What’s going on with Thameslink?

Status
Not open for further replies.

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
What do you mean 2 units. It’s one 3 coach 377/3 :D

Unless I’ve got that wrong as I saw a 377/3 go to to TON from RDH. I’ll check southern to see what the next formation is
The Redhill/Tonbridge line requires two units (with a third during Monday to Friday peaks)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
The Redhill/Tonbridge line requires two units (with a third during Monday to Friday peaks)
Alright I am starting go get confused with the word unit?
Do you mean 1 set like one 377? I thought there is only on 1tph on the tonbridge line

Or do you mean 2 units working simultaneously like one could be at Tonbridge and another could be at say
Redhill? And vice versa?
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
A unit or set. To provide an hourly service you need two units (or two trains). If you only had one unit, you would only have a train every two hours
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,005
Location
London
Totally agree

A new less crew-accusatory reason needs to be put in the CIS system. Sadly we can’t have ‘ the TOC is too tight to recruit enough drivers' but can we not have 'a human resourcing error/inadequacy' ?

I'm surprised the union hasn’t pushed for this as the current reason is a threat to their members safety.

That's nonsense - people want to know the reason. If it's a shortage of train crew, it's a shortage of train crew, whatever the background reason may be. It's nothing to do with a train fault. The reason comes down to the company running the trains, not its staff members and any "threat" needs to be dealt with robustly through the proper channels.

"Resource availability" and "shortage of train crew" are essentially the same thing when you think about it - except one is clear english and the other is actually rather vague. I am surprised TfW got that agreed, although certain TOCs have slightly different ways of explaining the same thing. For the record I also don't like "operational incident", but sometimes there is no easy way to explain staff error without getting into the minutiae of the railway (SPADs, wrong routing, wrong side door release, etc.).
 

baz962

Established Member
Joined
8 Jun 2017
Messages
3,664
That's nonsense - people want to know the reason. If it's a shortage of train crew, it's a shortage of train crew, whatever the background reason may be. It's nothing to do with a train fault. The reason comes down to the company running the trains, not its staff members and any "threat" needs to be dealt with robustly through the proper channels.

"Resource availability" and "shortage of train crew" are essentially the same thing when you think about it - except one is clear english and the other is actually rather vague. I am surprised TfW got that agreed, although certain TOCs have slightly different ways of explaining the same thing. For the record I also don't like "operational incident", but sometimes there is no easy way to explain staff error without getting into the minutiae of the railway (SPADs, wrong routing, wrong side door release, etc.).
Right so if people want to know the reason, then it shouldn't be described as shortage of train crew if crew are available.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,005
Location
London
Right so if people want to know the reason, then it shouldn't be described as shortage of train crew if crew are available.

And they are often not? If you've got X number of missing diagrams and Y trains are cancelled accordingly, that is a shortage of train crew. If a driver/guard is late for some other reason such as displacement, there's a reason for that ( "train crew being delayed by service disruption")

You've also got "train crew being unavailable" if you want. Nobody is going to say 100% of the time the reason will be 100% accurate as it's all human inputs and sometimes it's done in a hurry, but it's only what is relayed by people on the ground. Plus something it can have knock on impacts to other trains, and the route cause is a shortage of train crew. "Resource availability" is not one of the industry agreed reasons.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,592
Location
Northampton
Right so if people want to know the reason, then it shouldn't be described as shortage of train crew if crew are available.
Personally, I'd want control staff to be focusing on finding trains to actually run than be constantly distracted updating the PIS. I can understand Drivers being concerned about hostility from passengers, and I can understand the frustruation when an excuse as vague as 'an Operational Incident' is trotted out. So control is going to piss somebody off regardless. Better just to leave the PIS alone and start running trains so we don't have the situation you've described of a driver being sat next to a perfectly fine unit ready to work a service that then gets cancelled. I'd rather the delay reason was incorrect but the train ran instead of a perfectly correct reason for an avoidable cancellation.
 

baz962

Established Member
Joined
8 Jun 2017
Messages
3,664
Personally, I'd want control staff to be focusing on finding trains to actually run than be constantly distracted updating the PIS. I can understand Drivers being concerned about hostility from passengers, and I can understand the frustruation when an excuse as vague as 'an Operational Incident' is trotted out. So control is going to piss somebody off regardless. Better just to leave the PIS alone and start running trains so we don't have the situation you've described of a driver being sat next to a perfectly fine unit ready to work a service that then gets cancelled. I'd rather the delay reason was incorrect but the train ran instead of a perfectly correct reason for an avoidable cancellation.
But it doesn't get run. So they cancel it for no reason and have a wrong reason.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,005
Location
London
Personally, I'd want control staff to be focusing on finding trains to actually run than be constantly distracted updating the PIS. I can understand Drivers being concerned about hostility from passengers, and I can understand the frustruation when an excuse as vague as 'an Operational Incident' is trotted out. So control is going to piss somebody off regardless. Better just to leave the PIS alone and start running trains so we don't have the situation you've described of a driver being sat next to a perfectly fine unit ready to work a service that then gets cancelled. I'd rather the delay reason was incorrect but the train ran instead of a perfectly correct reason for an avoidable cancellation.

