northwichcat
Veteran Member
A multi-million pound scheme will improve safety at a railway station and ease the threat of passengers falling off the platform. Network Rail is proposing to spend £12m on Salford Crescent station which serves the citys University because the platforms are too narrow. Transport bosses warned four years ago that a passengers could be accidentally pushed on to the tracks.
Now the station, used by more than a million people a year, will be closed for three months while work is carried out.
Salford Crescent is the only central stop where passengers can catch a train to either Manchester Victoria or Piccadilly - thanks to the 750-yard Windsor Link, built in the 1980s to connect Manchesters north-south rail divide. But it has proved so useful to students and commuters that its narrow platforms have become dangerously overcrowded.
One idea was to move the station a few hundred yards but that has been rejected because it would cost more than £50m.
Instead, Network Rail will move the ticket office from the platforms to the road level above and build a new staircase with a lift for disabled passengers. Platforms will be lengthened at each end, and a new canopy built so passengers can wait under cover.
Network Rails Simon Leyshon said the platforms are too short to take the six-carriage trains which TransPennine Express use at busy times and doors have to be locked to prevent passengers getting out of them where there is no platform. At two metres wide in places, they are only two thirds of the current minimum width of three metres. But councillors on the Greater Manchester Integrated Transport Authority remain unconvinced a single lift will be enough for disabled passengers.
http://menmedia.co.uk/manchestereve...form_peril_at_danger_salford_crescent_station
Now the station, used by more than a million people a year, will be closed for three months while work is carried out.
Salford Crescent is the only central stop where passengers can catch a train to either Manchester Victoria or Piccadilly - thanks to the 750-yard Windsor Link, built in the 1980s to connect Manchesters north-south rail divide. But it has proved so useful to students and commuters that its narrow platforms have become dangerously overcrowded.
One idea was to move the station a few hundred yards but that has been rejected because it would cost more than £50m.
Instead, Network Rail will move the ticket office from the platforms to the road level above and build a new staircase with a lift for disabled passengers. Platforms will be lengthened at each end, and a new canopy built so passengers can wait under cover.
Network Rails Simon Leyshon said the platforms are too short to take the six-carriage trains which TransPennine Express use at busy times and doors have to be locked to prevent passengers getting out of them where there is no platform. At two metres wide in places, they are only two thirds of the current minimum width of three metres. But councillors on the Greater Manchester Integrated Transport Authority remain unconvinced a single lift will be enough for disabled passengers.
http://menmedia.co.uk/manchestereve...form_peril_at_danger_salford_crescent_station
Last edited by a moderator:
