Wasn't it also the case that the 360/2s had ATP and AWS but not TPWS, thus being an oddity which would never be mainline certified without adjustments? Or was that the case for the 332s?
Yes. This is the main cause of them going for scrap. With so much other stock available it was simply never going to be cost effective to fit TPWS. What most people won't know is the purchase of the units came with a load of spare parts worth more than the units themselves. HEX just needed them off Old Oak Common before they started being charged punitive expenses by HS2 for not relinquishing the site.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Kite159

Veteran Member
Joined
27 Jan 2014
Messages
22,778
Location
West of Andover
How hard would it be to remove a middle coach to drop them down to 4 coaches to be more standard?

Such a waste of a modern unit
 

adc82140

Established Member
Joined
10 May 2008
Messages
3,406
IIRC is 360205 newer than the rest? Something tells me it arrived with the 5th coaches for the other ones.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,179
What will happen to the spares acquired? Will they be sent to EMR?
Although parts recovery is suggested many times when units are scrapped, how often is it ever actually done or needed?
I always find it curious why some enthusiasts take such a keen interest in ”parts recovery”, as it’s almost never discussed in the public domain.
 

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
How many cancelled / Graylinged / slowly implemented / otherwise possible electrification schemes would have found a home for these units? I’m specifically looking at the Midland Mainline electrification, alongside the electrification of its branch lines such as Matlock that would have enabled stopping services to switch over to electric traction.
Insanity. Trains less than 20 years old and with similar classes all around the world, being sent for scrap whilst Mk3 based EMUs still blight the network. Total insanity.
It seems utterly wasteful, but to be blunt there is absolutely no use anywhere for a microfleet of these. WMR are binning off some similar 350s, so would have no interest. EMR have said they don't want them. Converting them to DC for SWR would be too costly, as non gangwayed they would be non standard in the fleet. Export was unlikely, as there are just 5 units. They have been sat outside rotting for a handful of years, so scrap it is.
Yes, as @adc82140 says, there needs to be a bit of realism considering it's a fleet of only five units. What's being currently operated with DMUs or older EMU fleets that could realistically be switched over to such a small class? Neither is it practical for them to be added to the fleets of existing operators, seeing as they're no good to current operators of gangway-fitted Desiros, or to current operators of 700-series Desiros, or to operators of third-rail Desiros, and so on and so forth.

That only leaves EMR, who - based on my understand of how the Connect programme is running - probably don't need the fuss.

And that's especially the case if, as @AlexNL and @Chopper have said, they're fitted with Western Region ATP instead of TPWS.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,057
Location
Reston City Centre
Remember this thread next time someone is claiming that ROSCOs would happily continue to provide stock like the (ex) Avanti Vogagers at peppercorn rents, and that we should play hardball with them

Reality is that the scrap value isn’t trivial, and these probably won’t be the last “non-standard” batch of trains to get cut up well ahead of time

(EMR have enough EMUs for their London services; much as I’d have loved the MML to be wired before now, the CP5 commitments wouldn’t have touched Matlock/ Mansfield, so I can’t blame the electrification cancellation for the lack of future for these five coach EMUs)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,274
(EMR have enough EMUs for their London services; much as I’d have loved the MML to be wired before now, the CP5 commitments wouldn’t have touched Matlock/ Mansfield, so I can’t blame the electrification cancellation for the lack of future for these five coach EMUs)
I think it’s also been emphasised before that EMR have enough 360/1 units to run most services as 12 car anyway, but now they’re usually no more than 8 car, its even less likely they need any more.
 

STINT47

Member
Joined
16 Aug 2020
Messages
865
Location
Nottingham
I'm surprised that no one has suggested turning the units into DMU's yet to help replace some life expired sprinters. It's been done before with the 319's but these would offer more modern stock for passengers with air conditioning and improved omfort. The 350-2s could also be done in time allowing the oldest sprinters to be replaced.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,333
I'm surprised that no one has suggested turning the units into DMU's yet to help replace some life expired sprinters.
People can suggest what they like. The evidence is that the railway has not been able to identify a business case to do that.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,493
Location
Yorkshire
I'm surprised that no one has suggested turning the units into DMU's yet to help replace some life expired sprinters. It's been done before with the 319's but these would offer more modern stock for passengers with air conditioning and improved omfort. The 350-2s could also be done in time allowing the oldest sprinters to be replaced.
The significant difference is that the likes of the 319's are plentiful - a sub-class of 5 is not going to be economically viable (before finding what existing problems the units have)
 

Doomotron

Established Member
Joined
25 Jun 2018
Messages
1,423
Location
Kent
I'm surprised that no one has suggested turning the units into DMU's yet to help replace some life expired sprinters. It's been done before with the 319's but these would offer more modern stock for passengers with air conditioning and improved omfort. The 350-2s could also be done in time allowing the oldest sprinters to be replaced.
Let's not make these 360s the new 442s or Deltics...
 

