Nottingham59
Established Member
Splitting from https://www.railforums.co.uk/threads/is-electrifying-windermere-worth-it.231413/ I was struck to realise that with battery trains you only need to electrify from Bicester Station to Winslow station to electify the whole of East-West Rail.
BEMUs like the Stadler Flirt AKKU need 20mins to recharge, and this gives them 80km/50m guaranteed range. At 100mph, this means 30miles of OHLE, but much less than this if the recharging section included station stops (where you would have to have special wide conductors to cope with the localised heating).
Where else could a short length of OHLE allow existing diesel services to be electrified?
BEMUs like the Stadler Flirt AKKU need 20mins to recharge, and this gives them 80km/50m guaranteed range. At 100mph, this means 30miles of OHLE, but much less than this if the recharging section included station stops (where you would have to have special wide conductors to cope with the localised heating).
Where else could a short length of OHLE allow existing diesel services to be electrified?