OK didn't know the present turnaround time.How would they get to Guildford & back in 36 minutes?
However if XC's two trains an hour are restored to/from Reading, then one per hour should be routed via Guildford terminating at Gatwick
OK didn't know the present turnaround time.How would they get to Guildford & back in 36 minutes?
That plan was scrapped many years ago. You’ll need more crew & more units & why a depot was set up at Three Bridges. XC aren’t particularly good at running with what they’ve got now unfortunately.OK didn't know the present turnaround time.
However if XC's two trains an hour are restored to/from Reading, then one per hour should be routed via Guildford terminating at Gatwick
That plan was scrapped many years ago. You’ll need more crew & more units & why a depot was set up at Three Bridges. XC aren’t particularly good at running with what they’ve got now unfortunately.
Portsmouth is already one change from XC services at Southampton (or indeed Basingstoke or Winchester).If there was capacity; that could allow XC to run more services to Guildford rather than just stopping at Reading. As that would put Portsmouth only one change away from XC stations, now whilst this wouldn't be as good as direct services, given the frequency from Portsmouth to Guildford an hourly service doing that would be more frequent than anything which happened before.
No, as above. There is no depot suitable for stabling or giving light servicing the XC units in the area. There is no capacity for CrossCounty to run reliably over the route and the journey times simply aren't competitive to make sense.OK didn't know the present turnaround time.
However if XC's two trains an hour are restored to/from Reading, then one per hour should be routed via Guildford terminating at Gatwick
It really couldn't. GWR to Gatwick already has reliability concerns that see trains terminated at Redhill if they present there late. Given the paucity of signalling on the line and the way it interacts with other services on the radial lines from London, Reading to Gatwick needs to be run as a self contained service to have any hope of being reliable.A similar case could be made for the extension of the XC services to run to Gatwick, rather than run the GWR services, and whilst that would be quite a slow run and require ASDO at the majority of stations (and some odd station stop points to not block level crossings) it could also be quite useful.
I was thinking along those lines, a EMR Derby-Birmingham for one. The paths freed from the ECML and from the WoE would go to LNER and GWR respectively.I'd hand the Turbostar-operated routes over to other train operators.
Transport for Wales could run the Cardiff-Birmingham service.
East Midlands Railway could operate the rest of those services.
It certainly feels that way.Agree its time maybe XC was disbanded as it is no longer fit for purpose. I say that with a heavy heart as ot used to be a really useful operator. But the provision is now so poor, and is increasingly ignoring the outer parts of its operation and so maybe splitting it up may help focus investment and improvements on different areas. Id start by giving Penzance to Birmingham to GWR.
Potentially, but at the same time if parts of the routes were taken over by other operators and good connections offered the service for passengers might actually be better. The only issue would be the need to change, but as I mentioned above many journeys are quicker changing already.Reviewed, certainly. However there's still a fair account that is useful about XC.
If XC was split up the new incumbents may decide to use different trains. So if LNER get Newcastle -Brum they may think a bimode IEP is better for some services and voyagers better for Harrogate and Hull at quieter times. Just an idea.I was thinking along those lines, a EMR Derby-Birmingham for one. The paths freed from the ECML and from the WoE would go to LNER and GWR respectively.
It certainly feels that way.
It should really offer regular and convenient cross-country services that effectively link vastly opposing areas of the country with grid connections at key hub stations en route. It just fails to do that anymore. It really needs a new, better composed, Operation Princess timetable without some of the extraneous services that were questionable at best. The first recast under Arriva broke a lot of connections, especially at Birmingham.
Agree re GWR Birmingham-Penzance, if not that a Birmingham-Bristol.
Potentially, but at the same time if parts of the routes were taken over by other operators and good connections offered the service for passengers might actually be better. The only issue would be the need to change, but as I mentioned above many journeys are quicker changing already.
There's certainly a market for long distance travel for leisure purposes without changing trains which deserves better service than today's XC setup.I think fundamentally, if we are going to have it, it needs to go back to its roots and design for being a slower, more direct service where on board comfort, the ability to work etc are provided for properly. That would mean units of sufficient length with an interior much more like the 397 than the Voyager, i.e. low density and lots of tables.
In many ways, "new TPE" is what XC should be like.
There's certainly a market for long distance travel for leisure purposes without changing trains which deserves better service than today's XC setup.
Offer low density seats, plenty of tables, luggage space including room for bikes, and restaurant with trolley service, customers will prefer a longer, less stressful journey rather than a short haul flight to Newquay or Bournemouth.
There is certainly a market, but the problem is that a large proportion of XC travellers are only going a few stations. The customers might prefer such spacious and luxurious trains, but are they economical to cater for these (probably majority) short distance commuter flows, where high density seating is much more appropriate. Even if every short haul flight passenger that could travel XC actually did (and that is unlikely because most will appreciate the much shorter journey time rather) this would be a tiny, tiny proportion of XCs passengers. Tail wagging the dog.There's certainly a market for long distance travel for leisure purposes without changing trains which deserves better service than today's XC setup.
Offer low density seats, plenty of tables, luggage space including room for bikes, and restaurant with trolley service, customers will prefer a longer, less stressful journey rather than a short haul flight to Newquay or Bournemouth.