Chopper

Member
Joined
13 Sep 2011
Messages
17
I'm surprised that no one has suggested turning the units into DMU's yet to help replace some life expired sprinters. It's been done before with the 319's but these would offer more modern stock for passengers with air conditioning and improved omfort. The 350-2s could also be done in time allowing the oldest sprinters to be replaced.
The 769s should demonstrate exactly why they shouldn't be considered.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,833
Location
Cambridge
The 769s should demonstrate exactly why they shouldn't be considered.
Exactly. Fiddling around with old trains just because people are desperate to make everything last 40 years, and it just leads to a slow, cruddy train that provides an embarrassing and unreliable service. I know from living on a 769 route - thankfully our ones are being replaced.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,179
Exactly. Fiddling around with old trains just because people are desperate to make everything last 40 years, and it just leads to a slow, cruddy train that provides an embarrassing and unreliable service. I know from living on a 769 route - thankfully our ones are being replaced.
People, or asset owners? I don’t see the issue with trying to maximise use of an asset - heaven knows the hysteria that would have taken place in the Speculative Discussion subforum if the 319s had all been scrapped immediately.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,280
Location
Bolton
I don’t think anyone here expected any of ROG‘s proposals were ever going to work. Spot hire? Parcels?
To be fair, much greater criticised suggestions have made it into build, including the D trains and the 769s, with equally unappealing results. This one could have been better. Or it could have been just as poor.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,833
Location
Cambridge
People, or asset owners? I don’t see the issue with trying to maximise use of an asset - heaven knows the hysteria that would have taken place in the Speculative Discussion subforum if the 319s had all been scrapped immediately.
Frankly, the difference does not bother me as either way, it results in a rubbish knackered old thing propelling passenger services, so the 230/769 projects have shown. I’m not denying that they’re a fair bit older than 360s, mind you.

There isn’t a great deal of demand for five middle-aged 360s, and unfortunately the only other company using the same Class of train don’t seem interested in running the twelve carriage sets that would warrant them.

It’s a shame but I do think a larger subclass like 350/2 or 379 would be far worse all the while there are no plans to replace 323s up north.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,280
Location
Bolton
That only leaves EMR, who - based on my understand of how the Connect programme is running - probably don't need the fuss.
They might have been able to make the case for leasing them in 2019, but there's no way it would happen now.
 

cj_1985

Member
Joined
6 Mar 2010
Messages
847
Location
Lanarkshire
360201-360204 were originally built as 4 car class 350/0 and they had a corridor fitted on the cab, like the 450s

360205 was purpose built as the 360s, while the original 4x units were returned to Germany/Austria to get the corridor removed
 

StephenHunter

Established Member
Joined
22 Jul 2017
Messages
2,917
Location
London
To be fair, much greater criticised suggestions have made it into build, including the D trains and the 769s, with equally unappealing results. This one could have been better. Or it could have been just as poor.
I went on a 230 on the Marston Vale line and it was actually pretty good.

== Doublepost prevention - post automatically merged: ==

Insanity. Trains less than 20 years old and with similar classes all around the world, being sent for scrap whilst Mk3 based EMUs still blight the network. Total insanity.
Platform height is wrong for the other countries that use 25kV.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
Insanity. Trains less than 20 years old and with similar classes all around the world, being sent for scrap whilst Mk3 based EMUs still blight the network. Total insanity.
"All around the world" - Thailand to be exact. I guess you could count Gautrain as well but they operate electrostars.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,391
Location
"Marston Vale mafia"
They physically work when they work, yes. But that doesn't mean that they are an effective and safe solution, or good value for money.

I don't think there's anything unsafe about them now. The fire issue seems to have been solved. They are just sometimes a bit unreliable and lose time due to slow doors (though given the very long layover at Bletchley I don't entirely get why they don't just give them an extra 5 minutes running time each way and that would be fine, it's a slow, self contained branch anyway, it's more about not being late!)

On the MV they have served a very specific purpose, being an available 40m DMU. Thus I can't see any point in any more, and the road to reliability has been challenging to say the least.

== Doublepost prevention - post automatically merged: ==

They also operate 360s in Thailand.

The thing is there's a load of 350/2s about to become available, which are the same thing with gangways, newer and better looked after and we still don't know what's going to happen with them.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,280
Location
Bolton
I don't think there's anything unsafe about them now.
I wouldn't call them unsafe either. Just that they're rather less safe than what will replace them.

I don't think that they will ever be adequately reliable. Which is partly why TfW are replacing some of their duties with 197s before they've even started in service.

They're probably adequate for Island Line, but again are still pretty life limited, and much less good than new build trams would be.
 

anthony263

Established Member
Joined
19 Aug 2008
Messages
6,892
Location
South Wales
I've seen some Facebook posts saying tfw should have bought them.cheap to use between Cardiff and Newport .

To be fair though I've heard stories about the state of the class 332s so I wonder what could be wrong with these but I do think something could have been found for them especially if we had more wires
 

Energy

Established Member
Joined
29 Dec 2018
Messages
5,135
I've seen some Facebook posts saying tfw should have bought them.cheap to use between Cardiff and Newport .
... but they've already bought 756s? The 360s also wouldn't be able to use the discontinuous electrification at TfW. Overall just a bad fit.
 