HamworthyGoods
Established Member
- Joined
- 15 Jan 2019
- Messages
- 4,478
Thought so!
Presuming it's the same LeaseCo that owns the soon to be off lease trains as the ones that were damaged?
Either way it’s just not worth the financial cost fitting out a spare bodyshell of a train built with a 30 year expected life span and is already at/beyond that point. Basically you’re rebuilding a coach that is life expired. You’d do better to buy something new.