There is certainly a market, but the problem is that a large proportion of XC travellers are only going a few stations. The customers might prefer such spacious and luxurious trains, but are they economical to cater for these (probably majority) short distance commuter flows, where high density seating is much more appropriate. Even if every short haul flight passenger that could travel XC actually did (and that is unlikely because most will appreciate the much shorter journey time rather) this would be a tiny, tiny proportion of XCs passengers. Tail wagging the dog.
It would be interesting to consider what a "core CrossCountry" might comprise.It should really offer regular and convenient cross-country services that effectively link vastly opposing areas of the country with grid connections at key hub stations en route. It just fails to do that anymore. It really needs a new, better composed, Operation Princess timetable without some of the extraneous services that were questionable at best. The first recast under Arriva broke a lot of connections, especially at Birmingham.
Agree re GWR Birmingham-Penzance, if not that a Birmingham-Bristol.
Something like that, but each of those 4 routes could be handed to other operators.It would be interesting to consider what a "core CrossCountry" might comprise.
Define it as InterCity-standard services that connect main routes, via Birmingham New Street, without duplicating the principal operator in the final section of any route.
That potentially leaves you with:
The last one is difficult to call. Terminating at Reading means that journeys to the South Coast require two changes (Reading and Basingstoke). Terminating at Basingstoke might be logical but it's a bit of a non-place to terminate. So Southampton?
- Birmingham–Manchester
- Birmingham–Bristol [because Bristol–Penzance is served by GWR]
- Birmingham–Leeds/York [because York–Newcastle/Scotland is served by LNER and TPE]
- Birmingham–Reading/Basingstoke/Southampton
I think that XC services did cater for these flows in BR days - it is just that (after the frequency improvements of Operation Princess particularly) more and more people have started commuting longer and longer distances [in the provinces this generally was limited to the affluent, and railway staff ], coupled with economies from the 80s to eliminate uneconomic local train service (often peak hours only) to minor and intermediate stations outwith the conurbations, rather than just dispensing with them. Putting on a shed load of peak period locals doesn't sound very cost effectiveReally, XC shouldn't (other than XC-Lite*) be dealing with those short-distance passengers other than incidentally - it didn't in BR days. Perhaps the answer is to keep XC at the lower frequency and add local services on those routes in the old paths. Manchester to Bristol for instance should be a fairly prime business and leisure long distance traveller route - and it doesn't even exist at the moment!
If there are large urban/commuter flows there should be long, high density commuter trains serving them.
* The 170 services should really be split between EMR, WMT and TfW as appropriate to the route, they are a poor fit in XC and always were.
I think that XC services did cater for these flows in BR days - it is just that (after the frequency improvements of Operation Princess particularly) more and more people have started commuting longer and longer distances [in the provinces this generally was limited to the affluent, and railway staff ], coupled with economies from the 80s to eliminate uneconomic local train service (often peak hours only) to minor and intermediate stations outwith the conurbations, rather than just dispensing with them. Putting on a shed load of peak period locals doesn't sound very cost effective
Not sure how, under the current ticketing system, commuters/ short distance passengers would be discouraged from using (and overcrowding) these proposed luxurious trains aimed at the long distance market ?
CrossCountry definitely did deal with short distance passengers in BR days. Some idea that their trains were full of people only ever making long distance journeys is rather taking rose tinted spectacles to what actually happened.Really, XC shouldn't (other than XC-Lite*) be dealing with those short-distance passengers other than incidentally - it didn't in BR days
I wouldn't call a single 323 or 350 an especially high capacity service for the stopping train between Birmingham and Wolverhampton. Certainly not given it has to serve all of the intermediate stations. Note that the fast service between Birmingham and Coseley has been withdrawn so the stoppers have to accommodate everyone from Tipton and Coseley now. They're rather busy.That depends where this overcrowding is happening. If it's on the likes of the Cov-Brum-Wolves corridor, there should be (and I believe is) an adequate local service at least half hourly along that line using high capacity EMUs. People might cram onto XC to save 2 minutes but they don't need to.
I wouldn't call a single 323 or 350 an especially high capacity service for the stopping train between Birmingham and Wolverhampton. Certainly not given it has to serve all of the intermediate stations.
The problem is, 'X' doesn't travel very often at all - even all of the 'X''s are crowded into a small part of the year and mostly on a few days, in any number.I think we're thinking about it totally the wrong way. There is absolutely a benefit of direct Birmingham to Penzance - it's a great holiday option, and with a family you won't want lots of changes. If it's hard to path, link it to the Exeter stopper.
"X* may change, but he/she/they won't change trains" was the last publicity campaign for ICXC before Virgin took it over. It summed up the network and its purpose absolutely spot-on.
