• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Possible AC EMU future cascade scenarios?

Status
Not open for further replies.

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,057
Location
Reston City Centre
… but the capacity problems people on here keep moaning about (Marshlink and Whitby, in @yorksrob ’s case) aren’t going to be cured by five coach pure EMUs - so what would these five trains actually be suited to?

Speculating about this kind of thing used to be fun a decade ago, when various options hadn’t been actually tried, but firms have tried to create reliable bi-mode EMUs by sticking engines underneath the body, we’ve got a hydrogen conversion programme, we’ve tried to make some ancient EMUs ‘as good as new’ (Renatus) we’ve seen some used for parcels/ freight work ( which is what ROC intended for the 360s) and had some limited successes, but nothing that seems like a viable long term home for large numbers of older EMUs

For example, nobody seriously expects ScotRail ‘s Sprinter replacement to be patched up 1980s EMUs, they’ll order new trains and do it properly instead

we eventually have to get to the part where we accept that a bigger “waste of money” would be keeping twenty five carriages sat exposed indefinitely in a siding (needing some security/ maintenance etc) rather than cashing in on scrap metal prices
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DanNCL

Established Member
Joined
17 Jul 2017
Messages
5,123
Location
County Durham
Apologies if I've missed this, but how intensively were the 360/2s used in the end? When the 332s went for scrap there were many on here saying despite a relatively short life the intensive use they saw hastened their decline. 360/2s obviously operated the same route, albeit they are a different class and behaved differently regarding calling patterns and operating speeds.
They had a much less intensive lifespan than the 332s. Though there were 4 daily diagrams for the 5 strong fleet, one of those diagrams was the Terminal 4 shuttle.

The 360/2s were limited to use on Heathrow - Paddington stoppers for 15 years, then were placed into store from 2020 with both HEX and later ROG following their purchase of the fleet.
This wasn’t entirely the case. The 360/2s throughout their lives up until the TFL Rail takeover made occasional appearances on the express when the 332s were suffering from poor availability, and indeed for a few weeks in 2016 the 360/2s ran the entire service on the express.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
Apologies if I've missed this, but how intensively were the 360/2s used in the end? When the 332s went for scrap there were many on here saying despite a relatively short life the intensive use they saw hastened their decline. 360/2s obviously operated the same route, albeit they are a different class and behaved differently regarding calling patterns and operating speeds.

Difficult to imagine it was particularly intensive compared to a lot of other stock on the network.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,377
Location
Hertfordshire / Teesdale
There are plenty of spare electric units even without the 360/2s.

And this is the problem, we’ve built too many EMUs when we didn’t need to, meanwhile remain short of DMUs. It was foreseen on here that there would be a massive surplus of EMUs, so surely DFT should have been able to see that too?

Apart from the ownership, there’s little difference between the 360/2s and the large fleet of 350/360s successfully operating with three TOCs. Indeed the 350/2s themselves are on the danger list too, despite being a pretty successful design of train.

We shouldn’t be in this position, and whilst Covid hasn’t helped I don’t think this is the main cause.

== Doublepost prevention - post automatically merged: ==

Difficult to imagine it was particularly intensive compared to a lot of other stock on the network.

I seem to remember the notion that the 332s had been intensively worked was to some extent debunked on here at the time.
 

adc82140

Established Member
Joined
10 May 2008
Messages
3,407
Seriously, scrapping trainsets that are, what, 15 years old?
There is no use for them. That's the nature of microfleets. Ordered for a specific purpose, then finished with. Had there been an open access operator wanting to start an electric service somewhere requiring 5 units, they may have found a home. But there wasn't. I don't doubt that ROG has spent a fair amount of time trying to spot hire these out, with no takers. No TOC wants the maintenence and training burden these would bring.
 

43066

Veteran Member
Joined
24 Nov 2019
Messages
12,089
Location
London
I seem to remember the notion that the 332s had been intensively worked was to some extent debunked on here at the time.

That would stand to reason. A short route with relatively generous dwells, as I recall, and of course no off airport intermediate stops for the 332s.
 

RailWonderer

Established Member
Joined
25 Jul 2018
Messages
2,217
Location
All around the network
I had a sneaking suspicion. Given the 37 strong fleet of 350/2s are going and the 30 379s still with no home (that GA should have kept but an entire fleet replacement was pledged to guarantee them the franchise) a subclass and micro fleet wasn’t looking good on paper. Not surprised no ROSCO was interested.

DMU conversion or fitting of shoe gear prohibitively too expensive, and TPWS fitting the same. Scotrail want only 3 car and 6 car trains and are snobby towards hand me downs and have the money to pay for brand new bespoke rolling stock (likely a 385 follow on order and a DMU version of them as well).

At least it is only 5 units.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
30 379s still with no home (that GA should have kept but an entire fleet replacement was pledged to guarantee them the franchise)
It would have left GA with a small fleet of trains which don't fit in with the rest of their fleet while they can be cascaded with either GWR or Great Northern.
and TPWS fitting the same
They already have TPWS.
and are snobby towards hand me downs
Well they took on ex LM 321s and are running them as 320s right now.
have the money to pay for brand new bespoke rolling stock (likely a 385 follow on order and a DMU version of them as well).
Not only do they have the money but the 360s wouldn't be suitable, no similarly to the rest of the fleet and Scotrail want ~23m units (on a side note they aren't ordering DMUs).

