It is going ahead. I should imagine the Penarth to Caerphilly and Penarth to Coryton services will stop there, so it could have up to 4tph. But that's just an assumption.Is there any update on Crwys Road station? Is it still going ahead? If so, what service pattern is it likely to see?
I guess so, but the bulk of the mainline between Cogan Junction and Grangetown is four tracks itself.
One hopes that, as well as the new canopy, resurfacing the platform might happen at some point. It looks a real mess at the moment.And also one at Llandaff: https://flic.kr/p/2nis6Bp
There wouldn't be any point in opening an inner city station with 2tph, no one would use it as buses would be far more frequentIt is going ahead. I should imagine the Penarth to Caerphilly and Penarth to Coryton services will stop there, so it could have up to 4tph. But that's just an assumption.
The Metro is the electrification of the Core Valley Lines (from Treherbert, Aberdare, Merthyr and Rhymney into Cardiff), as well as the Coryton and City Lines through the capital down to Cardiff Bay. The original budget of £743m consisted of £164m from the European Union, £445m from the Welsh Government and the £1.3bn City Deal for the Cardiff Capital Region and £125m from the UK Government.
The Welsh Government's transport body, Transport for Wales, said at this stage it couldn’t give any indication as to the expected overspend, with a range of projections currently being worked through, but it is likely to run into tens of millions of pounds. The project is not expected to be finished until 2024, a year later than previously expected.
James Price said on ITV Wales ‘Sharp End’ 16 May 2022 that the Tram-Trains in the valleys won't be in public service until 2024.
Programme is here:> https://www.itv.com/walesprogrammes/tags/sharp-end
"Not yet" is the aspirational jist of it. Initial plans are based on some on-street extensions around the Bay area.I notice that 398 Tram Trains have been ordered, will these actually leave the heavy rail to use the "tram" part of them? Cardiff doesn't have a tramway does it?
I notice that 398 Tram Trains have been ordered, will these actually leave the heavy rail to use the "tram" part of them? Cardiff doesn't have a tramway does it?
Enjoy these new trains then, ours in Sheffield are ok, but they are not fit to replace a proper train. Poor ride quality. Should have just got proper trains.There are politician led 'aspirational plans' (putting it kindly) though nothing firm right now.
The issue is that street running just simply won't work. The timings are just so tight at the top of the Valleys with single track sections, the whole timetable would either be in continuous chaos or would have to have huge amounts of buffering in the timetable (increasing journey times which is directly the opposite of what the new trains are supposed to do).
I can just make out some as-yet-uninstalled OLE foundation rebar cages beyond the white temporary barriers on the northbound side...Here's a photo of the partially laid junction for the new depot I took looking south (towards Cardiff) from the Taffs Well station footbridge.
25 May 2022
Actual street running in shared lanes with general traffic would indeed be a bad idea. But it might work if with what the French call "site propre" - unfenced but segregated from other vehicles, with traffic signal priority at any road crossings. That's what the tram-trains on the Continent do.There are politician led 'aspirational plans' (putting it kindly) though nothing firm right now.
The issue is that street running just simply won't work. The timings are just so tight at the top of the Valleys with single track sections, the whole timetable would either be in continuous chaos or would have to have huge amounts of buffering in the timetable (increasing journey times which is directly the opposite of what the new trains are supposed to do).
"TfW are outrageously bad at pretty much everything", whilst they push forward the biggest investment in rolling stock and infrastructure the railway in Wales has seen for generationsAdvertising update: the "Metro is coming" banner at Llandudno Junction has been gone for a while, but there's still one at Llandudno.
Really. TFW are outrageously bad at communication, signage, well, pretty much everything.
Track renewals, double tracking, piling for electrification masts, erecting electrification masts, new ballast, earthworks, upgrading signalling........anybody know what they did on the Ponty to Merthyr line on The Jubilee Weekend? TFW mention n othing as usual! Loads of bus replacements next few weekends and a whole week in July! Not looking forward to that!!
"TfW are outrageously bad at pretty much everything", whilst they push forward the biggest investment in rolling stock and infrastructure the railway in Wales has seen for generations![]()
Ms Allister added: "But, there is some technical work that can be done at Cardiff West imminently over the next few years, which will allow the frequencies that we were talking about on the City Line to be raised from two to four trains per hour and you are looking at a £20m to £30m price tag for that.
"Hugely different, yes, but they are each necessary stepping stones. You need that first bit of work at Cardiff West to allow that more strategic long-term solution to be delivered."
well if you're going as far as Llantrisant , you can go as far as Beddau - and from there - a mile or so up the track you have an alignment that could connect you right to Pontypridd.A report regarding the proposed Metro line from Fairwater (City Line) to Llantrisant via Cregiau has been published. Unfortunately, Media Wales do not provide a link to the actual report.
![]()
£500m tram train from Cardiff to Llantrisant proposed
A report making a case for a metro line between Llantrisant and Cardiff was launched at Cardiff Baywww.walesonline.co.uk