We are discussing a number of issues here.
England's Economic Heartland is a sub-national transport body having responsibility for the Oxford to Cambridge arc. They commissioned Network Rail to undertake studies. In proposing a St Albans to Hatfield rail corridor, I am responding to those studies. Full details are on the RailEnable.com website. Obviously proposing any new railway line is a major decision, not least since they are expensive. Nevertheless, with a good business case for a St Albans to Hatfield line, could I suggest this provides a context for discussions concerning the Abbey line.
The Hertsrail project has a focus on Hertfordshire and is intended to be accessible. Whether or not I have succeesed in that respect is for others to assess.
In writing this, I am not trying to blow my own trumpet, rather I am attempting to focus on improved transport connections in the Oxford - Cambridge arc.
When considered in the context of the Oxford to Cambridge arc, Hertfordshire Essex Rapid Transit (HERT) is a poor-quality proposal, since the focus on Hertfordshire is at the expense of travel overall in that arc. In contrast, Hertsrail has a focus on Hertfordshire but is not at all at the expense of transport provision supporting economic development across the Oxford to Cambridge arc.
There are other reasons why HERT is a poor-quality proposal. For example the A414 North Orbital Road is predicted to become congested, but buses turning off the Abbey line converted into a busway connect onto the A414. The suggestion that people would switch from car travel to bus travel, thereby reducing congestion on the A414, is highly questionable, whereas switching from car travel to train travel is more plausible. Moreover a St Albans to Hatfield railway does not add traffic to the A414.
So, to conclude this first point, I would be most grateful if readers would be able to consider the merits of Hertsrail as the conventional rail alternative to HERT.
Secondly, can the Abbey line stay as it is with a service every 45 minutes ? The council has made it very clear that this is an under-utilised corridor and no longer wants to live with it, for example in the A414 Corridor Strategy Technical Report. [ Details : Referenced papers and reports via Sitemap at RailEnable.com ] In passing, I hope folks will be able to acknowledge that I have worked assiduously on these matters. Alternative method of reasoning : if the council/Dft accepted the status quo i.e. a service every 45 minutes, the HERT proposal would not exist.
Thirdly, there is indeed a proposal to reduce service frequency on the line to every 60 minutes as from December. It seems to me that it should be opposed. For those who wish to oppose it, is the Hertsrail mailing list provided by myself a means by which we can gather together ? What assurances do I need to give so that the Hertsrail mailing list can provide such a service ? Details of the proposal : search for Abbey at
https://www.dec22timetablechange.co...inline-timetable-Changes-by-Route-06-2227.pdf
Stakeholder conference
https://www.dec22timetablechange.co.uk/
Fourthly, concerning the Cottonmill Lane crossing, is a bridge the best option ?
I appreciate the points raised and haven't responded to all of them, but then it isn't my job to do so. It is great when people work together for the sake of the Abbey line.