Ideally they would have joined their 360 friends around moved to LNWR instead of the 730 order.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
5,987
And this is the problem, we’ve built too many EMUs when we didn’t need to, meanwhile remain short of DMUs. It was foreseen on here that there would be a massive surplus of EMUs, so surely DFT should have been able to see that too?
The 360/2s weren't anything to do with DfT. They were bought and paid for by Heathrow Airport Ltd around 17 years ago, to do a specific job - one which they did until the Elizabeth Line superseded it. Thereafter, there was nothing that they were needed or suitable for.

The DfT can be blamed for quite a few things, but not in this case.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
Incorrect as I drove them and they were TPWS fitted as well as ATP and AWS. 332s only had ATP and AWS.
I attach a picture of the desk of the 360/2 and top left you can see the TPWS panel.
Thanks for that.

"Cascade" seems to be a forgotten term nowadays in terms of stock usage.
Reading the whole thread seems to be a forgotten practice nowadays in terms of understanding what's happening :rolleyes:
 

TheEdge

Established Member
Joined
29 Nov 2012
Messages
4,498
Location
Norwich
we eventually have to get to the part where we accept that a bigger “waste of money” would be keeping twenty five carriages sat exposed indefinitely in a siding (needing some security/ maintenance etc) rather than cashing in on scrap metal prices

I keep driving past lines of HSTs and 153s at Potters at Ely and am left wondering why on Earth they aren't tin cans yet. I can't understand why someone is paying to cold store stock, outside for several years now.
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,865
"Cascade" seems to be a forgotten term nowadays in terms of stock usage.
So the plan for 323s to replace 319s isn't happening then? Or Scotrail 156/158/170s to Northern, or the Northern 321s to Greater Anglia etc....

Given you clearly think they should be cascaded, where should they be used? Please provide a realistic suggestion that hasn't already been debunked in this thread.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Modern stock seems to be much more route or service specific.
Technically they can run on any 25kv AC line here. But they are in bad condition and only 5 units isn't much use to anyone apart from EMR and LNWR, who both don't want them.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,377
Location
Hertfordshire / Teesdale
The 360/2s weren't anything to do with DfT. They were bought and paid for by Heathrow Airport Ltd around 17 years ago, to do a specific job - one which they did until the Elizabeth Line superseded it. Thereafter, there was nothing that they were needed or suitable for.

The DfT can be blamed for quite a few things, but not in this case.

They can be blamed for over-ordering new EMUs though, which is what has created the backdrop.

The new LNwR fleet seems to be the one which has created the issues, though GA could have waited one more franchise term with their EMU replacement and focussed on DMUs instead.

The problem is there doesn’t seem to be any actual planning, taking into account what fleets are available and when. Instead the line taken seems to be “it’s the leasing company’s problem”. The difficulty here is the leasing companies, understandably, seem to be taking the line that they will scrap unemployed rolling stock. They were never going to lease it out cheaply en-masse as that would simply drive down their returns on other fleets.

So the end result is we will be back to square one but with many vehicles scrapped, which probably won’t benefit the end-user especially if demand grows again.

I do take the point with the 360/2s specifically that this was always going to be Heathrow’s problem.
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,372
Location
UK
They had a much less intensive lifespan than the 332s. Though there were 4 daily diagrams for the 5 strong fleet, one of those diagrams was the Terminal 4 shuttle.


This wasn’t entirely the case. The 360/2s throughout their lives up until the TFL Rail takeover made occasional appearances on the express when the 332s were suffering from poor availability, and indeed for a few weeks in 2016 the 360/2s ran the entire service on the express.
Still the same route though between Paddington and Heathrow…
 

43102EMR

Established Member
Joined
28 Mar 2021
Messages
1,372
Location
UK
I think the 360/2s, as mentioned above, would have been ideal 319 replacements (albeit if the 350/2s were staying with LNR)
 

Fincra5

Established Member
Joined
6 Jun 2009
Messages
2,636
One thing the DafT can be blamed for is being party to scaling back Electrification projects that has lead to a surplus of EMUs.

As others have pointed out, the 360/2s weren't in the best condition, only a Fleet of 5, so not really much hope of finding a home.

I doubt the 350/2s or 379s will be homeless for too long but then its all down the DfT... The TOC can want more stock but the DfT have to authorise/ fund it.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
I think the 360/2s, as mentioned above, would have been ideal 319 replacements (albeit if the 350/2s were staying with LNR)

They were one option but a weak one. Personally I'd have done 160-200m 125mph new build (i.e. 80x) for the Crewe semifast and maybe the Liverpool-Brum, then cascaded the 350s to backfill the 319s.
 

Bill57p9

Member
Joined
1 Dec 2019
Messages
881
Location
Ayrshire
Absolutely shocking.

In a couple of years time when we're suffering from overcrowding, there'll be some DfT half-wit whining "nah, there aren't enough trains" and we'll be saying yes, becausu you scrapped them all.

There ought to be a inquiry into this level of waste and lack of forethought.
You missed the bit where the DfT blame "the railway" for not preparing for the eventuality the DfT created.

Might ScotRail be interested in the 350/2s as "360 ish" to allow retirement of the 318s?
 
Status
Not open for further replies.

Top