People making the operational decisions are rarely (if ever) going to be the same people making the alterations on CIS/PIS.

== Doublepost prevention - post automatically merged: ==

But it doesn't get run. So they cancel it for no reason and have a wrong reason.

Trains don't get cancelled "for no reason".
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,014
Location
Surrey
Personally, I'd want control staff to be focusing on finding trains to actually run than be constantly distracted updating the PIS. I can understand Drivers being concerned about hostility from passengers, and I can understand the frustruation when an excuse as vague as 'an Operational Incident' is trotted out. So control is going to piss somebody off regardless. Better just to leave the PIS alone and start running trains so we don't have the situation you've described of a driver being sat next to a perfectly fine unit ready to work a service that then gets cancelled. I'd rather the delay reason was incorrect but the train ran instead of a perfectly correct reason for an avoidable cancellation.
There's TOC representatives in Three Bridges ROC who should be dealing with CIS in response to adjustments made to services by control although I know the position isn't staffed 24/7.
 

baz962

Established Member
Joined
8 Jun 2017
Messages
3,664
People making the operational decisions are rarely (if ever) going to be the same people making the alterations on CIS/PIS.

== Doublepost prevention - post automatically merged: ==



Trains don't get cancelled "for no reason".
Afraid they do. As I alluded to in a previous post on this thread. A fellow driver, but not a colleague and I were chatting on the phone. He drives for great northern and I said that a lot of trains are getting cancelled. He then told me that he has turned up for work and his train has been cancelled due to shortage of train crew ( doo no guard etc ) . The train is empty in the depot, prepped and no faults and he is booked on and ready for duty. It's an out and back trip so if a later driver isn't available, he can and has been happy to go out and back and if needs be can stable it again. Control offer no reason why it's cancelled. Happened more than once and he can't get an answer.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,005
Location
London
Afraid they do. As I alluded to in a previous post on this thread. A fellow driver, but not a colleague and I were chatting on the phone. He drives for great northern and I said that a lot of trains are getting cancelled. He then told me that he has turned up for work and his train has been cancelled due to shortage of train crew ( doo no guard etc ) . The train is empty in the depot, prepped and no faults and he is booked on and ready for duty. It's an out and back trip so if a later driver isn't available, he can and has been happy to go out and back and if needs be can stable it again. Control offer no reason why it's cancelled. Happened more than once and he can't get an answer.

As I alluded to in my previous post, there is a wider picture. It might be that the service was thinned out (due to a shortage of crew overall) and so certain trains are no longer running accordingly, even if there is a driver. This might be a special peak service (and if a train is truly "one journey only" as per your example from depot-A-B-depot it sounds like it is), they are often some of the first to go.

Again "Control" won't be cancelling trains for the hell of it. If the disruption is really severe, then yes it might happen because it is impossible to track everyone, everywhere but that will normally have a wider reason (due to infrastructure issue) or the like. GTR should use the base reason for that and if they don't, then that's problematic but I don't think that's what we're referring to.
 

choochoochoo

Established Member
Joined
6 Aug 2013
Messages
1,318
That's nonsense - people want to know the reason. If it's a shortage of train crew, it's a shortage of train crew, whatever the background reason may be. It's nothing to do with a train fault. The reason comes down to the company running the trains, not its staff members and any "threat" needs to be dealt with robustly through the proper channels.

"Resource availability" and "shortage of train crew" are essentially the same thing when you think about it - except one is clear english and the other is actually rather vague. I am surprised TfW got that agreed, although certain TOCs have slightly different ways of explaining the same thing. For the record I also don't like "operational incident", but sometimes there is no easy way to explain staff error without getting into the minutiae of the railway (SPADs, wrong routing, wrong side door release, etc.).
I disagree that it's nonsense. Why not remove the cause of the threat at the root by having the correct reason. Let company management take the flak not the passenger facing staff. Sadly 'management incompetence' will never be allowed as a reason, but its a shortage of train crew is an outright lie on most occasions.