* I can't remember them all, but there were a few different ones like this (made up rather than definitely from memory but they were very much like this):
"Sarah loves shopping, but she can't quite decide what look she wants. Her tastes may change, but she won't change trains. InterCity CrossCountry." (with a load of pictures of the same girl dressed in hugely different ways)
"Bob seems to get a new job every couple of weeks. His work may change, but he won't change trains. InterCity CrossCountry." (with a bloke dressed in lots of diffferent types of work clothes)
Those don't work to Wolverhampton, and the bay at Wolverhampton is only just long enough for a single 350. As usual your bias to the LNR side is showingMost services that go through to/from Euston are double 350s these days, though sometimes a third is added/removed at Northampton. I'd say a double 350 (or 323) would be a sensible standard length for such commuter services, and it's a heck of a lot cheaper to do that for a short journey (requiring maybe 2-3 more units) than to send 10 cars to Cornwall because the middle bit is a bit busy (requiring lots).
Oxford-Reading often uses 9 or 10-car 80x formations half hourly these days, anyone using XC for that journey is just a fool. The days of overcrowded short DMUs on those GWR services is long gone other than in disruption.
A lot of full 5-car 80x formations on the GWR services between Paddington and Oxford now. It might be time for passengers to switch back to the CrossCountry services for travelling between Reading and Oxford. Standing passengers of the 5-car 80x I travelled on yesterday between Slough and Paddington that had come from Worcester (although there was admittedly disruption involved).Oxford-Reading often uses 9 or 10-car 80x formations half hourly these days, anyone using XC for that journey is just a fool. The days of overcrowded short DMUs on those GWR services is long gone other than in disruption.
The problem is, 'X' doesn't travel very often at all - even all of the 'X''s are crowded into a small part of the year and mostly on a few days, in any number.
A lot of full 5-car 80x formations on the GWR services between Paddington and Oxford now. It might be time for passengers to switch back to the CrossCountry services for travelling between Reading and Oxford.
Those countries have committed the necessary billions to building "S bahn" and "U bahn" infrastructure that supports such services. We have chosen no to do so. Places like Oxford have no dedicated local rail infrastructure whatsoever. Birmingham obviously has some but nowhere near enough for a city of such size.Very rarely is cramming local passengers on IC trains the right approach. Sometimes it's unavoidable (see Reading commuters) but it almost never works particularly well, and most countries seem to realise that except us.
One of the main cross city lines in W mids (Cov - Wolverhampton) is also a very busy main line. One other (Brum - Longbridge also has quite a few long distance trains. Separating the locals from the longer distance trains would be quite disruptive.Those countries have committed the necessary billions to building "S bahn" and "U bahn" infrastructure that supports such services. We have chosen no to do so. Places like Oxford have no dedicated local rail infrastructure whatsoever. Birmingham obviously has some but nowhere near enough for a city of such size.
Those countries have committed the necessary billions to building "S bahn" and "U bahn" infrastructure that supports such services. We have chosen no to do so.
But we have daft stuff. Like Longbridge - Barnt Green. The outside rails should be the 'slows' and the inside ones the 'fasts'. But you would need an awkward junction at Barnt Green tho.Sometimes they have, but not always. There are comparable German routes with exactly the same sort of mixed traffic double track lines we have on that sort of route. The Rhein-Ruhr S-Bahn is much more like Castlefield than it is Merseyrail, for instance.
The problem is, 'X' doesn't travel very often at all - even all of the 'X''s are crowded into a small part of the year and mostly on a few days, in any number.
Sarah and Bob will both complain that the two through trains between their Origin and Destination are not timed to their convenience; someone on this forum will then suggest that every train is formed of through cars to every other (because they saw such a thing at Basel in the 1950s).
I am not doubting that some seemingly major flows, (like Manchester-Bristol) are not served directly, but it strikes me that the major problem is that each train is not comprised of sufficient carriages. This still wouldn't solve every gripe (the fact that the same rolling stock has to serve both large numbers of commuters at one hour/day and large numbers numbers of holidaymakers with luggage at another is always going to be a compromise). Short of compulsory reservation a la airlines, and trains capable of easy reconfiguration (or different sets of rolling stock, which is just too expensive nowadays), I don't see how everyone can be happy. Cue comments on how this was so easily done in 1950.
The quality of the infrastructure on the Dusseldorf - Duisburg - Essen - Dortmund axis isn't remotely comparable with what is happening in Manchester.Sometimes they have, but not always. There are comparable German routes with exactly the same sort of mixed traffic double track lines we have on that sort of route. The Rhein-Ruhr S-Bahn is much more like Castlefield than it is Merseyrail, for instance.
Here now comes the question of if we should have non-XC services which runs from Reading to the South Coast, which is time-competitive compared to travelling into Waterloo. However, electrification is a main issue here.It would be interesting to consider what a "core CrossCountry" might comprise.
Define it as InterCity-standard services that connect main routes, via Birmingham New Street, without duplicating the principal operator in the final section of any route.
That potentially leaves you with:
The last one is difficult to call. Terminating at Reading means that journeys to the South Coast require two changes (Reading and Basingstoke). Terminating at Basingstoke might be logical but it's a bit of a non-place to terminate. So Southampton?
- Birmingham–Manchester
- Birmingham–Bristol [because Bristol–Penzance is served by GWR]
- Birmingham–Leeds/York [because York–Newcastle/Scotland is served by LNER and TPE]
- Birmingham–Reading/Basingstoke/Southampton