Ormskirk station.
Wait you are saying what I am is abject nonsense, but then supporting my conclusions.So I think there's a good case for these. The weaker one is Helsby, but I'd probably also do that just to tidy things up a bit, and you could accompany it with housebuilding to create the demand.
I'm suggesting that a route should be half hourly at least or it potentially is not suitable for modern public transport.It's not a bustling metropolis, but are you seriously proposing closure of all routes with an hourly service?
Would this be negatively affected by Merseyrail running to Burscough on its way to Preston?
Wait you are saying what I am is abject nonsense, but then supporting my conclusions.
I'm a little confused!

I'm suggesting that a route should be half hourly at least or it probably is not suitable for modern public transport.
I was sort of suggesting that if we are going to be in the business of having railways in these places, we should use them more intensively.I was as well. First you were saying Ormskirk-Preston and Kirkby-Wigan should close, and then that they should get Merseyrail? Never mind![]()
On the Ormskirk line you probably want Merseyrail "proper" to go to Burscough, at which point you might as well just run the extra 20km to Preston for the connectivity options.
Why bother with the awkward changeover though? What problem does it solve?Splitting the CLC in the middle would allow two high-intensity peri-urban networks to operate on the lines, serving the relevant city-facing areas in each city's urban region. Since segregation is necessary to make the operation practical, and extending Merseyrail to a special platform at Deansgate would be problematic for various reasons, you have to split it somewhere. Warrington is a natural "breakpoint" to make the connection.
Why bother with the awkward changeover though? What problem does it solve?
To me the obvious solution for the CLC route is to electrify it with standard 25kv OHLE, and run a fairly frequent (say 3/4tph) EMU service between Lime Street and either Oxford Road or Manchester Airport, calling at all stations (apart from the basket-cases like Sankey for Penketh)

I'm sorry, but that's nonsense. There is a bit of a gap of relative nothingness between Burscough and Croston, but Burscough isn't tiny, and Croston is the highest demand point on the Ormskirk-Preston line
I probably do agree with that, though if Rainford received a half hourly service (say) to Liverpool plus some housebuilding it'd become more of a popular commuter suburb
With Liverpool to Preston via Wigan only hourly and quite slow, if the route via Ormskirk was doubled so a half hourly service could run it would once again become the main Liverpool-Preston service
You really think you are going to run faster trains via Ormskirk, by extending the Merseyrail stoppers?
Moorfields to Ormskirk takes half an hour, Ormskirk to Preston takes half an hour…
…whereas the service from Lime Street to Preston (that you dismiss as “quite slow”) takes just fifty minutes …
.., please tell me how the Ormskirk route will be the “main” service?
Thanks for the correction on Sankey, though isn't that the one that now has a limited service due to Warrington West opening?