GN for example, there are often drivers sitting spare in depots that had previously signed the route and traction that would have been able to drive that train but cannot now due to the revised working arrangements. That's management incompetence not a shortage of train crew.
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
There's TOC representatives in Three Bridges ROC who should be dealing with CIS in response to adjustments made to services by control although I know the position isn't staffed 24/7.
Of course its staffed 24/7. Trains run all day 24/7, and get cancelled 24/7 as well. They're TOC employees, rather than 'representatives'.
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
I disagree that it's nonsense. Why not remove the cause of the threat at the root by having the correct reason.

"Rostering error" also "fits". Technically there isn't enough Drivers in the roster to cope.

Maybe there should also be one that says "control messed up"
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
3,905
Maybe there should also be one that says "control messed up"
The only reason control get involved is because something has gone wrong or someone else has messed up
If too many people are messing up at the same time for control to cope, that's not control's fault!
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
If too many people are messing up at the same time for control to cope, that's not control's fault!

The forum ate my smiley face :(

However, control do mess up. It's just part of the mess the railway often creates for itself. The phrase too many cooks often spring to mind. Chuck in the human element and it gets worse. Throw in the proverbial cluster... And you have stretched, over worked and understaffed departments.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Back To Thameslink.

RDH Seems okay some delays due to a points failure but I can't work out where? Is it GTW or Portsmouth Harbour? Because Yesterday the same problem had occurred when I was looking at departures from GTW it had said that "A Points Failure at this station means train running towards Portsmouth Harbour may be delayed revised or Cancelled"

How are Redhill Services affected? Are they stuck behind late running Portsmouth Harbours? Because One train has had its Reigate Call cancelled and is just running from RDH to Victoria


Oh and I new reason I don't think I've seen but must be quite common 09:13 is Delayed as it was "late from the depot"
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
A few minor delays due to a defective track. Anyone aware where this may be? Only 1 Thameslink Cancelled in the next hour due to Shortage of Drivers.

I do now think that this long spell of disruption from Thameslink is coming to a close. It's nearly the end of the Summer Holidays so hopefully more drivers will return.
 

XIX7007177

Member
Joined
6 Jun 2018
Messages
85
A few minor delays due to a defective track. Anyone aware where this may be? Only 1 Thameslink Cancelled in the next hour due to Shortage of Drivers.

I do now think that this long spell of disruption from Thameslink is coming to a close. It's nearly the end of the Summer Holidays so hopefully more drivers will return.
Bit too optimistic.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,014
Location
Surrey
A few minor delays due to a defective track. Anyone aware where this may be? Only 1 Thameslink Cancelled in the next hour due to Shortage of Drivers.

I do now think that this long spell of disruption from Thameslink is coming to a close. It's nearly the end of the Summer Holidays so hopefully more drivers will return.
This shows it as on Quarries north of Sand Tnl

1661192524301.png
 

BPN2022

Member
Joined
19 Jan 2022
Messages
143
Location
Blackpool
Reduced service between Bedford and Brighton from approximately 21:00 until the end of the day. Already advertised on National Rail website.

Must be a shortage of Traincrew for this evening ahead.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Reduced service between Bedford and Brighton from approximately 21:00 until the end of the day. Already advertised on National Rail website.

Must be a shortage of Traincrew for this evening ahead.
Yes that's what Thameslink have listed is that for the whole route including Redhill or just Bedford-Brighton if that makes sense.

Today is a good day for Thameslink in the RDH area today. No Cancelations and no delays.
 
Last edited:

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
31,103
Location
Redcar
The posts on CIS systems can now be found here. Further discussion should take place there please.
 

WizCastro197

Established Member
Joined
12 May 2022
Messages
1,468
Location
Reigate
Delays between GTW-RDH. Safety Inspection of track, Redhill doesn't seem to be too affected by this right now but it is advised that this will continue until at least
18:00

But No southbound trains at Earlswood, Horley or Salfords. What would one do if this continues well beyond peak?
 

Minstral25

Established Member
Joined
10 Sep 2009
Messages
1,967
Location
Surrey
So tonight Thameslink and Southern both have decided to run trains very slowly through Coulsdon South, Merstham, Earlswood, Salfords and Horley but refusing to let any commuters off the trains, which leaves hundreds of passengers to find alternative transport like buses and taxis to get home. They have also suspended all of the 9R services meaning some stations don't even have trains to watch the station go by out of.

These services have been sacrificed so that others may get home exactly on time. It is exceptionally wrong that one group of travellers are penalised constantly like this. Day in day out cancellations, full service withdrawals etc. along the Redhill route What is needed to get Thameslink just to run a basic service.
 
Status
Not open for further replies.