I was sort of hoping that Dore Station Junction would be re-positioned further North under the scheme, perhaps in the area of Abbey Lane.
The advantage would be that the turnouts would be on straight track rather than on the curve which I believe would be preferable to MR because vertical S&C is easier to maintain and allows higher speeds.
However, noting that the bridge over the River Sheaf was narrowed when the old Manchester lines were taken out, I imagine the cost of replacing the bridge with a wider structure was the deciding factor which precluded that.
Hope Valley Capacity Scheme updates
All has gone very quiet since the TWAO was confirmed; https://www.gov.uk/government/publications/network-rail-hope-valley-capacity-order It came into force on the 18th April; http://www.legislation.gov.uk/uksi/2018/446/made After a public announcement by Network Rail that work should start in...
www.railforums.co.uk
The advantage would be that the turnouts would be on straight track rather than on the curve which I believe would be preferable to MR because vertical S&C is easier to maintain and allows higher speeds.
However, noting that the bridge over the River Sheaf was narrowed when the old Manchester lines were taken out, I imagine the cost of replacing the bridge with a wider structure was the deciding factor which precluded that.