Following on the the above post, it mentions that Honiton area signalling is now TCB (Track Circuit Block) due it now being controlled by Basingstoke ROC.
I genuinely know nothing about signalling, so can it be assumed that if a signalling scheme moves signalling to be controlled by a ROC, that it is now TCB, and all other forms such as TB, etc have been upgraded?
I asked because NESA (National Electronic Sectional Appendix) shows the area as TB (Tokenless Block) but I know NESA can be wrong at times.
EDIT: Fixed TB description.

Thanks in advance.
Following on the the above post, it mentions that Honiton area signalling is now TCB (Track Circuit Block) due it now being controlled by Basingstoke ROC.
I genuinely know nothing about signalling, so can it be assumed that if a signalling scheme moves signalling to be controlled by a ROC, that it is now TCB, and all other forms such as TB, etc have been upgraded?
I asked because NESA (National Electronic Sectional Appendix) shows the area as TB (Tokenless Block) but I know NESA can be wrong at times.
EDIT: Fixed TB description.